Loading...
HomeMy WebLinkAboutR2009-4R - 2009-4 RESURFACING rt h 14th 11th St. 10th St. 9th St. -te ❑ ®mmu Bun R lee:BwtLJei r� wEumu eweL___IE=3� Efl(I le Gil JI11,�*. ®EES m ii s m11111a H,�-- nrrumm,ffTimmwm ®bi6mo �.a , War:A Hill mTT CL�m; in== imic E rni h.� n -T [-m-`11- mi.I NT 11 Till i,ITft U -T 111211111111-IMAMm_kS 1 _l RH 7th St. 6th sic= 5th St. 4th St. 3rd St. Hastings City Surveyor So$-zaa9 Date Hastings City Engineering Hastings, NE 6' i 5-7- tocy Hastings City Engineer Date Limits of Colorado BNSF RR Project: Ave. to to 14th Street COLORADO AVE. BNSF RR THRU 14TH MATERIALS - GENERAL REQUIREMENTS 1. Type of Asphaltic Oil for Tack coat Tack coat required under this project shall be SS -1 H. Water used to dilute emulsified asphalt shall be mixed in approximate 50-50 proportion with the oil. The rate of application of the diluted emulsified asphalt shall generally be from .10 to .20 of a gallon per square yard. 2. Asphaltic Concrete Type 17 C asphalt according to the 1997 Standard State Specifications and its supplements. 3. Payment shall be made per ton asphalt and shall include all installation costs including, but not limited to sweeping and base preparation not otherwise provided for by separate pay item. NOTE: Contractor will take extra care to protect all survey markers, located in street, during construction. NOTE: Care will be taken to salvage existing manhole rings and covers and keep sets matched together. NOTE: Where pavement is milled, apply courses as specified to thickness as outlined on the plans or as specified in field by Engineer. NOTE: Salvage subbase in areas as specified on plans or as directed in field by Engineer. ASPHALT PAVEMENT SPEC. SHEET Laying, compacting and finishing shall be in accordance with sections 503 and 1028 of the 2007 Standard State Specifications and its supplements. Flagging and temporary traffic control for construction will not be paid for directly, but will be subsidiary to the contract. CONTRACTOR'S NOTE 1. Payment will be made for actual field quantities utilized and shall show precedence over contract estimated quantities. 2. Locations of all manholes and valves will be tied off and recorded prior to any work. Manholes will be kept covered and kept clean throughout all of resurfacing project. 3. All drives and approaches will be asphalted back, as directed by Engineer in field. 4. It will be the responsibility of the Contractor to dispose all pavement removal. 5. Any earth excavation will be disposed of on-site on adjacent lots. 6. Contractor will be required to notify property owners a minimum of 24 hours prior to any work being started, so cars, etc. can be moved. 7. Contractor will lay new asphalt surface in. a two lift process. Unless otherwise specified by plans or Engineer. 8. Contractor will be required to have all utilities located prior to start of work. NOTES: The embankment and subgrade shall be adjusted to conform to the lines and grades on the plans in accordance with Section 205 and 302 of the 2007 Standard State Specifications and its supplements. The upper six (6) inches of the subgrade shall be scarified, mixed and recompacted to the following compaction requirements: Percent Density Moisture Minimum Requirements Maximum 95 Min. Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All subgrade compaction and water necessary for subgrade construction shall not be paid for directly but shall be considered subsidiary to the items of the contract. Excavation, backfilling, and sawing control joints, keyway, tie bars, dowel pins, and rubberized joint sealant shall be considered subsidiary to the unit price per square yard of pavement. CALL BEFORE YOU DIG DIGGERS HOTLINE OF NEBRASKA 1-800-331-5666 ASPHALTIC CONCRETE, TYPE 17C w/.40 CRUSHED Asphaltic Concrete, Type 17C , shall conform to the AASHTO T245 test for a 50 blow mix criteria. Subsection 1007.01 in the 1997 Standard Specifications is amended to include Asphaltic Concrete, Type 17C. The combined mineral aggregate for Asphaltic Concrete, Type 17C, shall have a minimum crushed value of 40 percent. The crushed value for mineral aggregates shall follow the Special Provision, "CRUSHED AGGREGATE FOR ASPHALTIC CONCRETE". Of the combined mineral aggregate not more than 60 percent can be limestone. The target field air void shall be 3.5 percent. The gradation of the combined aggregates shall be such that a job mix formula meeting the gradation requirements shown below can be established. RANGE FOR TARGET VALUES (1/2" Gradation Band "A") SIEVE SIZE PERCENT PASSING 1 -inch 100 %-inch 98 100 %-inch 94 100 3/8 -inch 80 98 No.4 52 88 No.10 32 70 No. 30 17 38 No. 50 10 24 No.200 3 7 The percent design target air void shall equal the field target plus one percent. Field control target air voids shall consist of a maximum equal to the target plus one percent and a minimum equal to the target minus one percent, based on the moving average of four tests. The minimum percent voids in mineral aggregates, (VMA) shall have a lab design of ** and field control value of **. The dust/ac ratio shall have a maximum (lab design) value of 1.2 and a maximum (cold feed) value of 1.4. ASPHALTIC CONCRETE, TYPE 14 Asphaltic Concrete, Type 14, shall conform to the AASHTO T245 test for a 50 blow mix criteria. Subsection 1007.01 in the Standard Specifications is amended to include Asphaltic Concrete, Type 14. The combined mineral aggregate for Asphaltic Concrete, Type 14, shall have a minimum crushed value of 60 percent. The crushed value for mineral aggregates shall follow the Special Provision, "CRUSHED AGGREGATE FOR ASPHALTIC CONCRETE". Of the combined mineral aggregate not more than 60 percent can be limestone. The target field air void shall be 4.0 percent. The gradation of the combined aggregates shall be such that a job mix formula meeting the gradation requirements shown below can be established. SIEVE SIZE 1 -inch %-inch '%-inch 3/8 -inch No. 4 No. 10 No. 30 No. 50 No. 200 RANGE FOR TARGET VALUES (314" Gradation Band) PERCENT PASSING Min. Max. 100 98 100 76 93 60 88 42 78 27 60 14 38 8 21 3 7 The percent design target air void shall equal the field target plus one percent. Field control target air voids shall consist of a maximum equal to the target plus one percent and a minimum equal to the target minus one percent, based on the moving average of four tests. The minimum percent voids in mineral aggregates, (VMA) shall have a lab design of ** and field control value of **. The dust/ac ratio shall have a maximum (lab design) value of 1.2 and a maximum (cold feed) value of 1.4. **VMA Requirements: Minimum VMA = Air Voids (%) + 12% j CITY OF HASTINGS, j \ ENGINEERING DEPT. 0 Project R-2009 Resurfacing Project Proj. No. R2009-4 Colorado Ave. — BNSF RR to 14th St. Description Asphalt Pavement Spec. Sheet Design By GWM Dote 