5th Street - Baltimore to Kerr
N
24 125
to
27
"4
39 i 36 37
3
2 ND ST.
++++++++
++++++++
+++4++++
J1)11117J111
KEY
= concrete paving
= concrete sub -base •
(Mill: 2-3") New asphalt depth 31/2" approx.
Soil sub -base
(Hill: 2-3") Excavate 4" approx. and
restablize grade.
New asphalt depth 6" approx.
8
O
CD
z
i
PROJ. No. 1991-30
DESCRIPTION
5th Street - Baltimore to Kerr
Hostings City Engineering
24 125
to
27
26
39 i 36 37
36
35
75 I 72
.
x
50 PQ. ludo
/00
42 31 30
R-92 Miscellaneous Asphalt Resurfacing 5th Street
Baltimore to Kerr
ITEM ESTIMATED UNIT
NO. DESCRIPTION QUANTITIES
1. Rotomill Pavement 1,689.0 S.Y.
Recycled Asphalt Mix Type "R" Ton
3. Asphaltic Concrete Type 232.9 Ton
4. 7 Asphaltic Concrete Type 151.3 Ton
5. „ Asphaltic Concrete for
Patching Ton
6. Asphaltic Cement (AC -5) Gal.
7. Asphaltic Cement (AC -10) 4,831.4 Gal.
8. Emulsified Asphalt (SSIH)
for Tack Coat Applied 422.2 Gol.
9. Excavate Soil Base C.Y.
10. Restabilize Sub -Grade ' S.Y.
11. Build 6" Pavement (47B) S.Y.
12. Build PR. Concrete Pavement S.Y.
13. Build 30" Curb 8 Gutter 50.0 L.F.
14. Build 4" Sidewalk 24.0 S.F.
15. Build 6" Integral Curb L.F.
16. Remove Concrete Pavement S.Y.
17. Remove Sidewalk 24.0 S.F.
18. Remove 30" Curb 8 Gutter 50.0 L.F.
19. Adjust Manhole to Grade 1.0 Each
20. Adjust Gas Valve to Grade Each
21. Adjust Water Valve to Grade 1.0 Each
22. Adjust Grate Inlets to Grade Each
23. Saw Cut L.F.
24. Shouldering edge of road Per Station
iNOTE: All side streets will be asphalted back to
approximately the end of radius.
A
Q
a
-J
U.3
2
NOTE: It will be the responsibility of, the contractor
to dispose of all pavement removal.
NOTE:
Locations of curb replacement will
be determined in field by Engineer.
NOTE: 21" Type B Mix - Approx.
11" Type C Mix - Approx.
Total length/width of new asphalt
457' x 30.5' (face of curb to face of curb).
Will cover existing gutter with top lift.
PRO1.
Asphalt Resurfacing
PROJ. No. 1991-30
DESCRIPTION
5th Street - Baltimore to Kerr
Hostings City Engineering
05GN 8Y JN
DATE 1-92
CONTRACTOR
DON BY
JN
APPRD BY
ASBUILTS
ORN. NO.
G : of //
0V-2-/ /999/-30