Loading...
HomeMy WebLinkAboutLakeview6thStormC) O 0 BP: 500+00.00 --,,cc) • 1;6.29 FL C) O +o EX- 1 - 16.4421 - cri • , U. 11031 -FL M. LO BP: 0+00.00 17 NOTE: CONTRACTOR SHALL VERIFY SLOPE AND LOCATION OF EXISTING 48"0 RCP (EXP -1). SEE TABLE FOR RCP PIPE P-1 SIZE REQUIREMENTS. O LO0 17.93 TC 18.67 TC 16.89 FL 17.43 FL 18.17 FL Q STR-1 O 0 c BP: 600+00.00 LO - A - -� LAKEVIEW VE. - - -�_- -�-- --+--� Oo 0 0 + O+ N Cr) P I : 503+30.57 e)21.28 FL 17.43 FL 18.17 FL 19.06 FL 19.95 FL 20.69 FL 21.28 FL 21.71 FL 22.06 FL n 17.39 TC 17.93 TC 18.67 TC 19.56 TC 20.45 TC 20.19 TC 21.78 TC 22.21 TC 22.56 TC EXISTING PAVING STR-2 EDGE �n STORM SEWER PLAN - LAKEVIEW AVE. 1W� SCALE: 1" = 20' NORTH LAKEVIEW AVE. - PIPE PROFILE L q 1922 0 M O / O) O L.0 N N W N - IV 22.97 ro 22.47 FL bo 503+00 1922 1920 N . : : : : : - M N F- 12 JB� .68 FL w .18 W PI: 503+48.16 I I I 1924 1924 1922 r1 - O / O) O . M 00 N I� _. -: -: rn 1922 1920 . : : EXISTING CENTERLINE: . : : : : : : GRADE (TYP) : . : : : : : - / : N U �. : :- -^ : : : . : : : STR-1 rn rn 1920 rn rn rn 1918 rn rn / . PROJECTED BACK OF CURB ELEVATION, (TYP) . � rU Lu Lu z a o 3 n - - - - - O N ° w0 zZ Y 1918 ' ^ O ? O fl C) x wV 1916 2 Y o - - - - t Q N E O W 3 1916 ui U U N 1914 N t _ _. - -.-. -- -.- -:- 2- ~x� P-1 : : : : 264'of. rete Pipe ---.- -.--- . . . . . . . 1914 1912 EXP -1 . . of - - _ - - - @1.85% - - .- - . --- _ 1912 1910 EX -1 STA:0+40.62 . RIM:1916.64 4 .O Concrete Pie pj A .50%: _ - . - - - - - - - - - - 1910 1908 . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . 1908 NOTE: CONTRACTOR SHALL VERIFY SLOPE AND LOCATION OF EXISTING 48"0 RCP (EXP -1). SEE TABLE FOR RCP PIPE P-1 SIZE REQUIREMENTS.. 1906 1906 499+75 500+00 500+25 500+50 500+75 501+00 501+25 501+50 501+75 502+00 502+25 502+50 502+75 503+00 Structure Rim & Sump Elevations Pipe Bearing Elevation @ Station ao 0 CR14: N Lo N O O 500+00 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 501+00 502+00 STORM SEWER PROFILE @ CENTERLINE SCALE: 1" = 20' r i N 00 cn X M N r1 - O / O) O 00 M 00 N I� Ln N W rn O � 4 N N N U 0tiM s�� A00+00 N rn rn 701 rn rn rn rn rn rn 500+00 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 501+00 502+00 STORM SEWER PROFILE @ CENTERLINE SCALE: 1" = 20' r i N 00 cn X M PC: 600+71.47 STR-3 I P 3+69.83 I: 100+00.00 I Stru cture Rim & Sump Elevations Pipe Bearing Elevation @ Stati o n N r1 - N W / n N O 00 � 00 0 (o a o s Ln N W rn CD W � 4 N W Elevations U 0tiM s�� A00+00 N N ? m T 3 E N p PC: 600+71.47 STR-3 I P 3+69.83 I: 100+00.00 I Stru cture Rim & Sump Elevations Pipe Bearing Elevation @ Stati o n 600+00 STORM SEWER PROFILE � CENTERLINE SCALE: 1" = 20' LAKEVIEW AVE. - PIPE PROFILE rn r1 - M � LO O 00 � 00 L6 (o a o s Ln rn rn rn 600+00 STORM SEWER PROFILE � CENTERLINE SCALE: 1" = 20' LAKEVIEW AVE. - PIPE PROFILE Pipe Bearing Elevation @ Station M F 2 M � Structure W 00 � 00 rn Rim & Sump a o s Ln L6 L6 rn � N N W Elevations U s�� Pipe Bearing Elevation @ Station M F 2 M � N W LO �L O N 1 L6 a o s Ln =Q� a rn � °w0 _ W 503+00 Y O O 0�CID H LU U LU O LU w� cn Q �m 0zLL1 '• z Q = 2 H c� W i LU Y Q J /^ F 2 FO U N W x �L O N 1 Z a U) a o s =Q� a Q�o W 3 °w0 _ W U s�� N N ? m T 3 E N p rU Lu Lu z a o 3 n (6 O N ° w0 zZ Y ' ^ O ? O fl C) x wV 2 Y o F y a o U T t Q N E O W 3 EES ui U U N N N N N t � 2- ~x� 00 C/) z J N (n O) 0 Z Z LU O Y CQ �LU 2 LU cc U IY W Design is not contracted to provide a - Coordinating Professional on the 2 Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. DATE. JANUARY, 2019 if not one inch on this sheet, adjust scales accordingly 1 , F0- Nom\ T i SEP: 3+69.83 \ PI: 100+00.00 �---APL 503+48.16 .�' , , , i , , hO C:)_ CD P-4 0 O- 0 0 EP: 201+25.28 11 2p11 3 \ 01kpp� \ 2 \ \ \ 0 STORM SCALE: 1" = 20' I SEWER PLAN - LAKEVIEW AVE. - PIPE PROFILE LAKEVI EW AVE. PI: 508+12.62 0 O ao O LID FL 25.$2 FL 25. FL I O 200+00 P-6 FL / 25.5k FL BP: 200+00.00J 24.70 FL 26.20 TC 104+49.36 EP: 700+45.94 BP: 700+00.00 +00 26.61 TC X6.11 FL 0 0 LO0 r 700+46 1930 N M14 -M 0 0 0 a + 24.60 TC 24.88 TC 25.17 TC 25.45 TC 25.74 TC 0 24.10 FL 24.38 FL 24.67 FL 24.95 FL 252FIL 0 I-� (O � O w 3 ? ° Wt �.N o 0 0 0 0 0 0 0 —� — — — — — — — ------------ — — - — 1- T 3 E N p 0 0 N U" N Op (6 N CD CD 0 STORM SCALE: 1" = 20' I SEWER PLAN - LAKEVIEW AVE. - PIPE PROFILE LAKEVI EW AVE. PI: 508+12.62 0 O ao O LID FL 25.$2 FL 25. FL I O 200+00 P-6 FL / 25.5k FL BP: 200+00.00J 24.70 FL 26.20 TC 104+49.36 EP: 700+45.94 BP: 700+00.00 +00 26.61 TC X6.11 FL 0 0 LO0 r 700+46 1930 N M14 -M 0 1930 000 M� X00 �� 1 N Lo CO 0 4 I-� (O � w 3 ? ° Wt �.N o W 0 0 0 0 0 0 0 0 co14- M N 1- T 3 E N p 1928 M N U" N Op (6 I� M Lu Z ° 3 n .� I1,- O M Y CDo Op C^/ co O 1928 U a 0 0 O 0 N U) F � U) a � ° N N O W r` 06 06 3 O N 06 0 0 0 1926 O . : : : : : : : PROJECTED BACK OF : . : : : : : . : : : . : : : . : : : : : . : : : : : : : . : : : —. --: —: — T N 1926 ...... EXIST. CENTERLINE : . : NEW STREET EL. ........CURBELEVATION TYP. ..... (. ... .... .. ... ...... .. ..... . . . . . ......... . . . _ : —. . . . . . . . ......... ....... . . . . . . . . . : rn rn ... .. ... . : . 