2/09 Contractor Drawn By GWM Approved By Om. No. 2 of 8 6" 3rd Street 3 1/2" Existing Asphalt / Remove k• • 'tr 0) o L t Concrete Subgrade 11 1 ; I l0 L N -c h m m L to 6,068' 31' 30" Typical Section of Existing Streets BNSF RR thru 14th Street No Scale 1 1/2" Top Lift 'k2" Base Lift * Concrete Subgrade Typical Proposed Section BNSF RR thru 14th Street No Scale * Typical: See individual sheets for details specific to each section of project. LIMITS OF RESURFACING PROJECT COLORADO AVE: BNSF RR TO 14TH STREET NORTH 4> Scale: oo' o' o0' oo' ?00' Notes: m •m (n -c O 43 m t -4- u Concrete sub—base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipmentover and around this Project. Existing curb and gutters are in poor condition. Brick and concrete base materials will not withstand a lot of weight. Inlays required shall be subsidiary to rotomill pavement. t 0 0 L CD m L SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1 1 ROTOMIT T PAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C/0.40 3 ASPHALTIC CONCRETE TYPE 14 4 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 5 EMULSIFIED ASPHALT (SS1H) TACK COAT 6 REMOVE CONCRETE PAVEMENT 7 REMOVE SIDEWALK 8 REMOVE 30" CURB & GUTTER 9 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 10 BUILD 6" PCC CONCRETE PAVEMENT (47B) 11 BUILD 8" PCC CONCRETE PAVEMENT (47B) 12 BUILD 30" COMB. CURB & GUTTER 13 BUILD 6" INTEGRAL CURB 14 BUILD 5" PCC CONCRETE SIDEWALK (47B) 15 ADJUST MANHOT F TO GRADE 16 ADJUST WATER VALVE TO GRADE 17 ADJUST GAS VALVE TO GRADE 18 ADJUST STORM INLET TO GRADE 19 PATCH ASPHALT DRIVEWAY 20 SAW CUT 21 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 18704 4060 532 267 4676 317 2478 520 350 75 242 520 30 2478 23 9 3 7 550 1154 1 S.Y. TON TON TON GAL. S.Y. S.F. L.F. S.Y. S.Y. S.Y. L.F. L.F. S.F. EACH EACH EACH EACH S.Y. L.F. L.S. ACITY OF HASTINGS, ENGINEERING DEPT. 00 Project R-2009 Resurfacing Project Pros* N0R2009-4 Colorado Ave. — BNSF RR to 14th St. Description Asphalt Pavement Plan Sheet Design By GWM Dote 2/09 Contractor Drown DyGWM Approved By Dm. No. 3 of 8 6" 390' 40' 267' 3" Existing Asphalt / Remove 0 0 s- 4-- m Resurface asphalt return 0 t— i 0 to L 0 0 c 0 a L 2nd Street Remove Alley Return & Sidewalk Q Build 8" PCC Ailey Return & Sidewalk 3rd Street Colorado Avenue r Build Curb & Gutter on East Side 0 Concrete & Brick Subgrode Materials 0 100' O 11111111 Remove Asphalt Intersection COLORADO AVE RESURFACING BNSF RR TO 3RD STREET NORTH [:› Scale: 0' 100' O O Remove >. Build 8" PCC Alley Return Alley Return & Sidewalk Q & Sidewalk 200' 30" •. .....: a.'.a...: Typical Section of Existing Streets BNSF RR to 3rd Street No Scale 1 1/2" Top Lift 2" Base Lift Concrete & Brick Subgrade Materials 31' Proposed Section BNSF RR to 3rd Street No Scale Notes: s Leave in Place Asphalt Intersection Base Lift will consist of 2" Type 170/0.40 Top Lift will consist of 1.5" Type 170/0.40 Sub—base may require various patching to be determined by Engineer after milling. operation and street has been cleaned. Existing base is a mix of concrete and brick paving materials. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing paving base and existing curb and gutters may be in poor condition. Inlays required shall be subsidiary to rotomill pavement. SUMMARY OF QUANTITIES ITFiVI NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1 ROTOMILL PAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C/0.40 3 ASPHALTIC CONCRETE TYPE 14 4 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 5 EMULSIFIED ASPHALT (SS1H) TACK COAT 6 REMOVE CONCRETE PAVEMENT 7 REMOVE SIDEWALK 8 REMOVE 30" CURB & GUTTER 9 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 10 BUILD 6" PCC CONCRETE PAVEMENT (47B) 11 BUILD 8" PCC CONCRETE PAVEMENT (47B) 12 BUILD 30" COMB. CURB & GUTTER 13 BUILD 6" INTEGRAL CURB 14 BUILD 5" PCC CONCRETE SIDEWALK (47B) 15 ADJUST MANHOT F TO GRADE 16 ADJUST WATER VALVE TO GRADE 17 ADJUST GAS VALVE TO GRADE 18 ADJUST STORM INLET TO GRADE 19 PATCH ASPHALT DRIVEWAY 20 SAW CUT 21 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 2717 S.Y. 534 TON 0 TON 31 TON 679 GAL. 67 S.Y. 520 S.F. 236 L.F. 100 S.Y. 0 S.Y. 67 S.Y. 236 L.F. 0 L.F. 520 S.F. 5 EACH 4 EACH 1 EACH 6 EACH 0 S.Y. 354 L.F. 1 L.S. ,, CITY OF HASTINGS, ENGINEERING DEPT. Project R-2009 Resurfacing Project Proj. N0R2009-4 Colorado Ave. — BNSF RR to 14th St. Descnptan Asphalt Pavement Plan Sheet Design ey GWM Date 2/09 Contractor Drown BYGWM Approved By Dm. No. 4 of 8 6" —►1 i-- 1263' 2 L Remove >. Alley Return . & Sidewalk < J i Build 8" P0C Alley Return & Sidewalk 1 .eave in place asph intersection t Remove 0 Alley Return & Sidewalk 3 1/2" Existing Asphalt / Remove Build 8" P00 Ailey Return & Sidewalk 31' Remove >. Build 8" PCC Alley Return w Alley Return & Sidewolk Q & Sidewalk a) m L s 0 Remove asphalt intersection Concrete Subgrade 100' Rernove Ailey Return m & Sidewolk Q Build 8" PCC Alley Return Sc Sidewalk COLORADO AVE RESURFACING 3RD STREET TO 7TH STREET NORTH El? Scale: o' 0 01 Remove asphalt intersection 0 M a U J L 0 100' 200' 30" Typical Section of Existing Streets 3rd Street to 7th Street No Scale 1 1 /2" Top Lift 2" Base Lift Concrete Subgrode Proposed Section 3rd Street to 7th Street No Scale Notes: Base Lift will consist of 2" Type 17C/0.40 Top Lift will consist of 1.5" Type 17C/0.40 Concrete sub—base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing paving base and existing curb and gutters may be in poor condition. Inlays required shall be subsidiary to rotomill pavement. 0 0 o 0 N a) L N s `1— t9 Resurface asphalt return Rernove >. Alley Return m & Sidewalk 4 Build 8" P00 Alley Return & Sidewalk Leave in place asph intersection SUMMARY OF QUANTITIES J ITEIVI NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1 ROTOMI7J PAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C/0.40 3 ASPHALTIC CONCRETE TYPE 14 4 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 5 EMULSIFIED ASPHALT (SS IH) TACK COAT 6 REMOVE CONCRETE PAVEMENT 7 REMOVE SIDEWALK 8 REMOVE 30" CURB & GUTTER 9 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 10 BUILD 6" PCC CONCRETE PAVEMENT (47B) 11 BUILD 8" PCC CONCRETE PAVEMENT (47B) 12 BUILD 30" COMB. CURB & GUTTER 13 BUILD 6" INTEGRAL CURB 14 BUILD 5" PCC CONCRETE SIDEWALK (47B) 15 ADJUST MANHOl F TO GRADE 16 ADJUST WATER VALVE TO GRADE 17 ADJUST GAS VALVE TO GRADE 18 ADJUST STORM INLET TO GRADE 19 PATCH ASPHALT DRIVEWAY 20 SAW CUT 21 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 4653 S.Y. 1080 TON 0 TON 63 TON 1163 GAL. 175 S.Y. 938 S.F. 50 L.F. 100 S.Y. 0 S.Y. 175 S.Y. 50 L.F. 0 L.F. 938 S.F. 9 EACH 2 EACH 0 EACH 1 EACH 100 S.Y. 250 L.F. 1 L.S. A CITY OF HASTINGS, ENGINEERING DEPT. 170 Project R-2009 Resurfacing Project PfoJ. "082009-4 Colorado Ave. — BNSF RR to 14th St. Descnpuon Asphalt Pavement Plan Sheet Design By GWM Dote 2/09 Contractor Drown BY 8GWM Approved Sy Dm. No. 5 of 8 6" —►iH / a) a) L.. it/5 4- 0 I I I lm Leave iri ploce asph intersection 3" Existing Asphalt / Remove Concrete Subgrade 31' 1,430" Typical Section of Existing Streets 7th Street thru 9th Street No Scale 2" Top Lift 2" Base Lift Concrete Subgrade .. v •a'a '4. 