HomeMy WebLinkAboutR2009-3JI
R - 2009-3 RESURFACING
l
North
9th Street
University
7th Street
0
BEE CO
WET CO
in
E-ji----_rr�'(E
if\ / Tnimmin m DI:1Q
in
/
DIDELQIIEELTirillillin ELI's)111.:QUM ....
MIMI
�v muwarren- Im ®mm,-ghmonom
Ilikl
6th Street
5th Street
4th Street
3rd Street
2nd St.
/
Hastings City Surveyor
Date
Hastings City Engineering
Hastings, NE
Hastings City Engineer
200y
Date
Limits of Project:
California Ave.
2nd Street to 9th Street
R-2009-3 CALIFORNIA AVE. 2ND THRU 9TH
MATERIALS - GENERAL REQUIREMENTS
1. Type of Asphaltic Oil for Tack coat
Tack coat required under this project shall be SS -1H.
Water used to dilute emulsified asphalt shall be mixed in
approximate 50-50 proportion with the oil. The rate of
application of the diluted emulsified asphalt shall
generally be from .10 to .20 of a gallon per square yard.
2. Asphaltic Concrete
Type 17 C asphalt according to the 1997 Standard State
Specifications and its supplements.
3. Payment shall be made per ton asphalt and shall include all
installation costs including, but not limited to sweeping and
base preparation not otherwise provided for by separate
pay item.
NOTE: Contractor will take extra care to protect all survey markers,
located in street, during construction.
NOTE: Care will be taken to salvage existing manhole rings
and covers and keep sets matched together.
NOTE: Where pavement is milled, apply courses
as specified to thickness as outlined on the
plans or as specified in field by Engineer.
NOTE: Salvage subbase in areas as specified
on plans or as directed in field by Engineer.
ASPHALT PAVEMENT SPEC. SHEET
Laying, compacting and finishing shall be in accordance with sections
503 and 1028 of the 2007 Standard State Specifications and its supplements.
Flagging and temporary traffic control for construction will not be paid
for directly, but will be subsidiary to the contract.
CONTRACTOR'S NOTE
1. Payment will be made for actual field quantities utilized and
shall show precedence over contract estimated quantities.
2. Locations of all manholes and valves will be tied off and recorded
prior to any work. Manholes will be kept covered and kept clean
throughout all of resurfacing project.
3. All drives and approaches will be asphalted back, as directed by
Engineer in field.
4. It will be the responsibility of the Contractor to dispose all
pavement removal.
5. Any earth excavation will be disposed of on-site
on adjacent lots.
6. Contractor will be required to notify property owners a minimum of
24 hours prior to any work being started, so cars, etc. can be moved.
7. Contractor will lay new asphalt surface in a two lift process.
Unless otherwise specified by plans or Engineer.
8. Contractor will be required to have all utilities located prior to
start of work.
NOTES:
The embankment and subgrade shall be adjusted to conform to the lines and
grades on the plans in accordance with Section 205 and 302 of the 2007
Standard State Specifications and its supplements. The upper six (6) inches of
the subgrade shall be scarified, mixed and recompacted to the following
compaction requirements:
Percent Density Moisture Minimum Requirements Maximum
95 Min.
Opt. -3% Opt. +3%
Areas not meeting specified moisture density test requirements shall be
removed and recompacted at the Contractor's expense.
All subgrade compaction and water necessary for subgrade construction
shall not be paid for directly but shall be considered subsidiary to the
items of the contract.
Excavation, backfilling, and sawing control joints, keyway, tie bars,
dowel pins, and rubberized joint sealant shall be considered subsidiary
to the unit price per square yard of pavement.
CALL BEFORE YOU DIG
DIGGERS
HOTLINE
OF NEBRASKA
1-800-331-5666
ASPHALTIC CONCRETE, TYPE 17C w/.40 CRUSHED
Asphaltic Concrete, Type 17C , shall conform to the AASHTO T245 test for a
50 blow mix criteria.
Subsection 1007.01 in the 1997 Standard Specifications is amended to include
Asphaltic Concrete, Type 17C.
The combined mineral aggregate for Asphaltic Concrete, Type 17C, shall
have a minimum crushed value of 40 percent. The crushed value for mineral
aggregates shall follow the Special Provision, "CRUSHED AGGREGATE FOR
ASPHALTIC CONCRETE". Of the combined mineral aggregate not more than
60 percent can be limestone. The target field air void shall be 3.5 percent.
The gradation of the combined aggregates shall be such that a job mix
formula meeting the gradation requirements shown below can be established.