0 1 GRADE (TYP) : AT PIPE C.L. CROSSING : : : : : T . : : : : : . : . : : : : . : : : : : : 1924 STR-4 1924 —tel — --- --- -. 1922 ......... ........ .... ...... JB -1 . ........ ....... ...... ......... ........ .... .... — — — — — — —.-77� - - —.— — — —.- - -: ....... ...... .: 1922 . . —.— — —:— -:- - P-4 : : : : : : . . . . . . . . . . —:- — —.— — —:- -:- -:f . . . . . . . — — — — —. 1920 STR-2 : : : : JB -4 : . : : : : : : : . : : : . : : : : . — - - . —.— —. - . : : : : : : :31:4':o. 30 oncrete Pipe . . : : : : : . : : : : — — — — — — — — — 1920 . . . . . T —. — —: -:-. . : : 1.05°1Q�:--: ---.--- — — —. --.—. .- —...... . . . . P-3 ......... ......... ...... ........ ......... ....... — — T __ — — ----. . . : : : : : 1918 - _ -- 145':0 --- ----. _ _ 1918 P -3A : 30" O . oner . . : : : : : : — — — — — ........ ..... ......... ......... ... 1:1 _ate — �.—. °� --: -- -- ...... . ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 1916 . . . . . . . —.— — — — — — — 1916 — — ....... 15' of ......... ......... ......... ...... ....... ......... ......... ......... ......... ......... ......... ......... ......... ... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... It 30"O:Con rete Pipe 1914 o P 1914 503+00 503+25 503+50 503+75 504+00 504+25 504+50 504+75 505+00 505+25 505+50 505+75 506+00 506+25 506+50 506+75 507+00 507+25 507+50 507+75 508+00 508+25 Structure Rim & Sump Elevations Pipe Bearing Elevation @ Station 00 N M14 -M 0 o F U 000 M� X00 �� 1 N Lo CO 0 4 I-� (O � w 3 ? ° Wt �.N o W 0 0 0 0 0 0 0 0 co14- 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 504+00 505+00 STORM SEWER PROFILE ( SCALE: 1" = 20' 506+00 CENTERLINE 507+00 508+00 W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly Y O O 0�CID H LU U LU O LU w� cn Q �m 0LL1z '• z Q = 2 H c� W i LU Y Q J /^ F2 vJ o F U N W x °s o m 1 Z ¢ U) a o s a w 3 ? ° Wt �.N o W U s�� co14- M N 1- T 3 E N p M N U" N Op (6 I� M Lu Z ° 3 n .� I1,- O M Y CDo Op C^/ co O 00 U a 0 0 O 0 N U) F � U) a � ° N N O W r` 06 06 3 O N 06 0 0 0 O Q� Oj N N rn rn rn rn rn rn rn rn rn rn rn rn rn rn 0 0 1 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 504+00 505+00 STORM SEWER PROFILE ( SCALE: 1" = 20' 506+00 CENTERLINE 507+00 508+00 W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly Y O O 0�CID H LU U LU O LU w� cn Q �m 0LL1z '• z Q = 2 H c� W i LU Y Q J /^ F2 vJ o F U N W x °s o m 1 Z ¢ U) a o s a w 3 ? ° Wt �.N o W U s�� N N T 3 E N p M N (6 Lu Z ° 3 n .� Z O o z Y CDo UEa°° C^/ O ? O H O w x w x � o V`o U a 0 0 U) F � U) a � ° N N O W E a W 3 O N m N N O a a O Q� ao C/) z J� N (n 0 z z LU O �LU 2 W cc U ry C-3 DATE: JANUARY, 2019 TRANSVERSE PIPE #2 PROFILE Pipe Bearing Elevation @ Stati o n r` r` 00 1932 N �� ISN Stru cture �01 N rn I,- � LO Rim &Sump N N N N N N co N rnrn rnrn rnrn 1930 NN 0 NN °' Elevations T 3 E N p C/^) U °2 °2 °2 °2 . . . . . : —: O OOi Pipe Bearing Elevation @ Stati o n 700+00 HORIZONTAL SCALE STORM SEWER PLAN - LAKEVIEW AVE. SCALE: 1" = 20' LAKEVIEW AVE. - PIPE PROFILE 1932 r` r` 00 1932 N �� ISN N �01 N rn I,- 700+00 HORIZONTAL SCALE STORM SEWER PLAN - LAKEVIEW AVE. SCALE: 1" = 20' LAKEVIEW AVE. - PIPE PROFILE 1932 � O) r` 00 1932 rn �� ISN �(O �01 N (0 I,- N O) O O) N N N N N N co N rnrn rnrn rnrn 1930 00 0 co °' N ? m T 3 E N p C/^) U M N ^/ . . . . . : —: O OOi _ (6 O O 1930 ` 0 Lu W Z o-0 T O N Q Z PROJECTED BACK OF Z Y UEa�� O ? O x w x n LD^ — � 2 Y o �) U EXIST. CENTERLINE a O Im T N CURB ELEVATION, (TYP) �Q N O ��^ 3 : C\1 JB -3 STR-6 N C\1 GRADE (TYP) N C\1 Q 3 1928 : -- . . : : . : : . : . . : : : 1928 1926 —. . . . . . . . : : —_: J B-2 — .— —. - - - -777 -. - . . . T �. P-9 1926 ------ P-8. STR-4: __ 204' Of: . 1924 --- ---- Concrete Pipe : : . --- — --- 1924 —: -. P-7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . : . . . . . . . . „ q,1.15% . — ---- — — — . 21 . . . . . . of 98' of . - — - — — — — 24" Concrete Pipe 1922 .. ........ 30" Concrete:Pip ..... - -. —. — r — — — ... — — . . ... ..... . ......... ......... ......... ......... ......... 1.7°l0:....... 1922 - - -.. ...... ......... ......... ......... ......... ......... ......... ......... ......... 1920 1920 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 1918 1918 508+00 508+25 508+50 508+75 509+00 509+25 509+50 509+75 510+00 510+25 510+50 510+75 511+00 511+25 511+50 Stru cture Rim & Sump Elevations Pipe Bearing Elevation @ Station O) � O) r` 00 Mao rn �� ISN �(O �01 N (0 I,- N O) O O) N N N N N N co N rnrn rnrn rnrn rnrn 00 0 20 40 Feet 0 4 8 VERTICAL SCALE: Feet 509+00 STORM SEWER PROFILE SCALE: 1" = 20' 510+00 CENTERLINE 511+00 LAKEVIEW AVE. - PIPE PROFILE Structure O It rn � 4 Rim & Sump �L om N oM a o s oM rn O) N U� 00 O M ( co N �? 