Loading...
HomeMy WebLinkAboutR1993-11/00 10 9 8 1 7 6 t Jr)I 2 3 /ts 15 14 2 3 4 5 ern I—� 13 I 12 11 2 3 4 2 5 6 7 8 9 a too 10 9 3 ° 6TH ST. 65 8 7 6 w 9 8 7 6 2 1 Q3 Cr 4 5 14 13 12 3 4__ 5 6 7 8 9 10 2 3 POST. Pi 5 r SiR" R 2ND ST. I 0 i2 Q O 2 IST ST. �UCHANAN Z3028 C a 18 Q 16 2 92 fin IS m C 13 cif O SOUTH ST. 6 I ( 49 100 LEXINGTON D BURLINGTON Note: 2" Type R/B mix - Approx (Base lift) 11/2" Type C mix - Approx (Top lift) 12 P 18 CITY Ira A 1940 R-93 Miscellaneous Asphalt Resurfacing Bellevue (4th Street - 5th Street) ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES 1. Rotomill Pavement 1,010 S.Y. 2. Recycled Asphalt Mix Type "R" Ton 3. Asphaltic Concrete Type "R/8" 111 Ton 4. Asphaltic Concrete Type "C" 91 Ton 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 666 7. Asphaltic Cement (AC -10) 1,365 8. Emulsified Asphalt (SSIH) for Tack Coat Applied 253 Gal. C.Y. S.Y. S.Y. S.Y. 21 L.F. S.F. L.F. S.Y. S.F. 21 L.F. Ton Gal. Gal. 9. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (47B) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 18. Remove 30" Curb & Gutter 19. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road KEY ti = concrete paving 1+1+1+++ 1++++++1 ++++++++ concrete sub -base (Mill: 2-3") New asphalt depth 31/2" approx. Asphalt base "overlay Only" New asphalt depth 3 1/2" approx. Total Length/Width of new asphalt 303 X 30 (face of curb to face of curb) will cover existing gutter with 1" to 1-1/2" of asphalt when top lift is applied. Extra care will be taken to maintain water flow. Each Each Each Each L.F. Per Station NOTE: This street is scheduled for HUD Sidewalk Project this year. Handicap ramps will be installed by others. Asphalt Contractor will pave street after sidewalk work is finished. This area will have priority for the sidewalk contractor to finish ahead of asphalt contractor. PROD. Miscellaneous Asphalt Resurfacing PROJ. NO. 1993-11 OESCRIPTION Bellevue - 4th to 5th Street Hosfings City Engineering OWN BY J.N. DATE 1-93 CONTRACTOR ORN BY APPRD BY ASBUII75 DRN. NO. of %y