Loading...
HomeMy WebLinkAboutR2009-2R - 2009-2 RESURFACING No rf h Hastings Museum North De e Station 12th Street Hastings City Engineering Hastings, NE s-- zoo,' Hastings City Surveyor Date °$Fz DAVID L mxF. °= E-5004 ° .1 v awe: P <°e°°°<°° ®''010 OF EOR �� Hastings City Engineer 5-7— Zoo, Date Limits of Project: Hastings Ave. 9th Street to 14th Street R-2009-2 HASTINGS AVE. 9TH THRU 14TH MATERIALS - GENERAL REQUIREMENTS 1. Type of Asphaltic Oil for Tack coat Tack coat required under this project shall be SS -1H. Water used to dilute emulsified asphalt shall be mixed in approximate 50-50 proportion with the oil. The rate of application of the diluted emulsified asphalt shall generally be from .10 to .20 of a gallon per square yard. 2. Asphaltic Concrete Type 17 C asphalt according to the 1997 Standard State Specifications and its supplements. 3. Payment shall be made per ton asphalt and shall include all installation costs including, but not limited to sweeping and base preparation not otherwise provided for by separate pay item. NOTE: Contractor will take extra care to protect all survey markers, located in street, during construction. NOTE: Care will be taken to salvage existing manhole rings and covers and keep sets matched together. NOTE: Where pavement is milled, apply courses as specified to thickness as outlined on the plans or as specified in field by Engineer. NOTE: Salvage subbase in areas as specified on plans or as directed in field by Engineer. ASPHALT PAVEMENT SPEC. SHEET Laying, compacting and finishing shall be in accordance with sections 503 and 1028 of the 2007 Standard State Specifications and its supplements. Flagging and temporary traffic control for construction will not be paid for directly, but will be subsidiary to the contract. CONTRACTOR'S NOTE 1. Payment will be made for actual field quantities utilized and shall show precedence over contract estimated quantities. 2. Locations of all manholes and valves will be tied off and recorded prior to any work. Manholes will be kept covered and kept clean throughout all of resurfacing project. 3. All drives and approaches will be asphalted back, as directed by Engineer in field. 4. It will be the responsibility of the Contractor to dispose all pavement removal. 5. Any earth excavation will be disposed of on-site on adjacent lots. 6. Contractor will be required to notify property owners a minimum of 24 hours prior to any work being started, so cars, etc. can be moved. 7. Contractor will lay new asphalt surface in a two lift process. Unless otherwise specified by plans or Engineer. 8. Contractor will be required to have all utilities located prior to start of work. NOTES: The embankment and subgrade shall be adjusted to conform to the lines and grades on the plans in accordance with Section 205 and 302 of the 2007 Standard State Specifications and its supplements. The upper six (6) inches of the subgrade shall be scarified, mixed and recompacted to the following compaction requirements: Percent Density Moisture Minimum Requirements Maximum 95 Min. Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All subgrade compaction and water necessary for subgrade construction shall not be paid for directly but shall be considered subsidiary to the items of the contract. Excavation, backfilling, and sawing control joints, keyway, tie bars, dowel pins, and rubberized joint sealant shall be considered subsidiary to the unit price per square yard of pavement. CALL BEFORE YOU DIG DIGGERS HOTLINE OF NEBRASKA 1-800-331-5666 l ASPHALTIC CONCRETE, TYPE 17C w/.40 CRUSHED Asphaltic Concrete, Type 17C , shall conform to the AASHTO T245 test for a 50 blow mix criteria. Subsection 1007.01 in the 1997 Standard Specifications is amended to include Asphaltic Concrete, Type 17C. The combined mineral aggregate for