Loading...
HomeMy WebLinkAboutR1991-29IOUNLA• SUB 1 MU S A00 : I MOWEi 8 - L , . » . ., 2 /2'.} W L ,27 a /z, uction Y•7 I I♦0.0 ,21s iso n.1 'FrI,S . S7 ' • • 33 �.11a r i0 1 40 62 ' ; I I(0"-IJ0 I '5132 31 310-2-97-28-;-27---26.725r,-24 p 28q 74164 � 23 22 121 20 19 ; 18 17 et 371 38' l,4 al Q `ill - .50 .$i I•• .Sal L1.5 iQp MA .. 1 T I FRA TONS do 444 % t4 /2780 /24 COUNTRY O 13 12 II 9 1 8 7 6' v ' - i - 7O 737 ' 19 (f it - 11' I 1 1 1 1) 1 :46 4P 1 b8 049; 501 511 I 52 '1 53 540 )701 2461 17 b' 2651 36' I 6a6 4A3•y. 6' IZl d 3T' II i1 3•l i 9'1 6.6 16' $I 881 8/I 5 1841 83 I 82 as 8! (��_ 40' 19.162' i ryl I I I CL -j• SIDE Begin Construetio - 33 34 35 36 37 38 39 40141 42 43 44 TH ST. RINGLAND AVE 02 101 100 99 98197 96i95(94 93192 91,190 //3 //2 G5 0. P 80a 79 ..78 o-77 0 W -J -J 0 0 '103 Go 62 5 4 �- 2 2 21 HARTTWELL, I /00 GO n 104 105 1 1061 107 108 109 110 Iii 112 GO 5 /00 p 4 /00 l I1 roo I 2 /QO n I /00 j2 - R 5 R 2 1 R 40 /00 /00 /00 GO /20 /22.6 /00 /00 I /00 1 /00 I /00 $ 5 4 3 2 4 O 6 /00 7 8 9 /00 /00 /02 10 /00 0 1461.1{ 5 4 3 2 1 GO /00 1 /00 /00 9 TH ST. 80 /70 4 3 2 6 7 8 9 10 5 6 7 /00 (00 /00 /00 /00 * /00 /02 I /00 9 /00 /00 /00 /00 /00 • /00 /00 /00 • • N00 UNIVERSITY ST. 1 5 4 3 2 4 3 2 GO /70 u 7 I _ 00 37 I ( 17 I Jo II ''jj��jj- Op 4 13 , 2 1 I 6+ 5 14 13 2 4 I RjI�NGLA}}(�Ijj SUB PALMERS J CD 014 It6 C o •4ns x 52 332 I3I2I1 Rl� TS SUB , ( 9181716I514J3I21 SUB a THOMPSONS C4) NOTE: Locations of curb replacement will be determined in field by Engineer. NOTE: Excavation will be hauled to City stockpile as determined by Engineer. 1 60 Li W 12 ( ilol 10 1 9 1 8 !7I6J5I4I3I2I1 i. ADD W Z I- ---ST. '2 NOTE: All side streets will be asphalted back to approximately the end of radius. NOTE: It will be the responsibility of the contractor to dispose of all pavement removal. R-92 Miscellaneous Asphalt Resurfacing Pine Avenue Lakeside to 12th ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1. Rotomill Pavement 2. Recycled Asphalt Mix Type "R- 3. Asphaltic Concrete Type "B" 4. Asphaltic Concrete Type "C" 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 8. Emulsified Asphalt (SSIH) for Tack Coat Applied 9. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (47B) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 18. Remove 30" Curb & Gutter 19. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut, 24. Shouldering edge of road NOTE: 4" Type B Mix - Approx. 2" Type C'Mix - Approx. 1,196.0 222.0 151.5 4,714.5 S.Y. Ton Ton Ton Ton Gal. Gal. 170.0 Gal. 99.0 C.Y. 901.0 S.Y. S.Y. S.Y. L.F. S.F. L.F. S.Y. S.F. L.F. 1.0 Each Each Each Each L.F. Per Station ++++++ ++++++++ ,fl1ll111111 KEY = concrete paving = concrete sub -base (Mill: 2-3") New asphalt depth 34" approx. = Soil sub -base (Mill: 2-3") Excavate 4" approx, and restablize grade. New asphalt depth 6" approx. I3 CITY )410E9 1940 Total length/width of new asphalt 437' x 21' Will not cover existing gutter with top lift. PROD. Asphalt Resurfacing PROD. NO. 1991-29 DESCRIPTION Pine - Lakeside to 12th Street' Hastings City Engineering MON BY JN DATE 1-92 CONTRACTOR DM BY JN APPRD BY ASBUILTS DRN. NO. S of // • Zy_z / /9/-29