00 0 co °' N ? m T 3 E N p C/^) U M N ^/ — / O OOi _ (6 O O 6I O O ` 0 Lu W Z o-0 T O N Q Z O 6 N O o Z Y UEa�� O ? O x w x n LD^ � 2 Y o �) U F y a O Im T N �Q N O W 3 E C\1 U O N N C\1 N C\1 Q 3 0 20 40 Feet 0 4 8 VERTICAL SCALE: Feet 509+00 STORM SEWER PROFILE SCALE: 1" = 20' 510+00 CENTERLINE 511+00 LAKEVIEW AVE. - PIPE PROFILE Structure O It rn � 4 Rim & Sump �L om N oM a o s oM rn =_� a Q�o w 3 ? ° Wt �.N o N W N Elevations s�� °2 °2 °2 °' N ? m T 3 E N p C/^) U Pipe Bearing Elevation @ Stati o n N O 00 o F U N 4 L6 �L om N N a o s rn rn =_� a W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly U J J w C� Q J J i Y O O 0�CID H LU U LU O ry ry W 3:W C) U) Q m LU z U) CD z U) Q /^ F2 vJ o F U N W x �L om 1 z Z a U) a o s =_� a Q�o w 3 ? ° Wt �.N o W U s�� N N ? m T 3 E N p C/^) U M N ^/ — / O OOi _ (6 O O 6I O O ` 0 Lu W Z o-0 T O N Q Z O 6 N O o Z Y UEa�� O ? O x w x n LD^ � 2 Y o �) U F y a O Im T / �Q N O W 3 E LLl U O N N N Q 3 U ao C/) z J� N (n O) 0 Z Z W O �LU 2 W cc U ry C-4 DATE: JANUARY, 2019 LAKEVIEW 6" ADDITION ADDENDUM NO. 1 STORM SEWER PROJECT January 31, 2019 HASTINGS, NEBRASKA WDA PROJECT 4921L-18 L INSTRUCTIONS A. This supplement to the Plans and Specifications is issued prior to the receipt of bids. All work covered in this supplement shall be included in the original quotation and the supplement will be considered one of the Contract Documents. B. All work performed under this supplement shall be subject to the General Conditions of the contract and the specifications for similar work in connection with this project. C. The proposed Contract Documents for this work are modified as follows: II. SPECIFICATIONS A. Section 00310 —See new Proposal Form attached. B. Section 02220 — Trench Excavation and Backfill IL D. Trench installation as well as pipe bedding and backfill shall conform to NDOT Standard Plan 411-R2. C. Section 03400 — Concrete Culvert Pipe 2.b. In the case of concrete pipe, Type 1 soil shall be placed in the haunch area to the spring line. In the case of plastic pipe, Type 1 soil shall be placed to a minimum of 12" about the outside diameter of the pipe. See NDOT Standard Plan 411-R2 for details and soil types. III. DRAWINGS A. SHEET C-1 —The following note shall be added: ADDENDUM #1: CONTRACTOR SHALL REFER TO NDOT STANDARD PLAN 411-R2 FOR BEDDING AND BACKFILL DETAIL. FOR CONCRETE PIPE COMPACTED SAND IS REQUIRED TO THE SPRING LINE OF PIPE. FOR PLASTIC PIPE COMPACTED SAND IS REQUIRED TO 12" ABOVE TOP OF PIPE. B. SHEET C -1/C -2/C-3 —Removed structure JB -4. Moved structure STR-3 East to coincide with property line. Decreased depth of structure STR-3 and rotated pipe P-5 to match structure. Revised drawings attached. W DESIGN ASSOCIATES MED)OK/HASTINGS, NEBRASKA J. 31, 2019 ADDENDUM 1 - 1 5192,_AANDERSNDLV6[GESPECS�D#, 921L 18 W DESIGN ASSOCIATES Consulting Engineers & Architects McCook, Nebraska 69001 Hastings, Nebraska 68901 LAKEVIEW 6" ADDITION ADDENDUM NO. 1 STORM SEWER PROJECT January 31, 2019 HASTINGS, NEBRASKA WDA PROJECT 4921L-18 L INSTRUCTIONS A. This supplement to the Plans and Specifications is issued prior to the receipt of bids. All work covered in this supplement shall be included in the original quotation and the supplement will be considered one of the Contract Documents. B. All work performed under this supplement shall be subject to the General Conditions of the contract and the specifications for similar work in connection with this project. C. The proposed Contract Documents for this work are modified as follows: II. SPECIFICATIONS A. Section 00310 —See new Proposal Form attached. B. Section 02220 — Trench Excavation and Backfill IL D. Trench installation as well as pipe bedding and backfill shall conform to NDOT Standard Plan 411-R2. C. Section 03400 — Concrete Culvert Pipe 2.b. In the case of concrete pipe, Type 1 soil shall be placed in the haunch area to the spring line. In the case of plastic pipe, Type 1 soil shall be placed to a minimum of 12" about the outside diameter of the pipe. See NDOT Standard Plan 411-R2 for details and soil types. III. DRAWINGS A. SHEET C-1 —The following note shall be added: ADDENDUM #1: CONTRACTOR SHALL REFER TO NDOT STANDARD PLAN 411-R2 FOR BEDDING AND BACKFILL DETAIL. FOR CONCRETE PIPE COMPACTED SAND IS REQUIRED TO THE SPRING LINE OF PIPE. FOR PLASTIC PIPE COMPACTED SAND IS REQUIRED TO 12" ABOVE TOP OF PIPE. B. SHEET C -1/C -2/C-3 —Removed structure JB -4. Moved structure STR-3 East to coincide with property line. Decreased depth of structure STR-3 and rotated pipe P-5 to match structure. Revised drawings attached. W DESIGN ASSOCIATES MED)OK/HASTINGS, NEBRASKA J. 31, 2019 ADDENDUM 1 - 1 5192,_AANDERSNDLV6[GESPECS�D#, 921L 18 C. NDOT Standard Plan 411-R2 attached for reference. IV. APPROVED MANUFACTURER'S/SUBSTITUTIONS Contractor shall verify that all approved manufacturers are equal to those specified during the bidding phase. Architect/Engineer will verify products are equal to those specified during the shop drawing phase. V. CLARIFICATIONS — None at this time. End of Addendum #1 W DESIGN ASSOCIATES MED)OK/HASTINGS, NEBRASKA J. 31, 2019 ADDENDUM 1 - 2 5192,_AANDERSNDLV6[GESPECS�D#, 921L 18 00310 - PROPOSAL FORM TO: Westbrook Village L.L.0 Hastings, Nebraska Proposal of doing business as (a corporation, organized and existing under the laws of the State of Nebraska, a partnership, or an