Asphaltic Concrete, Type 17C, shall have a minimum crushed value of 40 percent. The crushed value for mineral aggregates shall follow the Special Provision, "CRUSHED AGGREGATE FOR ASPHALTIC CONCRETE". Of the combined mineral aggregate not more than 60 percent can be limestone. The target field air void shall be 3.5 percent. The gradation of the combined aggregates shall be such that a job mix formula meeting the gradation requirements shown below can be established. RANGE FOR TARGET VALUES (1/2" Gradation Band "A") SIEVE SIZE PERCENT PASSING 1 -inch %-inch '14 -inch 3/8 -inch No. 4 No.10 No. 30 No. 50 No. 200 100 98 100 94 100 80 98 52 88 32 70 17 38 10 24 3 7 The percent design target air void shall equal the field target plus one percent. Field control target air voids shall consist of a maximum equal to the target plus one percent and a minimum equal to the target minus one percent, based on the moving average of four tests. The minimum percent voids in mineral aggregates, (VMA) shall have a lab design of ** and field control value of **. The dust/ac ratio shall have a maximum (lab design) value of 1.2 and a maximum (cold feed) value of 1.4. j CITY OF HASTINGS, j \ ENGINEERING DEPT. Project R-2009 Resurfacing Project Praj. No. R2009-2 Hastings Ave. — 9th St. to 1 4th St. Description Asphalt Pavement Spec. Sheet Design By GWM Date 3/09 Contractor Drown By GWM Approved By Dm. No. 2 of 5 1,231' Remove Asphalt Intersection Remove ( Asphalt I Intersection Rsmove Asphalt Intersection Remove Concrete Intersection LIMITS OF RESURFACING PROJECT HASTINGS AVE: 9TH STREET TO 14TH STREET NORTH [> Scale: 100' 0' 100' 200' 300' Notes: Brick paving base (9th -12th Streets) and concrete sub—base (12th -14th Streets) may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing curb and gutters are in poor condition. Brick and concrete base materials will not withstand a lot of weight. If use of milling equipment will damage existing brick base, contractor may be required to use motor grader and and front end loader to remove asphalt surfacing. Inlays required shall be subsidiary to rotomill pavement. Leave in Place Concrete Intersection SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION FSTIMATFA QUANTITIES UNIT 1 ROTOMIT ,i PAVEMENT 2 ASPHALTIC CONCRETE TYPE 1700.40 3 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 4 EMULSIFIED ASPHALT (SS1H) TACK COAT 5 REMOVE CONCRETE PAVEMENT 6 REMOVE SIDEWALK 7 REMOVE 30" CURB & GUTTER 8 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 9 BUILD 6" PCC CONCRETE PAVEMENT (47B) 10 BUILD 8" PCC CONCRETE PAVEMENT (47B) 11 BUILD 30" COMB. CURB & GUTTER 12 BUILD 6" INTEGRAL CURB 13 BUILD 5" PCC CONCRETE SIDEWALK (47B) 14 ADJUST MANHOLE TO GRADE 15 ADJUST WATER VALVE TO GRADE 16 ADJUST GAS VALVE TO GRADE 17 ADJUST STORM INLE1 TO GRADE 18 PATCH ASPHALT DRIVEWAY 19 SAW CUT 20 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 8532 S.Y. 1499 TON 87 TON 2133 GAL. 500 S.Y. 872 S.F. 200 L.F. 150 S.Y. 0 S.Y. 520 S.Y. 200 L.F. 0 L.F. 872 S.F. 5 EACH 4 EACH 2 EACH 0 EACH 60 S.Y. 350 L.F. 1 L.S. ACITY OF HASTINGS, ENGINEERING DEPT. C)0 Project R-2009 Resurfacing Project Proj. No. R2009-2 Hastings Ave. — 9th St. to 1 4th St. °eSCnpNO° Asphalt Pavement Plan Sheet Design By GWM Dote 3/09 Contractor Drown ByGWM Approved By Om. No. 3 of 5 _JL 1,231' • Remove Asphalt intersection 6" 1/2" — 2" Existing Asphalt / Remove •.•..fl...u...flflU••I•flu!au!11fl110uu MN ■•MMM I 0 0) a) - in O \ \ v Brick Base Materials Remove Asphalt Intersection 31' Typical Section of Existing Streets 9th Street to 12th Street No Scale 1 1 /2" Top Lift 1" Base Lift 6" En.11 i111151111111111111.11111MMIIIIIMMINISINNIMoIIIMIMOSIIIIMISWIMMININOINNIM ■.