Loading...
HomeMy WebLinkAboutR200040 NOTES: The siiinsnt and subpads shell be adjusted to conform to 91e Ides and wades on the plans in a000rderloe with Section 202, 204 and 301 d91e 1916 SWAN, Spedkelons end Is supplements. The upper sip) inches of the *bipeds slri be sorNed, rind and recomputed to 91e following Percent Den* ANO Winum Requirements 96 Mn. Opt. -3% Opt. +3% ken not meeting wiled moisture densly test requiremenis steel be removed and reoowpected et 91e Conhc,'ioYs glee. AI subprede concpedion and welt necessary for sabred* construction shi not be paid for dire* but shell be c rsidered slbeiiy b the Isms of the conked Enevellon. bedding and sewing mai , Ile bars, dowel pint end Misted Ord seerrd steel be considu,d sdsiiery be unit pis per wpm yard of pavement CALL BEFORE YOU DIG • �A DIGGERS HOTLINE OF NEBRASKA Call 1--800-331-5666 ih f R - 2000 RESURFACING ..W i R , / it:' Altair -,F.-=-7-: 4 t 4 41 IrY sm. In ,1 y _Y A 5S 7 - 1_ , =�!- 'tet' - - Ur .'— ri I i — 1 1 f,*{'!...1 Hastings City Engineering -7- ziooa tlastings City Surveyor Date t i r North DENVER AVENUE R-2000-2 ELM AVENUE R-2000-1 • Hastings, NE Hastings City Engineer SP 5-- 9- Z000 Dote • 041 O O O N W W 1 Z W D 2 H 0 z Q 0 C\J th LL J W -� r C CD 32' ij 22' 65' 65' 25 .. C V CD —4- Top Lift Only � I CD t 0 0 0 0 31' Typical Section of Existing Street No Sale O.% ]1 (.‘ Typical Section of Proposed Resurfacing No scale 2600' f -7 76' S D CD 76' r T CD • i - 47• I • NOTES: Base Lift will consist of 2" Type 14 Top Lift will consist of 1.5" Type 17c10.40 Flowlines are to be covered on Top Lift only on both sides of the sheet.. Extra care will be taken to eeintein water flow. Concrete sub -base may require various pitching to be determined by Engineer after milling operation and street les been dewed. * Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphah. Contractor shall use care in maneuvering heavy equipment over and wound this Project. Existing curb and gutters are in poor condition and the 5" concrete base will not withatard a lot of weight. Contractor shall leave existing asphalt as is between the two site of Railroad trade. Will lay asphalt up to the concrete slabs on the outside of each set of rails. (.‘ !M' NORTH Scale: l "=144' 1M' CD CD COb 28 ITEM NO. DESCRIPTION I 2 3 4 5 6 7 $ Rotomill Pavement Asphaltic Concrete Type 14 Asphaltic Concrete Type 17c/0 40 Asphaltic Cement (AC -I0) Emulsified Asph. (SS 1 H) Tack Cot Build 6" Concrete Pavement (47B) Build 6" Concrete Pavemait For Patching(47B High -Early) Build 30" Curb & Gutter 9 Build 4" Concrete Sidewalk(ABX) l0 11 12 13 14 15 16 17 1$ 19 Build Integral Curb (47B) Remove Concrete Pavement Remove 30" Curb & Gutter Remove Sidewalk Remove Integral Curb Adjust Manhole to Grade Adjust Gas Valve to Grade Adjust Water Valve to Grade SSW Cut Asphaltic Concrete Type 17c/0.40 for Dnvewtays ESTIMATED QvAxrrrws 10.261.0 1211.0 9882.0 132.0 2566.0 10.0 300.0 254.0 10.0 210.0 300.0 254.0 10.0 7 1 2 250.0 10 UNIT S.Y. Ton Ton Ton Gal S.Y. S.Y. L.F. S.F. L.F. S.Y. L.F. S.F. L.F. Each Each Each L.F. Ton Aciv OF HASTINGS, ENGINEERING DEPT. R-2000 Resurfacing Project 144. fie.R-2000-1 emeligin Elm Avenue — South St. to 7th St. emir ~8.8. Ms3 99 c�.si.. Inn 1111 ,B.B. _ S • it 12110.12' Denver Avenue W. ►*******************4,4,40* ►•1 N I•N W*•*•*•*•*•*•NN *•*•*•*•*•* •►� 1*`* ►*4 * * 40 41•#• 41 •�•�•�•• 4 *. iNt 0.4 1 . 0 (D 0 0 o ►*•* V ►**44,4*4 44XX a►•4bw Typical Section of Existing Street No Sara 2• Toa 14 A4,I141t Soso Lain 1.S• Type 17C Asphalt T. U t 31' Typical Section of Proposed As u facing No Salo 414 NOM& S O CD cD -k Base Lift will consist of 2" Type 14 Top Lift will consist of I.5" Type 17c/0.40 — 4- - 4- - — — - Diredi.a-t Doan. S 1230.0' t Flowlines we to be covered on Top Lift oras specified in field by Engineer. Concrete sub -base may require various patching to be determined by Engineer after milling operation and shunt has been cleaned. Ends and returns on Project will be sawed prior to installation of Base Lift. Returns at 11th Street will be done when 11th Street is Resurfaced under this contract. Some Driveways on this project have asphalt and concrete patched into the gutteriine - Contractor shall use caution not to damage driveways during the ranoval of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing curb and gutters are in poor condition and the 5" concrete base will not witretand a lot of weight. EEM NO. 1 2 NORTH Elp> Scale: 1"=100' 1N' -N' DESCRIPTION Rotomill Pavement Asphaltic Concrete Type 14 3 Asphaltic Concrete Type 17c/0.40 4 Asphaltic Cement (AC -10) 5 Emulsified Aleph. (SS IH) Tack Coat 6 Build 6" Concrete Pavement (4711) 7 Build 6' Concrete Pavement For Patching(47B High-Ewly) $ Build 30" Curb & Gutter 9 Build 4" Concrete Sidewalk(ABX) 10 Build Retaining Wall 11 12 13 14 15 16 17 18 19 20 Build Integral Cub (47B) Remove Concrete Pavement Remove 30" Curb t Gutter Remove Sidewalk Remove Retaining Wall Remove Integral Curb Adjust Manhole to Grade Adjust Gas Valve to Grade Adjust Water Valve to Grade Saw Cut ES'TIMA1ED QUAN MES 8671 1130.00 847.00 115.0 2167.7 7.5 50 297.0 171.5 0 57.5 297.0 156.5 p 6 252.5 • UNIT S.Y. Ton Ton Tan Gal. S.Y S.Y. L.F. S.F. L.F. L.F. S.Y. L.F. S.F. L.F. L.F. Each Each Each L.F. zCITY OF HASTINGS, ENGINEERING DEPT. R-2000 Resurfacing Projec 1404. R-2000-2 .1"'~'" Denver Ave.= 7th to 12th fir 4 96 Ointreeirr B.B.