HomeMy WebLinkAboutM-330(56)ITE4 NO. Total Length/Width of Milled Area 2,578' x 42' Face of curb to face of curb. Will cover gutter flow line. New asphalt depth 311" approx. Type "A" Special Asphalt Resurfacing Milled Area M-330(66) Highway 6 Begin mulled construction. ESTIMATED DESCRIPTION QUANTITIES 1. Rotomill Pavement 2. Recycled Asphalt Mix Type "R" 3. Asphaltic Concrete 4. Asphaltic Concrete 5. Asphaltic Concrete Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 8. Emulsified Asphalt (SSIH) for Tack Coat Applied 6. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (478) 12. Build PR. Concrete Pavement 13. Build 30" Curb & Gutter 14. ' Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 16. Remove 30" Curb & Gutter iS. Adjust Manhole to Grade 20. Adjust Gas Valve to Grads 21. Adjust Water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road Type B" Type 'C" for 12,031.0 2,606.0 UNIT 8.Y. Ton Ton Ton Ton 13,030.0 Gal. Gal. 3,008.0 Gal. C.Y. S.Y. S.Y. S.Y. L.F. S.F. L.F. S.Y. S.F. L.F. 4.0 Each Each Each Each L.F. Per Station NOTE: All drives and approaches will be asphalted back, as directed by Engineer in field. Quantities and Details for Overlay section on next page. NOTE: Re -striping of new road will be done by others. ••.. .W1 .4 •1 13 /4 JO /5 .. + .. a►a.► 141 • 22 "sr 16 /7 118 1.91 20 2I 4• ►• s / 2 3 4 5 4. w • • • 4 • , 4 4 .411•/1 •,. ,Y 4, 11 Y•• •11• LI ,J 22 /Y • 2 1041 NOTE: It will be the responsibility of the ,contractor to dispose of all pavement removal. KEY • concrete paving • concrete sub -base (Mills 2-3") Nee asphalt depth 3S" approx. • Asphalt base "Overlay Only" New asphalt depth 3 1/2" approx. .. r 4 f w• NOTE: ptok Survey rar3fs41 1 V 1 PARK, 7 9 9 p // /P 1 24 ADD 7e 9 /O 1/ /2 ,Y ,v ,d •J 1:nd IA3llud ewlbtruction. 5 DA y • SON 4 l 1 3 / 2 ••, f •Y ADO AOTLr the for possible sur y mar -r rior to work. Y✓ • . . 2 4N Buyin overlay conetr uction. CIE x1If g/7 419 x/5- /4 4 h• Y ••oo for possible prior to wo. CIRCLE Y 7 ..aFtil 9 1 • I 1441 44 Y 4444• .•f4 j 4 • 1 1 . Gm r -a E1 `v� hrr 4.1��' s`.. Q' col • 4Y 11 CIRCLE L meg leo V4.4.I• ilio else Vain [CIRCLE [Di kaa at v 4 a /I 12 4.4 . u r► ,Y' J e / 4 5 ,•,-1 / 6 -I 4 at . ��.4. 4 /s w i/ • x /0 : 9 9 7 f1 C/KCL E . I. 3 4 S 6 - 6sli)beri STREET i S r CIMCL E 1 a r; i -4 • CIRCLE - 94114' co/eV/WNW UJ CIRCLE CIRCLE STREET CIRCLE 4.4 R/MR 4441 mills -1111M, AIM NJ/if yJI, •� -fie •• 14„ .1 C//RCL E D rw,hn?$ /w.,✓ .lua eniaor 1 Th ("/2p era CIRCLE L 1 J ( South Street A Slreel 8 Street C Slieel D 5/reel rAor Asphalt Resurfacing CIRCLE p DESCAIPTION South Street - Elm to 6th Avenue CIRCLE 0 • Enginw i CIRCLE N DSNI SY JN 4.4 R/MR 4441 mills -1111M, AIM NJ/if yJI, •� -fie •• 14„ .1 C//RCL E D rw,hn?