individual), hereinafter called the "Bidder" to Westbrook Village L.L.0 of Hastings, Nebraska (hereinafter called "Owner"). The undersigned acknowledges that he has received the following: 1. Project Specifications and Drawings 2. Addendum(s), (if any, list No's.) The Bidder in compliance with the invitation for bids for the construction of the LAKEVIEW 6TH ADDITION STORM SEWER PROJECT in Hastings, Nebraska, having examined the Plans and Specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, supplies, overhead profit, insurance, etc., and to construct the project in accordance with the contract documents, within the time set forth herein, and at the unit prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is a part. STORM SEWER CONTRACT ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL PRICE 1 18" RCP, Class III 64 L. F. _ 2 24" RCP, Class III 186 L. F. _ 3 30" RCP, Class III 775 L. F. _ 4 36" RCP, Class III 32 L. F. _ 5 48" RCP, Class III 264 L. F. _ 6 Build Curb Inlet Y=4', Plan 443-Rl 1 3 EA. _ 7 Build Curb Inlet Y=7', B=5.08', 1 EA. _ Plan 443-R11 8 Build Curb Inlet Y=11', B=O, 1 EA. Plan 443-R11 9 Build Curb Inlet Y=18', B = 0, 1 EA. _ Plan 443-R11 10 Build Curb Inlet Y=18', B = 2'9" 1 EA. _ Plan 443-R11 11 Build Concrete Junction Box EA. YxY,-3'0"x4'0" XA9=5.7' _ TOTAL BID ($ 1 W DESIGN ASSOCIATES MECOOK/HASTINGS, NEBRASKA J. 31, 2019 00310- 1 S:I921- ANDERS0NLV6[GESPECSS00310921L 18 Explanation of Alternate Bid Items: Alternates may be selected as replacement for the associated item in the base bid (i.e. they are not to be considered an add or deduct). Any accessories or additional plant, labor and materials needed to make the alternate a complete equal replacement for the base bid item should be included in the alternate bid item. ALTERNATE BID ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL PRICE 3a 30" HDPE, Type S 99 L. F. TOTAL (ALTERNATE) BID ($ 1 Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informality in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 calendar days after the scheduled closing time for receiving bids. If selected, the bidder agrees to enter into a contract with the Owner with the proposed terms and construct the project as described in the specifications and shown on the plans, for the unit prices bid herein. Bidder further agrees to commence work under this contract as stated below. Contractor's Proposed Schedule: Start Date: Completion Date: Bidder further agrees to pay as liquidated damages, the sum of $250.00 for each consecutive calendar day after the agreed completion date for which the work is not complete. Upon receipt of written notice of the acceptance of this bid, bidder will execute the formal contract attached within 10 days and deliver any Bonds as required by these contract documents. Respectfully Submitted, (SEAL - if bid is by a Corp.) By: (Name & Title) (Company) (Business Address & Zip Code) W DESIGN ASSOCIATES MECOOK/HASTINGS, NEBRASKA J. 31, 2019 00310-2 S:I921- ANDERS0NLV6[GESPECSS00310921L 18 O LL d� O N r -I M r -I 0 r -I O V 00 y� 1=1 Al c- 0 0 c— El BP: 0 0 0 BP: 0+00.00 �_ STORM SEWER PLAN - LAKEVIEW AVE. SCALE: 1" = 20' LAKEVIEW AVE. - PIPE PROFILE 1924 F 2 '0 1924 � O O r 00 M M O a0 O N N � ' 1918 Rim & Sump O � 1916 LO N N 1914 Nt "t N N rn rn rn rn rn rn _. —: —: �P 1922 r U w W Z a o 3 n .2 o ° o zZ � UEa�o ' ^ 6? O fl C) x n V Q a � 2 1922 . : : : EXISTING CENTERLINE: . : : : : : t Q �. : : . : : : :— : EES . : : : ui U U N O N GRADE (TYP) / —^ STR-1 1920 : — : 1920 PROJECTED BACK OF . CURB ELEVATION, (TYP) ... — 1918 - - - - 1918 1916 - - -.. 1916 —.— —:- P-1 : : —.-. -- 264'of. . : : : : : . —.--- 1914 _ _. — rete Pipe ---- . . . . 1914 @1.85% - --- _ EXP -1 . . _ . . . — . 1912 of — — — — — 1912 EX -1 4 .O Concrete Pi e: - - — — — STA:0+40.62 : pj A.50%: : — - — — 1910 RIM:1916.64 _ — . — 1910 . NOTE: 1908 . . . . . . . . . . . . . . CONTRACTOR SHALL VERIFY SLOPE AND . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . 1908 LOCATION OF EXISTING 48"0 RCP (EXP -1). SEE TABLE FOR RCP PIPE P-1 SIZE REQUIREMENTS.. 1906 1906 499+75 500+00 500+25 500+50 500+75 501+00 501+25 501+50 501+75 502+00 502+25 502+50 502+75 503+00 Structure Rim & Sump Elevations Pipe Bearing Elevation @ Station ao 0 CR14: N Lo N O O 500+00 501+00 502+00 HORIZONTAL SCALE: 0 20 40 Feet STORM SEWER PROFILE a@ CENTERLINE 0 4 8 SCALE: 1" = 20' VERTICAL SCALE: Feet TRANSVERSE PIPE #1 PROFILE 1926 1926 1924 1922 1920 1918 1916 1914 Stru cture Rim & Sump Elevations Pipe Bearing Elevation @ Stati o n ■M -M! MM - c F 2 '0 O � O O r 00 M M O a0 O N N � ' 1918 Rim & Sump O � 1916 LO N N 1914 Nt "t N N rn rn rn rn rn rn rn rn �P 500+00 501+00 502+00 HORIZONTAL SCALE: 0 20 40 Feet STORM SEWER PROFILE a@ CENTERLINE 0 4 8 SCALE: 1" = 20' VERTICAL SCALE: Feet TRANSVERSE PIPE #1 PROFILE 1926 1926 1924 1922 1920 1918 1916 1914 Stru cture Rim & Sump Elevations Pipe Bearing Elevation @ Stati o n ■M -M! MM - c F 2 M � N W 1920 �L om 1 CR � ' 1918 Rim & Sump rn � 1916 LO W LO 1914 1 STORM SEWER PROFILE R CENTERLINE SCALE: 1" = 