Loading...
HomeMy WebLinkAboutR1991-13End Construction 5 R 6 Si 7 R 8 5 2 9 10 24 23 22 20 19 ;8 17 16 4 5 6 7 • 24 5 23 6 22 7 24 23 22 5 I 6 d 5 9 10 II 12 13 14 20 19 18 9 10 11 12 13 20 ( 9 R, 19 18 j II 17 12 16 13 15 14 toR II 12 13 14 SSSSfSSSS`; _____ SLiSSSSSS fSS SS S 12 II 2 10 3 9 4 8 5 7 6 C.' 3' dee%J 7 r✓d /on d O VACATE ORD. 2739 7//4/80 2 380 37 $. A ST. 54 53 52 51 50 49 ST. 126 125 124 C!) 1230 122 t=9 y 12' R -ii Nisceiianeous Asonait Resurfacing Project 1991-13 '8' Street (Burlington to Woodland) ITEN NO. DESCRIPTION ESTIMATED UNIT QUANTITIES I. Rotomill Pavement Optional irrlfrl- S.Y. 2. Recycled Asphalt Nix Type 'R' Ton 3. Asphaltic Concrete Type 'B' 3,078 Ton 4. Asphaltic Concrete Type 'C' 2,706 Ton 5. Asphaltic Concrete for Patching Ton 6. Asphaltic Cement (AC -5) Gal. 7. Asphaltic Cement (AC -10) 57,843 Gal. 8. Emulsified Asphalt (55111) for Tack Coat Applied 9. Excavate Soil Base 10. ' Restabilize Sub -Grade II. Build 6' Pavement (478) 12. Build PR. Concrete Pavement 13. Build 30' Curb a Gutter 14. Build 4' Sidewalk 15. Build 6' Integral Curb 16. Remove Pavement 11. Remove Sidewalk IS. Remove 30' Curb a Gutter 19. Adjust Nanhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Yater Valve to 'Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 1101144 1,615 Gal. 876 C.Y. 10,506 S.Y. S.Y. S.Y. 40 L.F. S.F. L.F. 16,151. S.Y. S.F. 40 L.F. 14 Each Each 2 Each Each t.F. Soil Sub -base (Mill: 2"-3") Excavate Base 3" Approx. New Asphalt Full Depth: 6" Approx. C ST. NOTE: All side streets will be asphalted back to approximately the end of radius. 12 II 2 10 3 9 4 8 5 r732 hi GO 'eye a r 132 131 130 2 ' Y D ST. i W W 'a 11274 LJ W J 0. a I QUEE 19 00. / r 18 17 16 15 14 13 12 II 10 1 2 3 4 5 16 6 7 8 9 N CC 8r Toe E ST. 22 21 20 19 18 17 16 15 14 13 2 3 4 6 7 9 10 14 9 13 10 24 228 20 CI 190 lea JE I 6Z —Th.,. I 4-17 4, ..., ie , r 4 46 47 1127 412 419 10 co NOTE: Concrete drainage FI's at intersections will be located in field by Engineer. NOTE: It will be the responsibility of the contractor to dispose of all pavement removal. PROJ. Asphalt Reeurfacing PROJ. NO. 1991-13 DESCRIPTION "B" St. (Burlington to Woodland) Hastings City Engineering . DSGN BY JN DATE 3-91 CONTRACTOR JN 5 Of ZAD