■ ... .. v . .. .. .. • . . ... .. V •innu.il....0 31' Proposed Section 9th Street to 12th Street No Scale Notes: 100' Remove Asphalt Intersection II I .44,04 IL u1 1 I HASTINGS AVE RESURFACING 9TH STREET TO 12TH STREET NORTH (> Scale: o' / Hastings Avenue 100' 200' r i c Base Lift will consist of 1" Type 17C/0.40 Top Lift will consist of 1.5" Type 17C/0.40 Brick paving base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. If use of milling equipment will damge existing brick base, contractor may be required to use motor grader and and front end loader to remove asphalt surfacing. Inlays required shall be subsidiary to rotomill pavement. I SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION ESTIMA 114D QUANTITIES UNIT 1 ROTOMTT T PAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C/0.40 3 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 4 EMULSIFIED ASPHALT (SSIH) TACK COAT 5 REMOVE CONCRETE PAVEMENT 6 REMOVE SIDEWALK 7 REMOVE 30" CURB & GUTTER 8 BUILD 6" PCC CONCRETE PAVEMENT PATCHING(47B HIGH EARLY) 9 BUILD 6" PCC CONCRETE PAVEMENT (47B) 10 BUILD 8" PCC CONCRETE PAVEMENT (47B) 11 BUILD 30" COMB. CURB & GUTTER 12 BUILD 6" INTEGRAL CURB 13 BUILD 5" PCC CONCRETE SIDEWALK (47B) 14 ADJUST MANHOT.F TO GRADE 15 ADJUST WATER VALVE TO GRADE 16 ADJUST GAS VALVE TO GRADE 17 ADJUST STORM INLET TO GRADE 18 PATCH ASPHALT DRIVEWAY 19 SAW CUT 20 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 4783 S.Y. 918 TON 53 TON 1196 GAL. 0 S.Y. 628 S.F. 100 L.F. 100 S.Y. 0 S.Y. 0 S.Y. 100 L.F. 0 L.F. 628 S.F. 2 EACH 3 EACH 1 EACH 0 EACH 30 S.Y. 225 L.F. 1 L.S. Aj CITY OF HASTINGS, Y ENGINEERING DEPT. 00 Project R-2009 Resurfacing Project Proj. No. R2009-2 Hastings Ave. - 9th St. to 14th St. Description Asphalt Pavement Plan Sheet Design By GWM Drawn BYGWM Date 3/09 Approved By Contractor Dm. No. 4 of 5 95' 1,205 vv� Fire Station - North Hastings Museum OAC 6" U 0 Hastings Avenue Remove Concre e/ Asphalt intersection (440 S.Y.) rfuiid 8' Tk. Concrete Intersection (440 S.Y.) 1 1/2" Existing Asphalt / Remove Concrete Subgrade Materials • •. ..'P. ..... Y.r Y...yi.. 4a iJ 31' 30" Typical Section of Existing Streets 12th Street to 14th Street No Scale 1 1/2" Top Lift 1" Base Lift Concrete Subgrade Materials • 31' Proposed Section 12th Street to 14th Street No Scale HASTINGS AVE RESURFACING 12TH STREET TO 14TH STREET NORTH 1::› Scale: 100' 0' 100' r 200' Notes: Base Lift will consist of 1" Type 17C/0.40 Top Lift will consist of 1.5" Type 17C/0.40 Concrete sub—base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Gutter flow lines are to remain clear of asphalt. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing paving base and existing curb and gutters may be in poor condition. Inlays required shall be subsidiary to rotomill pavement. Leave :rPicce Concrote Intersection SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1 ROTOMILL PAVEMENT 2 ASPHALTIC CONCRETE TYPE 1700.40 3 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 4 EMULSIFIED ASPHALT (SS1H) TACK COAT 5 REMOVE CONCRETE PAVEMENT 6 REMOVE SIDEWALK 7 REMOVE 30" CURB & GUTTER 8 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 9 BUILD 6" PCC CONCRETE PAVEMENT (47B) 10 BUILD 8" PCC CONCRETE PAVEMENT (47B) 11 BUILD 30" COMB. CURB & GUTTER 12 BUILD 6" INTEGRAL CURB 13 BUILD 5" PCC CONCRETE SIDEWALK (47B) 14 ADJUST MANHOLE TO GRADE 15 ADJUST WATER VALVE TO GRADE 16 ADJUST GAS VALVE TO GRADE 17 ADJUST STORM INLEI TO GRADE 18 PATCH ASPHALT DRIVEWAY 19 SAW CUT 20 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 3749 S.Y. 581 TON 34 TON 937 GAL. 500 S.Y. 244 S.F. 100 L.F. 50 S.Y. 0 S.Y. 520 S.Y. 100 L.F. 0 L.F. 244 S.F. 3 EACH 1 EACH 1 EACH 0 EACH 30 S.Y. 125 L.F. 1 L.S. CITY OF HASTINGS, ENGINEERING DEPT. 00 Project R-2009 Resurfacing Project Proj. No. R2009-2 Hastings Ave. — 9th St. to 14th St. °CSC0pti00 Asphalt Pavement Plan Sheet Design By GWM Data 3/09 Contractor Drown By GWM Approved By Dm. No. 5 of 5