20' LAKEVIEW AVE. - PIPE PROFILE 1924 1924 Pipe Bearing Elevation @ Station M F 2 M � N W Structure �L om 1 CR � CR rn Rim & Sump rn � 0Q °UDS two LO W LO U s�� N N N Elevations T 3 E N o Pipe Bearing Elevation @ Station M F 2 M � N W LO �L om 1 L6 a o s Ln a rn � 0Q °UDS two _ W 503+00 W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly U J J w C� Q J J Y O O 0�CID H LU U LU O 0� W 3:W C) I D Q i LU Y Q J /^ F 2 FO U N W x �L om 1 z Z a U) a o s a Q�o W 3 0Q °UDS two _ W U s�� N N ? m T 3 E N o s �P r U w W Z a o 3 n .2 o ° o zZ � UEa�o ' ^ 6? O fl C) x n V Q a � 2 F3 oo Y UT t Q �Eo W�z 3 EES ui U U N O N U 00 C/) z J N (n 0 0 Z Z LU O Y CQ �LU 2 W ccUIY C:) O N 00 N LU ry C-2 DATE: JANUARY, 2019 503+00 503+25 503+50 503+75 504+00 504+25 504+50 504+75 505+00 505+25 505+50 505+75 506+00 506+25 506+50 506+75 507+00 507+25 507+50 507+75 508+00 508+25 Structure Rim & Sump Elevations Pipe Bearing Elevation @ Station 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 504+00 505+00 STORM SEWER PROFILE SCALE: 1" = 20' 506+00 CENTERLINE 507+00 508+00 W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly U J J LU C� Q J J U LU O ry ry W 3:W C) U) Q m LU z U) CD z U) Q /^ F 2 "t CRrn �CR �:� x N L I1- (O 00 =_� a N w 3 ? ° Wt �.N o LO 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 504+00 505+00 STORM SEWER PROFILE SCALE: 1" = 20' 506+00 CENTERLINE 507+00 508+00 W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly U J J LU C� Q J J U LU O ry ry W 3:W C) U) Q m LU z U) CD z U) Q /^ F 2 "t N W x �L om 1 z Z a U) 00 =_� a N w 3 ? ° Wt �.N o LO U (O In it CO CO a) (O N CO N 00 O� I� co LO O 6I O> 00 D O N Q I1- O co Y 00 co � � �a � O) N � 5 O T U / 5 t Q �Eo W� 3 E E 00 00 U O N 06 ai rn rn o 6 0 Q 3 N 7 fL rn rn � rn rn rn � rn rn rn � rn rn rn � rn rn rn � 0 20 40 HORIZONTAL SCALE: Feet 0 4 8 VERTICAL SCALE: Feet 504+00 505+00 STORM SEWER PROFILE SCALE: 1" = 20' 506+00 CENTERLINE 507+00 508+00 W Design is not contracted to provide a Coordinating Professional on the Westbrook Village L.L.C., Lakeview 6th Addition development project. Our professional stamp(s) shown on this project are for details shown in these drawings. This bar is one inch long on original drawing. if not one inch on this sheet, adjust scales accordingly U J J LU C� Q J J U LU O ry ry W 3:W C) U) Q m LU z U) CD z U) Q /^ F 2 F0 U N W x �L om 1 z Z a U) a o s =_� a Q�o w 3 ? ° Wt �.N o W U s�� N N T 3 E N p M N O Owl _ (6 O O O 6I O> 0 uu W Z D O N Q Z O 6 N O o Z Y UEa�� O ? O x W x n WW� LD^ �a 2 Y o 5 O T U / 5 t Q �Eo W� 3 E E LLl U O N O N N Q 3 N 7 fL ao C/) z J� N (n 0) 0 Z Z w O Y CQ �LU 2 W cc U ry C-3 DATE: JANUARY, 2019 8 u TABLE 1 - CONCRETE STANDARD INSTALLATIONS. SOILS AND MINIMUM COMPACTION REOUIREMENTS INSTALLATION BEDDING HAUNCH AND LOWER TYPE THICKNESS OUTER BEDDING SIDE 90% SW. 95% ML, 100% CL, TYPE 1 95% SW OR NATURAL SOILS OF EQUAL FIRMNESS D0/24 MINIMUM. NOT LESS THAN 85% SW, 90% ML, 3" IF ROCK 90% SW 95% CL, TYPE 2 FOUNDATION,USE OR OR NATURAL DO/12 MINIMUM. 95% ML SOILS OF NOT LESS EQUAL FIRMNESS THAN 6". 85% SW, 85% SW, 90% ML, 90% ML. 95% CL, *TYPE 3 OR OR NATURAL 95% CL SOILS OF EQUAL FIRMNESS TABLE 1 NOTES: 0 THE TYPE 3 INSTALLATION (SHADED) 1N TABLE 4 IS THE NDOR MINIMUM STANDARD, USING EITHER A SHAPED TRENCH ACCORDING TO THE STANDARD SPECIFICATIONS, OR AT THE OPTION OF THE CONTRACTOR, THE BEDDING WITH COMPACTIONS AS SHOWN. MAXIMUM FILL HEIGHTS FOR THE TYPE 1. 2. AND 3 INSTALLATIONS ARE SHOWN IN TABLE 4. NATURAL GROUND OVER FILL— — — THE SOIL IN THE LOWER SIDE ZONE, IF NOT IN SITU (OVER EXCAVATED), SHALL BE APPROVED MATERIAL AND i -i COMPACTED. SEE TABLE i BEDDING SEE TABLE 1 PLACE 3 FT. TO 4 FT. OF COHESIVE SOIL PLUG AT THE INLET AROUND THE CULVERT TO PREVENT SECONDARY FLOWS END SECTION OVER FILL - SW, ML, OR CL USE TYPICAL ROADBED COMPACTION AT MAX. 6" LIFT INTERVALS. FLOW LINE (INVERT) SPRING LINE HAUNCH AREA - SEE TABLE 1 FILL TO SPRING LINE LOWER SIDE - - SEE TABLE 1 MIDDLE BEDDING, LOOSELY PLACED UNCOMPACTED BEDDING, SAME OUTER BEDDING, SAME MATERIAL REQUIREMENTS AS HAUNCH AREA MATERIAL AND COMPACTION REQUIREMENTS AS HAUNCH AREA TRENCH DETAILS SHOWN ARE MINIMUM REQUIREMENTS FOR DESIGN AND CONSTRUCTION. PAYMENT FOR EXCAVATION IS BASED UPON THE GUIDELINES IN THE STANDARD SPECIFICATIONS. TRENCHES SHALL BE EXCAVATED IN ACCORDANCE WITH APPROVED SAFETY PRACTICE. TYPICAL TRENCH INSTALLATION PLACE 3 FT. TO 4 FT. OF COHESIVE SOIL PLUG AT THE OUTLET AROUND THE CULVERT TO PREVENT EROSION. END SECTION LIMITS OF BEDDING AND BACKFILL EXCAVATION, BEDDING AND EMBANKMENT SEQUENCE: TRENCH INSTALLATION: (A) DETERMINE THE FLOW LINE AND TRENCH BOTTOM ELEVATIONS. (B) DETERMINE THE SHAPE OF TRENCH. DECIDE IF SHORING IS NEEDED. CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR THE SAFETY OF ALL WORKERS, EQUIPMENT AND MATERIALS IN THE TRENCH. (C) PLACE THE BEDDING MATERIAL (SEE CONCRETE - TABLE 1) LOOSELY. (D) PLACE PIPE ON THE BEDDING AND COMPACT OUTER BEDDING, (SEE TABLE 1). (E) PLACE AND COMPACT THE LOWER SIDE, HAUNCH AND OVERFILL MATERIAL AT 6 IN. INTERVALS. EMBANKMENT