Loading...
HomeMy WebLinkAboutR1991-32S0 , 50 : 50 50 I .50 600 '..30 50 ; 80 1 I £7 . 50 . 50 .50 50 50 60!60t60 80 50 50 50 .50 .50 50 so 50 50150 .50 .50 50 30 50 50 12 1t 10 9 8' 7 6 5 4 3 2 C O Q 5TH ST. Begin Construction. 111111€1111 11111111111111 11111111 NNW e !Mr r 2 13 14 15 16 17 118 19 20 21 22 23 24 £7 50 .550 . 50 50!.50.60 50 50 50 .50 50 End Construction 8 135.25 • M525 V 8 056N BYDA JN 1 7 g 2 4n 6 MN NO. 8 Of X/ 3 N 6 4 4 k452 /.3525 12 2- c 4.TH ST. 12 ea4 13 12 5 7 8 - 9 10 II 12 R. RD ST. T_ 0 0 a Q 2ND ST SO 50 2 10- I h' II 10o 96.4•el7'6115-64?3142 1'a I M.5 So so i5O1so so I So 1.sol sol Sof -!so PARK,„, ,„:, ST. 610 •! 6: 7 X 6 5 ,4 3 ZS Y..*f £11o/so „12 a. a R R EAST PARK ST. cn 12 ' II 10 9 : 8 2 _t 13 14 15 16 17 (0 19 20 21 22 23 24 G0 50 i 50 : 50 . 50 .50:50 50 50 50 w 'SOUTH ST. SI 04 GOLFS 1 COLE CEDAR AVE 1ST ++++++++ KEY = concrete paving = concrete sub -base (Mill: 2-3") New asphalt depth 31/2" approx. = Soil sub -base (Mill: 2-3") Excavate 4" approx. and restablize grade. New asphalt depth 6" approx. ( ADD W J W CRY WILY. NOTE: Locations of curb replacement will be determined in field by Engineer. NOTE: Excavation will be hauled to City stockpile as determined by Engineer. R-92 Miscellaneous Asphalt Resurfacing 4th Street California to Cedar ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1. Rotomill Pavement 2. Recycled Asphalt Mix Type 'R" 3. Asphaltic Concrete Type "8" 4. Asphaltic Concrete Type "C- 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 8. Emulsified Asphalt (SSIH) for Tack Coat Applied 9. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (47B) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 18. Remove 30" Curb & Gutter 19. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road NOTE: It will be the responsibility of the contractor to dispose of all pavement removal. NOTE: 4" Type B Mix - Approx. 2" Type C Mix - Approx. 1,452.0 358.0 201.2 6,953.0 S.Y. Ton Ton Ton Ton Gal. Gal. 217.8 Gal. 159.7 C.Y. 1,452.0 S.Y. S.Y. S.Y. 22.0 L.F. S.F. L.F. S.Y. S.F. 22.0 L.F. Each 1.0 Each Each Each L.F. Per Station Total length/width of new asphalt 594' x 24' (Edge of 30" gutter to face of curb). Will cover north existing gutter with top lift. PROJ. Asphalt Resurfacing PROJ. NO. 1991-32 OESCRIPTION ' 4th Street - California to Cedar Hastings City Engineering 056N BYDA JN TE 1-92. CONTRACTOR RAPTOR BY JN APPRO BY ASBUILTS MN NO. 8 Of X/ Z'/- 2_ r/99192-