Loading...
HomeMy WebLinkAboutR1991-33End Construction NOTE: Check for possible survey marker prior to work. H21 W S W A O ts 7 8 C430134 9 ; 10 3F 34 11 , 12 ea 134 LL W 819 10 11ec 1.14le.) 54 1 34 134 134 1 . 108. :3P 34 7 6 5 j 4 . 3 2 1 12 113 14 44 34 :4594 a BALTIMORE AVE. 10 9 3 BOYCE ST. 4 2 8 TH ST 8 9 10 11 j1213 14 mzreiU3ammo V=i'E 74 12 4° 111 II 0 2 l0 -405 BATEMAN ST. 9 CC 00 8 'Al OD 41 7 3 Begin Construction 8 9 10 11 : 12 13 14 ye o7r 8 9 IO�j •,1k\9 1 `t .f3 33 36 : 37 3,6.445 40 ! e2 1 1 1 2 1 se 1-3& j. ao 1 i 1 a lac `J0 �0 6 5 �Ag 3 2 i e 5 4 3 2(d 1 �, -t5 -p 16 9' ri7 , 8 9 104x11 12�y7 c.yk" 9 10 II 12 1 I 32 y �3 s.s/C � 36 So_ 30 CG � -�`�S'39- V I .646 T S0 i& 3o .50 .50 . 30 .50 GC x7626 36 133 155 54 :5440 .5o 35-377 6 5 4 3t I 6 t5 0 -t T. ne 11 41 HST 6TH ST. 6 9 10 11' 121 .7 144),,\ f09 l0 11 30 30 :.'O 50 .50 . X 300.165 5/ ,a r 37 5 4 3 st Q 3 J0 5 5,6.09 2 SCI• m 5TH ST. u 6 5 4 34,2 10, HAMSHIRE '7 2 ADD ZIn.07 at 3 5 6 -sz v 4 3 52GG� ,2B 12 . 6 co le 8 9 10 5/ y 5/ :.52 71c3' 9 10. 11 X12 8 50 1 50 aC 29:07 7 I(� 43SI 56 11? 3463a 30 1.50 Ii.I 5021 L� ,- 7 I-&'31=s.V,S,..521 2!6.166 ++++++a+ + +++++++ .5▪ .5.5.5++aa KEY = concrete paving = concrete sub -base (Mill: 2-3") New asphalt depth 34" approx. = Soil sub -base (Mill: 2-3") Excavate 4" approx. and restablize grade. New asphalt depth 6" approx. 94TH ST. R-92 Miscellaneous Asphalt Resurfacing Oswego Avenue 5th to 8th ITEM NO. DESCRIPTION ESTIMATED UNIT QUANTITIES 1. Rotomill Pavement 2. Recycled Asphalt Mix Type "R" 3. Asphaltic Concrete Type "8" 4. Asphaltic Concrete Type "C- 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 8. Emulsified Asphalt (SSIH) for Tack Coat Applied 9. ExcavateSoil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (478) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 18. Remove 30" Curb & Gutter 19. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road NOTE: Locations of curb replacement will be determined in field by Engineer. NOTE: Excavation will be hauled to City stockpile as determined by Engineer. NOTE: All side streets will be asphalted back to approximately the end of radius. NOTE: It will be the responsibility of the contractor to dispose of all pavement removal. NOTE: 4" Type B Mix - Approx. 2" Type C Mix - Approx. 3,151.3 S.Y. Ton 724.2. Ton 460.7 Ton Ton Gal. 14,879.0 Gal. 533.5 Gal. 323.2 C.Y. 2,937.6 S.V. S.Y. S.Y. 35.0 L.F. S.F. L.F. S.Y. S.F. 35.0 L.F. 2.0 Each Each 1.0 Each 1.0 Each L.F. Per Station NOTE: Storm. Sewer pipe runs entire length of project. Location is towards east half of street, as indicated by old plans. Total length/width of new asphalt 1,067' x 30' (face of curb to face of curb). Will cover existing gutter with top lift. PROJ. Asphalt Resurfacing PROJ. NO. 1991-33 DESCRIPTION Oswego - 5th Street to 8th Street Hastings City Engineering DSGN BYJN DATE 1-92 CONTRACTOR DRN. BY JN IAPPRO 8Y IASBUILTS ORN NO. 9 of// 2X -z - /%J/ -3y