INSTALLATION. (A) DETERMINE THE FLOW LINE AND SPRING LINE ELEVATION. (B) IF FLOW LINE IS ABOVE THE NATURAL GROUND, PLACE AN EMBANKMENT AT LEAST JDO WIDE WITH 3:1 FORESLOPES OR FLATTER AT SPRING LINE ELEVATION, COMPACTED AT ROADBED REQUIRED COMPACTION. (C) IF THE FLOW LINE IS BELOW THE NATURAL GROUND BUT THE SPRING LINE IS ABOVE THE NATURAL GROUND, PLACE THE EMBANKMENT SIMILAR TO THE ONE IN STEP B. (D) EXCAVATE TO PROPER ELEVATION. (E) PLACE BEDDING MATERIAL (SEE TABLE 1) LOOSELY. (F) PLACE THE PIPE ON THE BEDDING MATERIAL AND COMPACT OUTER BEDDING MATERIAL (SEE CONCRETE - TABLE 1). (G) PLACE AND COMPACT THE HAUNCH. LOWER SIDE AND OVERFILL MATERIAL AT 6 IN. INTERVALS. NOTES FOR TRENCH INSTALLATIONS: 1. COMPACTION AND SOIL SYMBOLS, I.E. 95% SW, REFER TO SW SOIL MATERIAL WITH MINIMUM STANDARD PROCTOR COMPACTION OF 95X. 2. THE TRENCH TOP ELEVATION SHALL BE NO LOWER THAN 1 FT. BELOW THE BOTTOM OF THE PAVEMENT BASE MATERIAL. 3. SOIL IN BEDDING AND HAUNCH ZONES SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS SPECIFIED FOR THE MAJORITY OF SOIL IN THE BACKFILL ZONES. 4. THE TRENCH WIDTH SHALL BE WIDER THAN SHOWY IF REQUIRED FOR ADEQUATE SPACE TO ATTAIN THE SPECIFIED COMPACTION IN THE HAUNCH AND BEDDING ZONES. 5. FOR TRENCH WALLS THAT ARE WITHIN 10 DEGREES OF VERTICAL, THE COMPACTION OR FIRMNESS OF THE SOIL IN THE TRENCH WALLS AND LOWER SIDE ZONE NEED NOT TO BE CONSIDERED. 6. FOR TRENCH WALLS WITH GREATER THAN 10 DEGREE SLOPES THAT CONSIST OF EMBANKMENT, THE LOWER SIDE SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS SPECIFIED FOR THE SOIL IN THE BACKFILL ZONE. 8 u TABLE 1 — CONCRETE STANDARD INSTALLATIONS, SOILS AND MINIMUM COMPACTION REOUIREMENTS INSTALLATION BEDDING HAUNCH AND LOWER TYPE THICKNESS OUTER BEDDING SIDE TYPE 1 95% SW 90% SW. 95% ML 23 27 28.5 NO. 4 OR 100% CL 26.5 31.5 OO/24 MINIMUM, 24 30 34.5 36.5 WELL GRADED SANDS AND GRAVELLY -SANDS: 27 NOT LESS THAN 41 30 3" IF ROCK 90% SW 85% SW, 90% ML TYPE 2 FOUNDATION,USE DO/12 OR DR 95% CL 42 MINIMUM, 95% ML 44 48 NOT LESS 71 49 54 THAN 6". 80 55 60 72 85 89 61 66 85% SW, 97 *TYPE 3 72 90% ML, 85X SW, 90% ML 73 78 OR DR 95X CL 79 84 95% CL 123 TABLE 1 NOTES: M THE TYPE 3 INSTALLATION !SHADED) IN TABLE 4 IS THE NDOR MINIMUM STANDARD, USING EITHER A SHAPED TRENCH ACCORDING TO THE STANDARD SPECIFICATIONS, OR AT THE OPTION OF THE CONTRACTOR, THE BEDDING WITH COMPACTIONS AS SHOWN. MAXIMUM FILL HEIGHTS FOR THE TYPE 1. 2, AND 3 INSTALLATIONS ARE SHOWN IN TABLE 4. D0/6 (MIN.) SPRING LINE NATURAL GROUND BEDING SEE D TABLE 1 J TABLE 2 — CONCRETE PIPE DIMENSIONS NOMINAL PIPE STANDARD OUTSIDE PIPE DIAMETER, DO (SPAN) PERCENTAGE PASSING SIEVE SIZES DIAMETER (INCHES) ROUND ARCH PIPE PIPE H. ELLIP. V. PIPE ELLIP. PIPE 15 19.5 22.5 DESCRIPTION 18 23 27 28.5 NO. 4 21 26.5 31.5 24 30 34.5 36.5 WELL GRADED SANDS AND GRAVELLY -SANDS: 27 33.5 41 30 37 43.25 45.5 36 44 51.75 54 38 42 51 60.13 63 44 48 58 68.5 71 49 54 65 76 80 55 60 72 85 89 61 66 79 97 67 72 86 102 106 73 78 93 114 79 84 100 118 123 85 90 107 96 114 102 121 108 128 TOP OF SUBGRADE DO D0/6 (MIN.) OVER FILL - SW, ML, OR CL USE TYPICAL ROADBED COMPACTION AT MAX. 6" LIFT INTERVALS FILL EMBANKMENT LOWER SIDE SEE TABLE i HAUNCH AREA - SEE TABLE 1 FILL TO SPRING LINE OUTER BEDDING, SAME MATERIAL MIDDLE BEDDING, LOOSELY PLACED AND COMPACTION REQUIREMENTS UNCOMPACTED BEDDING, SAME AS HAUNCH AREA / MATERIAL REQUIREMENTS AS HAUNCH AREA !� FOUNDATION J TYPICAL EMBANKMENT INSTALLATION TABLE 3 SOIL CLASSIFICATION FOR BEDDING & BACKFILL ASTM PERCENTAGE PASSING SIEVE SIZES SOIL GROUP DESCRIPTION SY24OL 11/2 IN. NO. 4 NO. 200 ST SW WELL GRADED SANDS AND GRAVELLY -SANDS: >50X OF "COURSE 45X LITTLE OR NO FINES. NON PLASTIC 100% FRACTION" ML INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY -FINE -SANDS, SILTS WITH SLIGHT PLASTICITY 100% ) 5OX CL INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELY -CLAYS, SANDY -CLAYS, SILTY -CLAYS, LEAN CLAYS NOTES FOR EMBANKMENT INSTALLATIONS 1. COMPACTION AND SOIL SYMBOLS, I.E. 95% SW, REFER TO SW SOIL MATERIAL WITH A MINIMUM STANDARD PROCTOR COMPACTION OF 95X 2. SOIL IN THE OUTER BEDDING, HAUNCH, AND LOWER SIDE ZONES, EXCEPT WITHIN THE DO/3 MIDDLE BEDDING, SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS THE MAJORITY OF THE SOIL IN THE OVERFILL ZONES. J. SUBTRENCHES 3.1 A SUBTRENCH IS DEFINED AS A TRENCH WITH ITS TOP AT AN ELEVATION LOWER THAN i FT. BELOW THE BOTTOM OF THE PAVEMENT BASE MATERIAL. 