HomeMy WebLinkAboutCR-2001PLAN
DETAIL OF INLET LID
NOT TO SCALE
SECTION
PARK LANE DRIVE
VALLEY CHASE
NOTES:
1. APPROXIMATELY 60 C.Y OF EXCESS EXCAVATION
WILL BE DERIVED FROM THE CONSTRUCTION OF THIS PROJECT.
2. ALL EXCESS EXCAVATION DERIVED FROM THE CONSTRUCTION
OF THIS PROJECT SHALL BE HAULED TO THE CITY STOCK PILE AT A STREET.
3. CONTRACTOR SHALL SALVAGE RING AND COVER
ON OLD INLET LID DURING REMOVAL.
NORTH AC)6.
Scale: 1"=20
20' 0' 20' 40' 60'
ESTIMATED QTY. FOR PARK LANE DRIVE
ESTIMATED
ITEM NO. DESCRIPTION QUANTITIES UNIT
REMOVE
1 CONCRETE PAVEMENT 1040 S.Y
2 INTREGAL CURB & GUTTER 500
L.F
3 SIDEWALK 770 S.F
4 CONCRETE DRIVEWAY
65
5 CONCRETE INLET LID 1
S.Y
E.A
BUILD
6 8" P.C.C.PAVEMENT (47B) 1040 S.Y
7 6" P.C.C.INTREGAL CURB (47B) 500 L.F
8 4" P.C.C.SIDEWALK (ABX) 770 S.F
9 6" PCC DRIVEWAY (47B) 65 S.Y
10 CONCRETE INLET LID 1 E.A
11 SAW CUT
12 ADJUST MANHOLE
195 L.F
2 E.A
. CITY OF HASTINGS,
ENGINEERING DEPT.
Project
PARK LANE DRIVE
P°` No. CR— 2001
Ption panel replacement
Design By Dote Contractor
Jeff L. 6/01' I - /
ao.n Br Jeff L. "pp",e°6 �� 7/ : ra. 1 of 1
2
I I
LIFT
BAR
T I
1
#4 BARS AT 9" CTRS.
-it
i
0
L_L_L
I 1 i_
LI
±
i
#4 BARS AT 8 3/4" CTRS.
9,
DETAIL OF INLET LID
NOT TO SCALE
SECTION
PARK LANE DRIVE
VALLEY CHASE
NOTES:
1. APPROXIMATELY 60 C.Y OF EXCESS EXCAVATION
WILL BE DERIVED FROM THE CONSTRUCTION OF THIS PROJECT.
2. ALL EXCESS EXCAVATION DERIVED FROM THE CONSTRUCTION
OF THIS PROJECT SHALL BE HAULED TO THE CITY STOCK PILE AT A STREET.
3. CONTRACTOR SHALL SALVAGE RING AND COVER
ON OLD INLET LID DURING REMOVAL.
NORTH AC)6.
Scale: 1"=20
20' 0' 20' 40' 60'
ESTIMATED QTY. FOR PARK LANE DRIVE
ESTIMATED
ITEM NO. DESCRIPTION QUANTITIES UNIT
REMOVE
1 CONCRETE PAVEMENT 1040 S.Y
2 INTREGAL CURB & GUTTER 500
L.F
3 SIDEWALK 770 S.F
4 CONCRETE DRIVEWAY
65
5 CONCRETE INLET LID 1
S.Y
E.A
BUILD
6 8" P.C.C.PAVEMENT (47B) 1040 S.Y
7 6" P.C.C.INTREGAL CURB (47B) 500 L.F
8 4" P.C.C.SIDEWALK (ABX) 770 S.F
9 6" PCC DRIVEWAY (47B) 65 S.Y
10 CONCRETE INLET LID 1 E.A
11 SAW CUT
12 ADJUST MANHOLE
195 L.F
2 E.A
. CITY OF HASTINGS,
ENGINEERING DEPT.
Project
PARK LANE DRIVE
P°` No. CR— 2001
Ption panel replacement
Design By Dote Contractor
Jeff L. 6/01' I - /
ao.n Br Jeff L. "pp",e°6 �� 7/ : ra. 1 of 1