RANGE FOR TARGET VALUES
(1/2" Gradation Band "A")
SIEVE SIZE PERCENT PASSING
1 -inch
%-inch
'/z -inch
3/8 -inch
No. 4
No.10
No. 30
No. 50
No. 200
100
98 100
94 100
80 98
52 88
32 70
17 38
10 24
3 7
The percent design target air void shall equal the field target plus one
percent. Field control target air voids shall consist of a maximum equal to the
target plus one percent and a minimum equal to the target minus one percent,
based on the moving average of four tests. The minimum percent voids in
mineral aggregates, (VMA) shall have a lab design of ** and field control value
of ". The dust/ac ratio shall have a maximum (lab design) value of 1.2 and a
maximum (cold feed) value of 1.4.
CITY OF HASTINGS,
ENGINEERING DEPT. C, 0
Project
R-2009 Resurfacing Project
Proj. No. R2009-3 California Ave. — 2nd St. to 9th St.
Description Asphalt Pavement Spec. Sheet
Design By
GWM
Date
3/09
Contractor
Drown By GWM
Approved By
Drn. No. 2
of 5
1,663'
80'
1,230'
105'
II
Rernove
Adley Return >,
& Sidewalk 2
Q
Build 8' PCC
Alley Return
& Sidewalk
Remove
Asphalt
Intersection
Remove
Asphalt
in Intersection.
c
of
_eove in Place
Asphc t
intersection
6"
Ha -
Leave in Place
New Concrete
Curb & Pavement
3" -4" Existing Asphalt / Remove
Remove
Asphalt
Intersection
F'; 11
in Remove
st Asphalt
Intersection
Concrete Subgrade
JP
•
4.4
1, v..%•..ia'..c ::�� �.�.. moi. •i� r..�,.
31'
in
c
to
Remove
Alley Return >,
& Sidewalk
Build 8" PCC
Alley Return
& Sidewalk
qcn
,l IL
r
2" Top Lift
30"
Typical Section of Existing Streets
2nd Street to 9th Street
No Scale
2" Base Lift
Concrete Subgrade
31'
Proposed Section
2nd Street to 9th Street
No Scale
q
Remove
Alley Return >,
& Sidewalk `—'
Build 8" PCC
Alley Return
& Sidewalk
(n
to
Rernove
Asphalt
Intersection
JI
\
Rernove
Ailey Return >,
& Sidewalk
Build 8" PCC
Alley Return
Sr Sidewalk
)fit
2
LJ I 1 �JL�
Iay
Remove —
Alley Return a
& Sidewalk
11
Build 8" PCC
Ailey Return
& Sidewalk
0
r
n
v:
r-
Leave in Place
Concrete
Intersection
Remove
Return &
Sidewalk
in
oo Build 8" PCC
a Return &
a Sidewalk
Leave in Place
New Concrete
Curb & Pavement
JI
Remove
Return &
Sidewalk
Build 8" PCC
Return &
Sidewalk
I1
LIMITS OF RESURFACING PROJECT
CALIFORNIA AVE: 2ND STREET TO 9TH STREET
NORTH
Scale:
loo' o' loo'
Notes:
200' 300'
11
nI
Remove
Return &
Sidewalk
Build 8' PCC
Return &
Sidewalk
Base Lift will consist of 2" Type 170/0.40
Top Lift will consist of 2" Type 170/0.40
Concrete sub—base may require various patching to be determined by Engineer after
milling operation and street has been cleaned.
Millings shall become the property of the contractor.
Ends and returns on Project will be sawed prior to installation of Base Lift.
Some Driveways on this project have asphalt and concrete patched into the gutterline.
Contractor shall use caution not to damage driveways during the removal of this
material.
Contractor shall use care in maneuvering heavy equipment over and around this
Project. Existing paving base and existing curb and gutters may be in poor condition.
Inlays required shall be subsidiary to rotomill pavement.
ZS
ti
D
ITEM
NO. DESCRIPTION
Leove in
Place
Return &
Sidewalk
Pieasor t,
SUMMARY OF QUANTITIES
ESTIMA
011
LLIL
'i r'tova: PS��
intersection
/MaConcrete
i nterseciion
(482 S.Y.)