3.2 THE MINIMUM WIDTH OF A SUBTRENCH SHALL BE 1.33D0. OR WIDER IF REQUIRED FOR ADEQUATE SPACE TO ATTAIN THE SPECIFIED COMPACTION IN THE HAUNCH AND BEDDING ZONES. S3 FOR SUBTRENCHES WITH WALLS OF NATURAL SOIL, ANY PORTION OF THE LOWER SIDE ZONE IN THE SUBTRENCH WALL SHALL BE AT LEAST AS FIRM AS AN EQUIVALENT SOIL PLACED TO THE COMPACTION REQUIREMENTS SPECIFIED FOR THE LOWER SIDE ZONE, AND AS FIRM AS THE MAJORITY OF SOIL IN THE OVERFILL ZONE, OR SHALL BE REMOVED AND REPLACED WITH SOIL COMPACTED TO THE SPECIFIED LEVEL. GENERAL NOTES WHEN IN-SITU LATERAL SOIL RESISTANCE IS NEGLIGIBLE, E.G. PEAT, MUCK, OR HIGHLY EXPANSIVE SOIL, EMBEDMENT SHALL BE PLACED AND COMPACTED AT THE DIRECTION OF THE ENGINEER. TO PROTECT THE PIPE AND BACKFILL DURING CONSTRUCTION, PROVIDE A MINIMUM OF 36" OF COMPACTED FILL MATERIAL OVER THE TOP OF THE PIPE BEFORE ALLOWING ANY HEAVY EQUIPMENT TO TRAVERSE OVER THE PIPE. EXTREMELY HEAVY EQUIPMENT MAY REQUIRE LARGER COVER AS DETERMINED BY THE CONTRACTOR. THE PIPE VOLUME SHOULD NOT BE SUBTRACTED FROM THE VOLUME OF EXCAVATION. THESE DESIGN STANDARDS ARE MINIMUM. IF A MORE RESTRICTIVE DESIGN IS REQUIRED BY THE ENGINEER OR CULVERT MANUFACTURER, THEN THESE STANDARDS SHALL BE MODIFIED. CHANGES TO PAY ITEM QUANTITIES DUE TO UNFORESEEN SITE CONDITIONS SHALL BE CALCULATED AND INCORPORATED INTO THE CONTRACT THRU A CHANGE ORDER. BOTH ENDS OF THE PIPE SHALL BE SEALED WITH COHESIVE SOIL (AROUND THE PIPE EXTENDING 3 FT. TO 4 FT. FROM EACH END) TO PROTECT AGAINST INFILTRATION AND EROSION. BEDDING AND BACKFILL MATERIAL 15 NOT PAID FOR DIRECTLY, BUT IS SUBSIDIARY TO THE LINEAR FEET OF CIE VERT. BEDDING AND BACKFILL MATERIAL SHALL MEET ASTM D 2487 (SOIL GROUPS AS SHOWN IN TABLE 3). PERCENT COMPACTION SHALL BE DETERMINED IN ACCORDANCE WITH NOOR STANDARD TEST METHOD T 99. TABLE 1 — CONCRETE STANDARD INSTALLATIONS, SOILS AND MINIMUM COMPACTION REQUIREMENTS INSTALLATION BEDDING HAUNCH AND LOWER TYPE THICKNESS OUTER BEDDING SIDE TYPE 1 1350 95% SW 90% SW, 95% ML 0.01 -IN. CRACK III 0.14 OR 100% CL D -LOAD TO DO/24 MINIMUM, PRODUCE THE 2000 3000 3750 NOT LESS THAN 3" IF ROCK 90% SW 85% SW. 90% ML TYPE 2 EOUNDATION,USE OR OR 95% CL /12 MINIMUM, 95% ML NOT LESS THAN 6". 85% SW, :*:TYPF:3 90% ML, 85% SW, 90% ML OR OR 95% CL 95% CL NOTES: is THE TYPE 3 INSTALLATION (SHADED) IN TABLE 4 IS THE NOOR MINIMUN STANDARD, USING EITHER A SHAPED TRENCH ACCORDING TO THE STANDARD SPECIFICATIONS, OR AT THE OPTION OF THE CONTRACTOR, THE BEDDING WITH COMPACTIONS AS SHOWN. MAXIMUM FILL HEIGHTS FOR THE TYPE 1. 2. AND 3 INSTALLATIONS ARE SHOWN 1N TABLE 4. INSTALLATION TYPE 2 AND TYPE 1 ARE IMPROVED METHODS IN ORDER TO SUPPORT HIGHER FILL HEIGHTS USING CLASS 111, IV, AND V CIRCULAR CONCRETE PIPE. INSTALLATION TYPE I WILL PROVIDE THE BEST 1N -SITU PERFORMANCE USING GREATER COMPACTION WITH GRANULAR BEDDING AND BACKFILL. THE CONTRACTOR WILL CHOOSE THE INSTALLATION TYPE AND CLASS OF PIPE. ACTUAL PROJECT FILL HEIGHTS MUST BE KNOWN IN ORDER TO USE TABLE 4. ROUND EQUIVALENT, NON -CIRCULAR PIPE SUCH AS ARCH OR ELLIPTICAL PIPE, MAY BE SELECTED, PROVIDED SUCH PIPE ARE DESIGNED AND MANUFACTURED TO THE SAME D -LOADS AND ULTIMATE STRENGTHS (SEE TABLE 5J AS THE SELECTED CIRCULAR PIPE FROM THE FILL HEIGHT TABLE. 8 u TABLE 5 D—LOADS FOR CONCRETE PIPE PIPE CLASS III IV V D -LOAD TO 0.08 18 III PRODUCE A 1350 2000 3000 0.01 -IN. CRACK III 0.14 D -LOAD TO PRODUCE THE 2000 3000 3750 ULTIMATE LOAD NOTES: LOAD ON PIPE IN POUNDS PER LINEAR FOOT = D -LOAD X INSIDE SPAN IN FEET D -LOAD = TEST LOAD EXPRESSED IN POUNDS -FORCE PER LINEAR FOOT PER FOOT OF DIAMETER TABLE 4 MAXIMUM FILL HEIGHTS (FEET) FOR STANDARD DESIGN (AASHTO M 170) ROUND CONCRETE PIPE INSTALLATION TYPE 2 1 INSTALLATION TYPE 1 TABLE 4 NOTES: AASHTO M 170 SPECIFICATIONS ARE MODIFIED AS FOLLOWS: ONLY SINGLE INNER CAGE, CIRCULAR REINFORCING IS ALLOWED FOR CLASS 111, 15", 18", 21", AND 24" ROUND RCP AS SHOWN: PIPE SIZE (IN.) CLASS MINIMUM CIRCUMFERENTIAL REINFORCING (IN. 2/FT. OF PIPE WALL) 15 III 0.08 18 III 0.10 21 III 0.12 24 III 0.14 APPLICABLE SPECIFICATIONS: AASHTO M 170 ---ROUND RCP AASHTO M 206 ---ARCH RCP AASHTO M 207 ---ELLIPTICAL RCP GENERAL NOTES FILL HEIGHTS SHOWN IN TABLE 4 WERE DEVELOPED USING ASCE STANDARDS FOR DIRECT DESIGN OF BURIED PRECAST CONCRETE PIPE, MANUFACTURED IN ACCORDANCE WITH AASHTO M 170 SPECIFICATION REGUIREMENTS (SEE TABLE 4 FOOTNOTE FOR EXCEPTIONS). FILL HEIGHTS SHOWN APPLY ONLY TO RONDO PIPE (UNDER FULL FLOW CONOITIONSI, USED (ADDER RIGID AND FLEXIBLE PAVEMENT, WITH SOIL OVERFILL WEIGHING 120 POUNDS PER CUBIC FOOT. UNDER SPECIAL CIRCUMSTANCES (WHERE PAVEMENT IS NOT USED AND LIVE LOAD BECOMES CRITICAL, OR DIFFERENT SOIL DENSITY IS ENCOUNTERED, OR THE ONE FOOT MINIMUM CLEARANCE FROM THE BOTTOM OF THE PAVEMENT TO THE TOP OF THE PIPE CANNOT BE MAINTAINED) THESE FILL HEIGHTS MAY NEED TO BE MODIFIED. DEEPER FILL HEIGHTS MAY BE USED BY SUBMITTING A SPECIAL STANDARD INSTALLATION DIRECT DESIGN (S1DD) FOR NDOR APPROVAL. CONCRETE PIPE DESIGNS THAT ARE NOT SHOWN IN APPLICABLE AASHTO SPECIFICATIONS WILL BE CONSIDERED SPECIAL DESIGNS THAT MUST BE SUBMITTED TO NOOR FOR APPROVAL. 8 u DIAMETER) NATURAL GROUND 12" MIN. i OUTSIDE CROWN 12" MIN. LIFT LINES AT 6" MAX. 8 — INTERVALS (TYP.) i SEE REQUIRED ROADBED COMPACTION COMPACTED GRANULAR MATERIAL TRENCH DETAILS SHOWN ARE MINIMUM REQUIREMENTS FOR DESIGN AND CONSTRUCTION. PAYMENT FOR EXCAVATION IS BASED UPON THE GUIDELINES IN THE STANDARD SPECIFICATIONS. 6" MIN. PIPE BOTTOM TRENCHES SHALL BE EXCAVATED IN ACCORDANCE WITH APPROVED SAFETY PRACTICE. TYPICAL TRENCH INSTALLATION TABLE 1 - PLASTIC SOIL CLASSIFICATION FOR GRANULAR FILL MATERIAL SOIL GROUP TRENCH INSTALLATION % PASSING SIEVE SIZES SYMBOL DESCRIPTION 11/2 IN. N0. 4 N0. 