31' Proposed Section 7th Street thru 9th Street No Scale 100' 0 1278' n COLORADO AVE RESURFACING 7TH STREET TO 9TH STREET NORTH [> Scale: o' 100' 0 a HT /-1 200' Notes: Base Lift will consist of 2" Type 17C/0.40 Top Lift will consist of 2" Type 17C/0.40 Concrete sub—base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing paving base and existing curb and gutters may be in poor condition. Inlays required shall be subsidiary to rotomiil pavement. fl 0 Remove cspno intersection SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1 ROTOMILLPAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C/0.40 3 ASPHALTIC CONCRETE TYPE 14 4 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 5 EMULSIFIED ASPHALT (SS1H) TACK COAT 6 REMOVE CONCRETE PAVEMENT 7 REMOVE SIDEWALK 8 REMOVE 30" CURB & GUTTER 9 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 10 BUILD 6" PCC CONCRETE PAVEMENT (4713) 11 BUILD 8" PCC CONCRETE PA VEMENT (4713) 12 BUILD 30" COMB. CURB & GUTTER 13 BUILD 6" INTEGRAL CURB 14 BUILD 5" PCC CONCRETE SIDEWALK (47B) 15 ADJUST MANHOI F TO GRADE 16 ADJUST WATER VALVE TO GRADE 17 ADJUST GAS VALVE TO GRADE 18 ADJUST STORM INLET TO GRADE 19 PATCH ASPHALT DRIVEWAY 20 SAW CUT 21 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 4708 1042 0 61 1177 0 520 50 50 0 0 50 0 520 3 0 0 0 200 200 1 S.Y. TON TON TON GAL. S.Y. S.F. L.F. S.Y. S.Y. S.Y. L.F. L.F. S.F. EACH EACH EACH EACH S.Y. L.F. L.S. ,. CITY OF HASTINGS, ENGINEERING DEPT. Project R-2009 Resurfacing Project Proj. NoR2009-4 Colorado Ave. — BNSF RR to 14th St. Description Asphalt Pavement Pian Sheet Design By GWM Dat, 2/09 Controctor Drawn B'GWM Approved Dy Dm. No. 6 of 8 6" ---1 i -- 308' 30' 320' 64' 520' 70' Fl R U O 3 1/2" Existing Asphalt / Remove J Concrete Subgrade I �n 30" Typical Section of Existing Streets 9th Street thru 12th Street No Scale 2" Top Lift 2" Base Lift Concrete Subgrade :h.' " 4' ":: •.'e.; ::: `i;::": . . 31' Proposed Section 9th Street thru 12th Street No Scale r Remove Concrete Volley Gutter (40 S.Y.) Build 8" PCC Pavement Valley Gutter (40 S.Y.) Notes: N m L .0 -4- L I= O v a Remove asphait intersection COLORADO AVE RESURFACING 9TH STREET TO 12TH STREET NORTH 1::› Scale: 100' 0' 100' 200' f Flow lines are to be covered on Top Lift from 9th to 12th. Base Lift will consist of 2" Type 17C/0.40 Top Lift will consist of 2" Type 17C/0.40 Concrete sub—base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing paving base and existing curb and gutters may be in poor condition. Inlays required shall be subsidiary to rotomill pavement. 12th Street SUMMARY OF QUANTITIES 1 Leave in Race Asphalt n ereection ITEM NO. DESCRIPTION ESTIMATED QUANT In. UNIT 1 ROTOMILL PAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C/0.40 3 ASPHALTIC CONCRETE TYPE 14 4 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 5 EMULSIFIED ASPHALT (SSIH) TACK COAT 6 REMOVE CONCRETE PAVEMENT 7 REMOVESIDEWALK 8 REMOVE 30" CURB & GUTTER 9 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 10 BUILD 6" PCC CONCRETE PAVEMENT (47B) 11 BUILD 8" PCC CONCRETE PAVEMENT (47B) 12 BUILD 30" COMB. CURB & GUTTER 