Loading...
HomeMy WebLinkAboutINT-2005NOTES: The embankment and subgrade shall be adjusted to conform to the lines and. grades on the plans in accordance with Section 202, 204 and 301 of the 1997 Standard State Specifications and its supplements. The upper six (6) inches of the subgrade shall be scarified, mixed and recompacted to the following compaction requirements: Percent Density Moisture Minimum Requirements Maximum 95 Min. Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All subgrade compaction and water necessary for subgrade construction shall not be paid for directly but shall be considered subsidiary to the items of the contract. Excavation, backfilling, and sawing control joints, keyway, tie bars, dowel pins, and rubberized joint sealant shall be considered subsidiary to the unit price per square yard of pavement. CALL BEFORE YOU DIG DIGGERS HOTLINE OF NEBRASKA 1-800-331-5666 • 9TH & CRANE INTERSECTION INT -2005 ® North L/. iu �, 5 9T 1 ii m I:��i,� wan. n�:Eu-:ij��� . Well 1!u-I-IIIIIIlat= 15111106111111:31:11111 pI IIr!11111.1I Gi 11 11 k r 1011I:�:.1 _nIIIIIi. rem ;���111111 nCl�•: AIm 0 , 111111 UMf mmllwltl mmmL I II�,f41lf 11 11 i�InmINIII �min . NMI e(womumnianni Wean 912111 �lriI^j1111111 IIIIR 1111IIIA"'- �'' tit; Hastings City Engineering Hastings City Surveyor Date Utilities Director of Engineering Date Hastings, NE 0Tig ate ° a DAM WACKER Rm. a - g • E-5020 e 8 az- toor Hastings City Engineer Date z 0 U VJ cc w z w z cc U 0 0) Note: Care shall be taken not to disturb the existing curb inlet. PC' Raclin, •< 36 x <• . a a 4 .4 <, . 4 x S X X- / 0 6, 0.42 °?° 6' 7• 4 4 L 4 . a 4 x x x XX • / x 1 95 1' 76 / / 4 x ,1 XX x 4 0' x s •Lt 1.24 % tPj O �°� 1.05 74._<o• x x X-4 a PC' Raclin, s Existing Concrete Water Valve 0 Man Hole MH �s 0.60 % c9S .8, •mss 0.50 % MH 4 a d 1.50% 0.73% 0.50%c96, t 0.60 % h ;o• c9 6' 0 •O0 1 9638 *L 10' 1 1 1 3 / ifr 11 / / PC' Raclin, x 4 x x 00 •y0 x xx x 4 4 d4 x x 00 0.86% s f •c�j. x 4 i <.. PC' Raclin, a. • s SII=WAL< PAVEv-\T REv❑VALS North West 187 Sq Ft North South West 36' X 10' 168 Sq Ft 40 Sq Yds 210 Sq Ft South 206 Sq Ft 36' X 10' Sq Yds 40 Sq Yds 36' X 30' East 771 Sq Ft 36' X 30' 120 Sq Yds West Sq Yds 36' X 30' Way intersect. 120 Sq Yds 4 Way intersect. 36' Road / 20' Radius 502 Sq Yds Sq Yds Total = 822 Sq Yds SII=WAL< REN❑VALS North West 187 Sq Ft 187 Sq Ft South West 168 Sq Ft 168 Sq Ft South East 210 Sq Ft 210 Sq Ft North East 206 Sq Ft 206 Sq Ft Sq Yds East 36' X 30' Total = 771 Sq Ft 3UILD 511 SIDEWAL< (47B) 3UILD 8" PAVEVENT(473) 2 187 Sq Ft North 36' X 10' 168 Sq Ft 40 Sq Yds 210 Sq Ft South 36' X 10' 206 Sq Ft 40 Sq Yds East 36' X 30' 771 Sq Ft 120 Sq Yds West 36' X 30' 120 Sq Yds 4 Way intersect. 36' Road / 20' Radius 502 Sq Yds Total = 822 Sq Yds 3UILD 511 SIDEWAL< (47B) North West 2 187 Sq Ft South West 1 168 Sq Ft North East 210 Sq Ft South East 206 Sq Ft Total = 771 Sq Ft Ad justVater Valve to Grade Last side Crane, South side 9th 2 Each Last side Crane, North side of 9th in sidewalk 1 Each ,,,t. f{....,,.,,,, 00000 OT ssios% VOe ®g@ <p :es. /�� 0��;DAViD D_3 1 AOK R mss c7 : E-5093 ?gym tooe Adjust Manhole to Grade CL 9th Rt of Crane CL 1 Each CL 9th Lt of Crane CL 1 Each CITY OF HASTINGS, ENGINEERING DEPT. 7 0 Project INT -2005 Proj. No. INT -2005 Description Intersection at 9th and Crane Design By RLM Drawn By RLM Date 5-05 Contractor Approved By segraeJ Drn. No. 1 of 1