200 D 2487 11 11 WELL GRADED GRAVEL AND 15 18 12 GW GRAVEL -SAND MIXTURES; 18 24 13 13 LITTLE OR NO FINES. 24 IOOX OF COARRR FRACTION 15 15 POORLY GRADED GRAVEL GP AND GRAVEL -SAND MIXTURES; 17 17 24 24 LITTLE OR NO FINES. 100% 24 16X 24 WELL GRADED SAND AND 24 SW GRAVEL -SANDS; LITTLE DR 24 54 24 24 NO FINES. 24 )Box OF COARRW FRACTION 24 24 POORLY GRADED SAND SP AND GRAVEL-SANDSI 24 24 LITTLE OR NO FINES. 24 24 E.G. SAND AND GRAVELS WHICH 24 24 GW -GC ARE BORDER LINE BETWEEN 100% VARIES 5% TO 12% SP -SM CLEAN AND WITH FINES. GM SILTY GRAVEL, GRAVEL - SAND -SILT MIXTURES. IGOX OF COARWW FRACTION CLAYEY -GRAVEL, GRAVEL- GC SAND -CLAY MIXTURES. 100% 12% TO 50% SILTY SANDS, SAND -SILT )5oX SM MIXTURES. FCOAAFRACTI� PLACE 3 FT. TO 4 FT. OF COHESIVE SOIL PLUG AT THE INLET AROUND THE CULVERT TO PREVENT SECONDARY FLOWS. END SECTION TABLE 2 - PLASTIC MINIMUM D (INCHES) LIMITS OF BEDDING AND BACKFILL 6" MIN. NOTES TOP OF SUBGRADE LIFT LINES AT 6" MAX. INTERVALS fTYP.J SEE ROADBED COMPACTION \ REQUIREMENTS NATURAL GROUND SEE TABLE 2 L COMPACTED GRA)KLAR MATERIAL TYPICAL EMBANKMENT INSTALLATION INSTALLATIONS AS SHOWN ARE REQUIRED UNDER ALL SURFACED ROADWAYS. BEDDING AND BACKFILL FOR DRIVE PIPE OR OTHER PIPE OUTSIDE THE ROADWAY PRISM (OR BACK OF CURB -LINE FOR URBAN PROJECTS) MAY BE INSTALLED USING SUITABLE EXISTING SOIL, PLACED AND COMPACTED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. WHERE IN-SITU LATERAL SOIL RESISTANCE IS NEGLIGIBLE E.G. PEAT MUCK, OR HIGHLY EXPANSIVE SOIL, EMBEDMENT SHALL BE PLACED AND COMPACTED AT THE DIRECTION OF THE ENGINEER. TO PROTECT THE PIPE AND BACKFILL DURING CONSTRUCTION, PROVIDE A MINIMUM OF 36" OF COMPACTED FILL MATERIAL OVER THE TOP OF THE PIPE BEFORE ALLOWING ANY HEAVY EOUIPMENT TO TRAVERSE OVER THE PIPE. EXTREMELY HEAVY EOVIPMENT MAY REQUIRE LARGER COVER AS DETERMINED BY THE CONTRACTOR. PIPE VOLUME SHOULO NOT BE SUBTRACTED FROM THE VOLUME OF EXCAVATION. THESE DESIGN STANDARDS ARE MINIMUM. IF A MORE RESTRICTIVE DESIGN IS REOUIRED BY THE ENGINEER OR THE CULVERT MANUFACTURER, THEN THESE STANDARDS SHALL BE MODIFIED. CHANGES TO PAY ITEM GUANTITIES DUE TO UNFORESEEN SITE CONDITIONS SHALL BE CALCULATED AND INCORPORATED INTO THE CONTRACT BY A CHANGE ORDER. EXPOSED ENDS OF THE PIPE SHALL BE SEALED WITH COHESIVE SOIL (AROUND THE PIPE EXTENDING 3 FT. TO 4 FT. FROM EACH END) TO PROTECT AGAINST INFILTRATION AND EROSION. GRANULAR FILL MATERIAL IS NOT PAID FOR DIRECTLY, BUT IS SUBSIDIARY TO THE LINEAR FEET OF CULVERT. GRANULAR MATERIAL SHALL MEET ASTM D 2487 (SOIL GROUP AS SHOWN IN TABLE 1). MATERIAL SHALL BE COMPACTED TO AT LEAST 9OX PROCTOR TEST DENSITY. PERCENT COMPACTION SHALL BE DETERMINED IN ACCORDANCE WITH NOOR STANDARD TEST METHOD T 99. PLACE 3 FT. TO 4 FT. OF COHESIVE SOIL PLUG AT THE OUTLET AROUND THE CULVERT TO PREVENT EROSION. END SECTION TRENCH INSTALLATION EMBANKMENT INSTALLATION NOMINAL PIPE DIAMETER (INCHES) METAL PIPE PLASTIC PIPE METAL PIPE PLASTIC PIPE 15 11 11 15 15 18 12 12 18 18 24 13 13 24 24 30 15 15 24 24 36 17 17 24 24 42 24 24 24 24 48 24 24 24 24 54 24 24 24 24 60 24 24 24 24 66 24 24 72 24 24 78 24 24 84 24 24 LIMITS OF BEDDING AND BACKFILL 6" MIN. NOTES TOP OF SUBGRADE LIFT LINES AT 6" MAX. INTERVALS fTYP.J SEE ROADBED COMPACTION \ REQUIREMENTS NATURAL GROUND SEE TABLE 2 L COMPACTED GRA)KLAR MATERIAL TYPICAL EMBANKMENT INSTALLATION INSTALLATIONS AS SHOWN ARE REQUIRED UNDER ALL SURFACED ROADWAYS. BEDDING AND BACKFILL FOR DRIVE PIPE OR OTHER PIPE OUTSIDE THE ROADWAY PRISM (OR BACK OF CURB -LINE FOR URBAN PROJECTS) MAY BE INSTALLED USING SUITABLE EXISTING SOIL, PLACED AND COMPACTED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. WHERE IN-SITU LATERAL SOIL RESISTANCE IS NEGLIGIBLE E.G. PEAT MUCK, OR HIGHLY EXPANSIVE SOIL, EMBEDMENT SHALL BE PLACED AND COMPACTED AT THE DIRECTION OF THE ENGINEER. TO PROTECT THE PIPE AND BACKFILL DURING CONSTRUCTION, PROVIDE A MINIMUM OF 36" OF COMPACTED FILL MATERIAL OVER THE TOP OF THE PIPE BEFORE ALLOWING ANY HEAVY EOUIPMENT TO TRAVERSE OVER THE PIPE. EXTREMELY HEAVY EOVIPMENT MAY REQUIRE LARGER COVER AS DETERMINED BY THE CONTRACTOR. PIPE VOLUME SHOULO NOT BE SUBTRACTED FROM THE VOLUME OF EXCAVATION. THESE DESIGN STANDARDS ARE MINIMUM. IF A MORE RESTRICTIVE DESIGN IS REOUIRED BY THE ENGINEER OR THE CULVERT MANUFACTURER, THEN THESE STANDARDS SHALL BE MODIFIED. CHANGES TO PAY ITEM GUANTITIES DUE TO UNFORESEEN SITE CONDITIONS SHALL BE CALCULATED AND INCORPORATED INTO THE CONTRACT BY A CHANGE ORDER. EXPOSED ENDS OF THE PIPE SHALL BE SEALED WITH COHESIVE SOIL (AROUND THE PIPE EXTENDING 3 FT. TO 4 FT. FROM EACH END) TO PROTECT AGAINST INFILTRATION AND EROSION. GRANULAR FILL MATERIAL IS NOT PAID FOR DIRECTLY, BUT IS SUBSIDIARY TO THE LINEAR FEET OF CULVERT. GRANULAR MATERIAL SHALL MEET ASTM D 2487 (SOIL GROUP AS SHOWN IN TABLE 1). MATERIAL SHALL BE COMPACTED TO AT LEAST 9OX PROCTOR TEST DENSITY. PERCENT COMPACTION SHALL BE DETERMINED IN ACCORDANCE WITH NOOR STANDARD TEST METHOD T 99. PLACE 3 FT. TO 4 FT. OF COHESIVE SOIL PLUG AT THE OUTLET AROUND THE CULVERT TO PREVENT EROSION. END SECTION