QUANTITIES UNIT
1 ROTOMILLPAVEMENT
2 ASPHALTIC CONCRETE TYPE 17C/0.40
3 ASPHALTIC CEMENT PERFORMANCE
GRADED BINDER (64-28)
4 EMULSIFIED ASPHALT (SS1H) TACK COAT
5 REMOVE CONCRETE PAVEMENT
6 REMOVE SIDEWALK
7 REMOVE 30" CURB & GUTTER
8 BUILD 6" PCC CONCRETE PAVEMENT
PATCHING (47B HIGH EARLY)
9 BUILD 6" PCC CONCRETE PAVEMENT (47B)
10 BUILD 8" PCC CONCRETE PAVEMENT (47B)
11 BUILD 30" COMB. CURB & GUTTER
12 BUILD 6" INTEGRAL CURB
13 BUILD 5" PCC CONCRETE SIDEWALK (47B)
14 ADJUST MANHOLE TO GRADE
15 ADJUST WATER VALVE TO GRADE
16 ADJUST GAS VALVE TO GRADE
17 ADJUST STORM INLET TO GRADE
18 PATCH ASPHALT DRIVEWAY
19 SAW CUT
20 TRAFFIC CONTROL, BARRICADES, AND
MAINTENANCE THEREOF
10909 S.Y.
2737 TON
159 TON
2728 GAL.
725 S.Y.
1160 S.F.
475 L.F.
350 S.Y.
250 S.Y.
725 S.Y.
600 L.F.
0 L.F.
1160 S.F.
14 EACH
8 EACH
1 EACH
0 EACH
300 S.Y.
900 L.F.
1 L.S.
ACITY OF HASTINGS,
ENGINEERING DEPT.
00
Project
R-2009 Resurfacing Project
Proj. No.
R2009-3 California Ave. — 2nd St. to 9th St.
°G3C°°ti0° Asphalt Pavement Plan Sheet
Design By
GWM
Drown BYGWM
Date
3/09
Approved By
Contractor
Om. No.
3
of 5
6"
1.663'
80'
Remove
Ailey Return
& Sidewalk
I I
T
Build 8" PCC
Alley Return
& Sidewalk
v
Leave in Place
Asphalt
Intersection
3"-4" Existing Asphalt / Remove
0
Remove
Asphalt
Intersection
� I I
3.
Rernove
Asphalt
in-' Intersection
Remove
Asphalt
Intersection
e le a'
1
Concrete Subgrade
31'
vl
a
Leave in Place
New Concrete
Curb & Pavement
r
30"
2" Top Lift
Typical Section of Existing Streets
2nd Street to 9th Street
No Scale
2" Base Lift
Concrete Subgrade
.y� .. iri . ... ..
31'
Proposed Section
2nd Street to 9th Street
No Scale
I
in Remove
Asphalt
Intersection
c
LO
Remove
Alley Return
& Sidewalk
Build 8" PCC
Alley Return
& Sidewalk
Remove
Asphalt
ritersection
CALIFORNIA AVE RESURFACING
2ND STREET TO 7TH STREET
NORTH 4>
Scale:
100'
Notes:
0'
100'
200'
1
1 L.�
Remove
Alley Return ,.,
& Sidewalk °'
300'
Build 8" PCC
Alley Return
& Sidewalk
Base Lift will consist of 2" Type 170/0.40
Top Lift will consist of 2" Type 17C/0.40
Concrete sub—base may require various patching to be determined by Engineer after
milling operation and street has been cleaned.
Millings shall become the property of the contractor.
Ends and returns on Project will be sawed prior to installation of Base Lift.
Some Driveways on this project have asphalt and concrete patched into the gutterline.
Contractor shall use caution not to damage driveways during the removal of this
material.
Contractor shall use care in maneuvering heavy equipment over and around this
Project. Existing paving base and existing curb and gutters may be in poor condition.
Inlays required shall be subsidiary to rotomill pavement.
Rernove Build 8'' P00
Alley Return T Alley Return
& Sidewaik y & Sidewalk
ti
U I l
Rernove
Alley Return `L
& Sidewalk
Build 8" P00
Alley Return
& Sidewalk
SUMMARY OF QUANTITIES
ITEM
NO. DESCRIPTION
ES TIMATED
QUANTITIES UNIT
1 ROTOMIT T PAVEMENT
2 ASPHALTIC CONCRETE TYPE 17C/0.40
3 ASPHALTIC CEMENT PERFORMANCE
GRADED BINDER (64-28)
4 EMULSIFIED ASPHALT (SS1H) TACK COAT
5 REMOVE CONCRETE PAVEMENT
6 REMOVE SIDEWALK
7 REMOVE 30" CURB & GUTTER
8 BUILD 6" PCC CONCRETE PAVEMENT
PATCHING (47B HIGH EARLY)
9 BUILD 6" PCC CONCRETE PAVEMENT (47B)
10 BUILD 8" PCC CONCRETE PAVEMENT (47B)
11 BUILD 30" COMB. CURB & GUTTER
12 BUILD 6" INTEGRAL CURB
13 BUILD 5" PCC CONCRETE SIDEWALK (47B)
14 ADJUST MANHOT F TO GRADE
15 ADJUST WATER VALVE TO GRADE
16 ADJUST GAS VALVE TO GRADE
17 ADJUST STORM INLET TO GRADE
18 PATCH ASPHALT DRIVEWAY
19 SAW CUT
20 TRAFFIC CONTROL, BARRICADES, AND
MAINTENANCE THEREOF
6198 S.Y.
1555 TON
90 TON
1550 GAL.
75 S.Y.
300 S.F.
175 L.F.
100 S.Y.
0 S.Y.
75 S.Y.
300 L.F.
0 L.F.
300 S.F.
9 EACH
7 EACH
1 EACH
0 EACH
200 S.Y.
500 L.F.
1 L.S.
. CITY OF HASTINGS,
ENGINEERING DEPT.