13 BUILD 6" INTEGRAL CURB 14 BUILD 5" PCC CONCRETE SIDEWALK (47B) 15 ADJUST MANHOLE TO GRADE 16 ADJUST WATER VALVE TO GRADE 17 ADJUST GAS VALVE TO GRADE 18 ADJUST STORM INLET TO GRADE 19 PATCH ASPHALT DRIVEWAY 20 SAW CUT 21 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 4816 1180 0 68 1204 40 500 160 100 40 0 160 0 500 3 1 1 0 200 250 1 S.Y. TON TON TON GAL. S.Y. S.F. L.F. S.Y. S.Y. S.Y. L.F. L.F. S.F. EACH EACH EACH EACH S.Y. L.F. L.S. . CITY OF HASTINGS, ENGINEERING DEPT. Project R-2009 Resurfacing Project Proj. N0R2009-4 Colorado Ave. — BNSF RR to 14th St. DescriPBon Asphalt Pavement Plan Sheet Design By GWM Date 22109 Contractor Drown By GWM Approved By Dm. No. 7 of 6" * 575' * Do not rotomill or overlay concrete street surface. Identify and replace defective concrete sections. 1. • 421 Concrete Pavement Typical Section of Existing Streets 12th Street thru 13th Street No Scale 6" 5" Asphalt Pavement f 31' 2" Top Lift 2" Intermediate Lift 3" Base Lift Typical Section of Existing Streets 13th Street thru 14th Street No Scale 7" Asphalt Pavement Proposed Section 13th Street thru 14th Street No Scale * * 615' Saw cut and reset manhole. Leave in place concrete intersection COLORADO AVE RESURFACING 12TH STREET TO 14TH STREET NORTH 4> Scale: 100' 0' 100' 200' Notes: ** Rotomill asphalt paving to remove material and expose base. Identify and repair defective areas of base. Identify and repair broken curb. Resurface in accordance with plans. CD CD 0 L in t .4- U HT Defective reinforced concrete paving to be identified and repaired from 12th to 13th. Mill and remove asphalt paving from 13th to 14th. Pave in accordance with plans. Flow lines are NOT to be covered on from 13th to 14th. Base Lift will consist of 3" Type 14 (or Type SP4) Intermediate Lift will consist of 2" Type 14 (or Type SP4) Top Lift will consist of 2" Type 170/0.40 Mill existing asphalt and prepare grade for new asphalt paving. Concrete sub—base may require various patching to be determined by Engineer aftermilling operation and street has been cleaned. Millings shall become the property of the contractor. Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing curb and gutters may be in poor condition. Inlays required shall be subsidiary to rotomill pavement. 0 0 r SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1 ROTOMILLPAVEMENT 2 ASPHALTIC CONCRETE TYPE 17C10.40 3 ASPHALTIC CONCRETE TYPE 14 4 ASPHALTIC CEMENT PERFORMANCE GRADED BINDER (64-28) 5 EMULSIFIED ASPHALT (SS1H) TACK COAT 6 REMOVE CONCRETE PAVEMENT 7 REMOVE SIDEWALK 8 REMOVE 30" CURB & GUTTER 9 BUILD 6" PCC CONCRETE PAVEMENT PATCHING (47B HIGH EARLY) 10 BUILD 6" PCC CONCRETE PAVEMENT (47B) 11 BUILD 8" PCC CONCRETE PAVEMENT (47B) 12 BUILD 30" COMB. CURB & GUTTER 13 BUILD 6" INTEGRAL CURB 14 BUILD 5" PCC CONCRETE SIDEWALK (47B) 15 ADJUST MANHOLE TO GRADE 16 ADJUST WATER VALVE TO GRADE 17 ADJUST GAS VALVE TO GRADE 18 ADJUST STORM INLET TO GRADE 19 PATCH ASPHALT DRIVEWAY 20 SAW CUT 21 TRAFFIC CONTROL, BARRICADES, AND MAINTENANCE THEREOF 1810 S.Y. 224 TON 532 TON 44 TON 453 GAL. 35 S.Y. 0 S.F. 24 L.F. 0 S.Y. 35 S.Y. 0 S.Y. 24 L.F. 30 L.F. 0 S.F. 3 EACH 2 EACH 1 EACH 0 EACH 50 S.Y. 100 L.F. 1 L.S. A CITY OF HASTINGS, ENGINEERING DEPT. Project R-2009 Resurfacing Project Proj. N°R2009-4 Colorado Ave. — BNSF RR to 14th St. Description Asphalt Pavement Plan Sheet Design By Dote 2109 Contractor Drown BYGWM Approved By Dm. No. 8 of 8