Loading...
HomeMy WebLinkAboutR1992-1Aare ai ! +. e 3 r 8 54 // /0 B JS k Oo C k e0' ELLS RESTS SMRLI3 anti- a6 5 4 3 2 y 7 9 av 8 A /0 /I 2 er' 14 r TS' 45' 90' 7 9 av 8 9 /0 /I 12. a So 2 er' 14 ' ' TS' 45' 90' t 21 222324 4 17 JDM9pJ°1U t /2///898 5 4 3 /B rn /A 13 14 15 16 - 00' 1 0 21 222324 4 17 18 ,- 4 5 4 3 2 9 j5.. 9 25 . . 1 1 I III 'I'II'I'II CIbfl /0 CI t po Q /N70.51/ SUB. 4 1 3 2 / w Il 11 54' - " // - 00' 6 5 4 3 2 ,- 4 5 4 3 2 9 j5.. _ Jr . . 1 7 VJ 8 9 /0 // /2. 9 p VAC. ORO 3059 4/88 30)' 50' 6 5 3 2 5D 9 $5 /2 1/ AJ 9 8 7 4 3 2 2? 8 10 // III $5 /2 1/ AJ 9 8 7 4 3 2 2? zY 1211 10 9 8 -14 1617 f 5 4 to n 3 2 1 13 14 15 16 17 18 19 2L 21 222324 4 5 4 3 2 9 j5.. _ . . b' zY 1211 10 9 8 -14 1617 7 6 5 4 to n 3 2 1 q 13 p tf 14 15 18 19 2021 222324 t . I" 1111l'i'I'LI'FM. End Constructio ADD. /0 Are s' ?':,' R 7111 Street se' An DESCRIPTION Minnesota Avenue (2nd to 7th) se q OSCN BY JN DATE 2-92 CONTRACTOR � 6 5 4 3 2 / n 5D' 2 a 5" /2/8/75 r ' %. N. adf 50 ease 2 / I poi wits 25 2 11 10 9 817 615 4 3 2 r5 Ia 13 14 15 2' e5' u 12 113 2% 16 17118 9 +++ 1222324+++ +++ II 14 10 15 9 16 8 17118 19 5 27 4 3 22 2 50' $001 5 5 I 2 6 7 8 9 0 VA 45[0 ^ OND Sii 5 4 3 2 I O 6 7 8 9 V CIt'D ^ MD. S55 54321 23.24 6 26 10 45' o a 775 Sr _rI' I' I' I' I' I' 11L1 121 / Int' nit Begin Construction NOTE: 211" Type B Mix - Approx. 111" Type C Mix - Approx. NOTE: Locations of curb replacement will be determined in field by Engineer. NOTE: All side streets will be asphalted back to approximately the end of radius. NOTE: It will be the responsibility of the contractor - to dispose of all pavement removal. 5 k 61h• Street / .k 5th. Street 4 1h. S/reel 3rt• ,511 ADDLEMANS 5 4 51/8. //2 t t gad Street KEY Tr!>.�',�$ f � concrete paving . ! P 9 111111111111 concrete sub -base (Mill: 2-3") New asphalt depth 3'," approx. Soil sub -base (Mill: 2-3") Excavate 4" approx. and _. ,.. restablize grade. New asphalt depth 6" approx. R-92 Miscellaneous Asphalt Resurfacing Alternate "A" Minnesota A 2nd to 7th ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1. Rotomill Pavement 2. Recycled Asphalt Mix Type "R" 3. Asphaltic Concrete Type "B" 4. Asphaltic Concrete Type "C" 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 8. Emulsified Asphalt (SSIR) for Tack Coat Applied 9. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (47B) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 18. Remove 30" Curb & Gutter 19. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road NOTE: Locations of all manholes and valves will be tied off and recorded prior to any work. Manholes will be kept covered and kept clean throughout all of resurfacing project. NOTE: All specifications will apply the same as set in the main contract. 5,420.6 699.3 526.5 15,594.0 S.Y. Ton Ton Ton Ton Gal. Gal. 1,355.0 Gal. C.Y. S.Y. S.Y. S.Y. 158.0 L.F. 80.0 S.F. L.F. S.Y. 75.0 S.F. 158.0 L.F. 6.0 Each 2.0 Each Each Each L.F. Per Station Total length/width of new asphalt: 1,543' x 30' (face of curb to face of curb). Will cover existing gutter with top lift. PROJ. Asphalt Resurfacing An DESCRIPTION Minnesota Avenue (2nd to 7th) 5D' 2 a 5" /2/8/75 r ' %. N. adf 50 ease 2 / I poi wits 25 2 11 10 9 817 615 4 3 2 r5 Ia 13 14 15 2' e5' u 12 113 2% 16 17118 9 +++ 1222324+++ +++ II 14 10 15 9 16 8 17118 19 5 27 4 3 22 2 50' $001 5 5 I 2 6 7 8 9 0 VA 45[0 ^ OND Sii 5 4 3 2 I O 6 7 8 9 V CIt'D ^ MD. S55 54321 23.24 6 26 10 45' o a 775 Sr _rI' I' I' I' I' I' 11L1 121 / Int' nit Begin Construction NOTE: 211" Type B Mix - Approx. 111" Type C Mix - Approx. NOTE: Locations of curb replacement will be determined in field by Engineer. NOTE: All side streets will be asphalted back to approximately the end of radius. NOTE: It will be the responsibility of the contractor - to dispose of all pavement removal. 5 k 61h• Street / .k 5th. Street 4 1h. S/reel 3rt• ,511 ADDLEMANS 5 4 51/8. //2 t t gad Street KEY Tr!>.�',�$ f � concrete paving . ! P 9 111111111111 concrete sub -base (Mill: 2-3") New asphalt depth 3'," approx. Soil sub -base (Mill: 2-3") Excavate 4" approx. and _. ,.. restablize grade. New asphalt depth 6" approx. R-92 Miscellaneous Asphalt Resurfacing Alternate "A" Minnesota A 2nd to 7th ITEM NO. DESCRIPTION ESTIMATED QUANTITIES UNIT 1. Rotomill Pavement 2. Recycled Asphalt Mix Type "R" 3. Asphaltic Concrete Type "B" 4. Asphaltic Concrete Type "C" 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 8. Emulsified Asphalt (SSIR) for Tack Coat Applied 9. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (47B) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 18. Remove 30" Curb & Gutter 19. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road NOTE: Locations of all manholes and valves will be tied off and recorded prior to any work. Manholes will be kept covered and kept clean throughout all of resurfacing project. NOTE: All specifications will apply the same as set in the main contract. 5,420.6 699.3 526.5 15,594.0 S.Y. Ton Ton Ton Ton Gal. Gal. 1,355.0 Gal. C.Y. S.Y. S.Y. S.Y. 158.0 L.F. 80.0 S.F. L.F. S.Y. 75.0 S.F. 158.0 L.F. 6.0 Each 2.0 Each Each Each L.F. Per Station Total length/width of new asphalt: 1,543' x 30' (face of curb to face of curb). Will cover existing gutter with top lift. PROJ. Asphalt Resurfacing PROJ. NO. Alternate AO/) DESCRIPTION Minnesota Avenue (2nd to 7th) Hastings City Engineering OSCN BY JN DATE 2-92 CONTRACTOR DRN. BY JN APPRD BY ASBUILTS ORN NO. / of / Z� z-/ 4/4 Ate)