Project
R-2009 Resurfacing Project
Proj. No.
R2009-3 California Ave. — 2nd St. to 9th St.
Description Asphalt Pavement Plan Sheet
Design By
GWM
Dote
3/09
Contractor
Drown BY
YGWM
Approved Sy
Dm. No.
4 of 5
6"
80'
1.230'
105'
Leave in Place
Concrete
Intersection
4)
-c
3"-4" Existing Asphalt / Remove
u
n�
Remove
Return &
Sidewalk
1(
Concrete Subgrade
Remove
Return &
Sidewalk
GO
0
0
a
0.
0
Build 8" P00
Return &
Sidewalk
Leave in Place
New Concrete
Curb & Pavement
ILJ I I
l� 1
0)
0
0
0
a
a
S
Build 8" PCC
Return &
Sidewalk
1
he_3_0"
Typical Section of Existing Streets
2nd Street to 9th Street
No Scale
Concrete Subgrade
Proposed Section
2nd Street to 9th Street
No Scale
4-4
1.0
4)
Remove
Return &
Sidewalk
c
0
N
0
a)
Build 8" PC0
Return &
Sidewalk
0)
CALIFORNIA AVE RESURFACING
7ND STREET TO 9TH STREET
NORTH [:›
Scale:
Leave In Tri
Place
Return & 0
Sidewalk
a
Notes:
Base Lift will consist of 2" Type 17C/0.40
Top Lift will consist of 2" Type 170/0.40
Concrete sub—base may require various patching to be determined by Engineer after
milling operation and street has been cleaned.
Millings shall become the property of the contractor.
Ends and returns on Project will be sawed prior to installation of Base Lift.
Some Driveways on this project have asphalt and concrete patched into the gutterline.
Contractor shall use caution not to damage driveways during the removal of this
material.
Contractor shall use care in maneuvering heavy equipment over and around this
Project. Existing paving base and existing curb and gutters may be in poor condition.
Inlays required shall be subsidiary to rotomill pavement.
Remove Asphalt
Intersection
Build Concrete
Intersection
(482 S.Y.)
SUMMARY OF QUANTITIES
ITEM
NO. DESCRIPTION
ESTIMA
QUAN
al►
ID.
UNIT
1 ROTOMILL PAVEMENT
2 ASPHALTIC CONCRETE TYPE 1700.40
3 ASPHALTIC CEMENT PERFORMANCE
GRADED BINDER (64-28)
4 EMULSIFIED ASPHALT (SS111) TACK COAT
5 REMOVE CONCRETE PAVEMENT
6 REMOVE SIDEWALK
7 REMOVE 30" CURB & GUTTER
8 BUILD 6" PCC CONCRETE PAVEMENT
PATCHING (47B HIGH EARLY)
9 BUILD 6" PCC CONCRETE PAVEMENT (47B)
10 BUILD 8" PCC CONCRETE PAVEMENT (47B)
11 BUILD 30" COMB. CURB & GUTTER
12 BUILD 6" INTEGRAL CURB
13 BUILD 5" PCC CONCRETE SIDEWALK (47B)
14 ADJUST MANHOLE TO GRADE
15 ADJUST WATER VALVE TO GRADE
16 ADJUST GAS VALVE TO GRADE
17 ADJUST STORM INLET TO GRADE
18 PATCH ASPHALT DRIVEWAY
19 SAW CUT
20 TRAFFIC CONTROL, BARRICADES, AND
MAINTENANCE THEREOF
4711
1182
69
1178
650
860
300
250
250
650
300
0
860
5
1
0
0
100
400
1
S.Y.
TON
TON
GAL.
S.Y.
S.F.
L.F.
S.Y.
S.Y.
S.Y.
L.F.
L.F.
S.F.
EACH
EACH
EACH
EACH
S.Y.
L.F.
L.S.
ACITY OF HASTINGS,
ENGINEERING DEPT.
Project
R-2009 Resurfacing Project
Proj. No.
R2009-3 California Ave. — 2nd St. to 9th St.
Description Asphalt Pavement Plan Sheet
Design By
GWM
Date
3/09
Controctor
Drown B'GWM
Approved By
Dm. No.
5 of 5