$ /w.,✓ .lua eniaor 1 Th ("/2p era CIRCLE L 1 J ( South Street A Slreel 8 Street C Slieel D 5/reel rAor Asphalt Resurfacing PAW NO M-330(56) DESCAIPTION South Street - Elm to 6th Avenue Hastings City Enginw i g DSNI SY JN DATE 2/92 emommTOs DAN SY JN ARAD SY A$♦UILT$ DIN NO - / Of 3 .1► .ns.- aim.- anew s �. 4.4 49 • •N..• • W �- F- Street 1 A/ MK 14 SEC /7.7- 9 Q1 ,4'jjc=13 GJ SMITHS I La_.7 ADD RAYMAKER & BLAKE SUB. sT. _-__MMSS re Farr r 0 5 9 s 7 11 6 111 11111410 re circ r 5 20 4 6ST. IMP 4 21 312 2223 NOME V7 O W e. I = 0 3 4 • 6 11 O $ WIT 3 4 3 • • t 2 1 i See WEL _ a s so Ne 4 w 11114 ee fee • it i -1141111141-111111r11111- 1 1 W t 1 9 se• WOVE End overlay construction. M Inlay will be milled at endings. Location and size to be determined in field by Engineer and Contractor. N NOTE: Shoulder area from edge of asphalt to face of steel guard rails will be excavated and full depth asphalt will be placed. This will be done on both north and south ends of bridge structure the entire length of guard rails. NOTE: Contractor wilk2mill down to existing concrete across bridge decking. Milling will start approximately 100' north of structure and end approximately 100' south of structure. Contractor will lay only 1S" of mix across existing bridge deck. NOTE: Check for possible survey marker prior to work. Asphalt Resurfacing Overlay Area M-330(66) Highway 6 ITEM NO. DESCRIPTION ESTIMATED QUANTITIES 1. Rotomvll Pavement 2. Recycled Asphalt Mix Type "R" 3. Asphaltic Concrete Type "8" 4. Asphaltic Concrete Type "C" 5. Asphaltic Concrete for Patching 6. Asphaltic Cement (AC -5) 7. Asphaltic Cement (AC -10) 6. Emulsified Asphalt (88IN) for Tack Coat Applied 9. Excavate Soil Base 10. Restabilize Sub -Grade 11. Build 6" Pavement (478) 12. Build PR. Concrete Pavement 13. Build 30' Curb i Gutter 14. Build 4" Sidewalk 15. Build 6" Integral Curb 16. Remove Concrete Pavement 17. Remove Sidewalk 16. Remove 30" Curb & Gutter 11. Adjust Manhole to Grade 20. Adjust Gas Valve to Grade 21. Adjust water Valve to Grade 22. Adjust Grate Inlets to Grade 23. Saw Cut 24. Shouldering edge of road Total Length/Width of Overlayed 5,600' x 24' Edge of road to edge of road. New asphalt depth 3S" approx. Type "A" Special Area KEY concrete paving • concrete sub -base (Hill: 2-3") Asphalt base "Overlay Only" New asphalt depth 3 1/2" approx. NOTE: Shouldering material will be hauled from City stockpile. NOTE: A11 drives and approaches will be asphalted back, as directed by Engineer in field. NOTE:, Re -striping of new road will be done by others. 1,557.0 3,016.0 11,410.0 UNIT B.Y. Ton Ton Ton Ton Gal. Gal. 3,733.0 Gal. 216.0 C.Y. S.Y. B.Y. S.Y. L.F. S.F. L.F. S.Y. S.F. L.F. 1.0 Each Each 2.0 Each Each L.F. 56.0 Per Station ly -/ //>jje'l ) MOW Asphalt Resurfacing HIO, Na M-330(56) mmoso C Elm Avenue - South to "J" Street Hastrgs ChY Er Bring MI" aY irm 2/92 0ONTNICTOa Oen EY JN sivao iY A3SUILTh 01x0 NO .2 of 3