Loading...
HomeMy WebLinkAboutPD2005-12PIN TAIL AVENUE -WEST LOCHLAND ROAD NORTH 829.53' t Ii.�Y_ 'll�tt�t�It®Z � r —_-r ratra.s-I � r ■■r•aa1=l L Bi so a* i e X1a� MIS 1111111111fl U = In 'Lain� + 1111 Fil=e=���-i+' IEI .it. =nattier !!mO'1 11 a i'IIM i11t,I 1�! t ® Scale: None n It '% ,e\ North End Project Sta. 108+62.82 Begin Project Sta. 100+00 Paving District 2005-12 LEGEND o4, 0 UP • • 3-22.01 0 FH H WV H GV Utilities Director of Engineering Date Spot Elevation Utility Pole Control Point - Nail Set Control Point - Temporary Wood Hub Set Deciduous Tree Coniferous Tree Manhole Fire Hydrant Water Valve Gas Valve p. EJB 1912 Light Telephone Box Electrical Junction Box Contour Line —.—.—.—.—.---.—.—.—.—.— Flowline — - - — - - — - - — - - — Property Line CALL BEFORE YOU DIG DIGGERS HOTLINE OF NEBRASKA 1-800-331-5666 • .4•47^ .00.001101•1001046-1 s -St - toed Hastings City Surveyor Date INDEX OF SHEETS SHEET NO. 1 SHEET NO. 2-3 SHEET NO. 4 SHEET NO. 5-8 COVER SHEET PLAN & PROFILE SHEET JOINT DETAIL CROSS SECTION SHEETS SUMMARY OF QUANTITIES aa AarLaWACKER14093 •js= ITEM NO. DESCRIPTION ESTIMATFA QUANTITIES UNIT 1 Build 6" P.C.C. Concrete Pavement (47B) 3,054.22 S.Y. 2 Build 6" P.C.C. Integral Curb (47B) 1,736.4 L.F. 3 Build Concrete Header (47B) 31.0 L.F. 4 Build Storm Sewer Inlet "Type A" 2.0 Each 5 Build 21" RE.RC.P. Storm Sewer Class III 132.0 L.F. 6 Build 21" RE.RC.P. Flared End Section 3.0 Each 7 Build 6" P.C.C. Concrete Flume (47B) 24L0 S.Y. 8 Adjust Manhole to Grade 3.0 Each 9 Adjust Water Valve to Grade 1.00 Each 10 Adjust Gas Valve to Grade 1.00 Each 11 Saw Cut 71.00 L.F. 12 Traffic Control 1.00 Lump Sum NOTES: The embankment and subgrade shall be adjusted to conform to the lines and grades on the plans in accordance with Section 205 and 302 of the 1997 Standard State Specifications and its supplements. The upper six (6) inches of the subgrade shall be scarified, mixed and recompacted to the following compaction requirements: Percent Density 95 Min. Moisture Minimum Requirements Maximum Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All subgrade compaction and water necessary for subgrade construction shall not be paid for directly but shall be considered subsidiary to the items of the contract. Excavation, backfilling, and sawing control joints, keyway, tie bars, dowel pins, and rubberized joint sealant shall be considered subsidiary to the unit price per square yard of pavement. Ow Of a Hastings City Engineer 3 -Lr- Looe Date A CITY OF HASTINGS, ENGINEERING DEPT. Project PIN TAIL AVENUE - W. LOCHLAND RD. NORTH 829.53' Proj. No. Description PD 2005-12 COVER SHEET Design By R.G.D. Drown By B.B. Date l�]3/2200006� % MP�r at Contractor Dm. No. 1 of 8 0 2 BUILD 6" P.C.C. PAVEMENT 47B Station to Station Side Sq. Yards 100+10.05 to 105+00 LT & RT 1711.50 ---1- -1- 103+15 103+15 RT RT A 1 Each BUILD 6" P.C.C. INTEGRAL CURB Station to Station Side Lin. Ft. 100+12 to 105+00 LT & RT 999.0 ---1- -1- 103+15 103+15 RT RT A 1 Each ADJUST MANHOLE TO GRADE I Station Side 100+10.05 100+24 CL ---1- -1- 103+15 103+15 RT RT SAW CUT Station to Station Side Lin. Ft. 1 100+10.05 LT & RT 71.0 103+10.59 LT & RT 80.0 B4)P = 99+70.001 N = 943.74 E = 496.66 Z I cc J 0 0 0 S oA .90 .67, 0 #/ F -23 C9 O It 214G 6 TC 21.43 TC F, 21.07 TC 2 21 x Fi 2 60 cZ 20.71 TC •'o ZZ • >< Nmz-o Pi Puns A yT+u rnv, °°co 20 �SS 20.35 TC 21.0 Pb- 20.93 FL 24.3601 21.24 GL 0.72% 20.57 FL 20.21 FL 19.85 FL 0.72% 2Q.88 CL PIN TAIL AVENUE 20.16 CL 6 II co 0 co 0 co a.0 0m cc J al IL cc N N lZ E 19.99 TC 19.63 TO 119 55 TC 19.79 TC 19.49 FL 0 72%,..-19:13: tL05 FL _s II II I) �) 19.80 L .2--72%1944 CL 19.36 CL 0.5% 19.4 CIL TYPE "A" DETAIL OF TANDEM 72" LONG COMBINATION 2047 Curb Inlet Frame, Grate & Curb. Two Abutting (DEETER OR EQUAL) az o Front View • /..YcI.:O.cO..cle/e%" / yc%Y..Ye%s/.a Fi ramZV 2 pde- o3S oPo) w atm co 20.0QTC 20:25 T Vertical and Horizontol Reinforcing No. 4 Rebor 0 12" O.C. Side View ?0 20.50 TO • main P no OC 22-- -21- ACo 20-- 20.75 TC 19.50 FL 19.81 CL 19.75 FL 20.06 CL 20.00 FL 20.31 CL 0.5% 0.5% 20.25 FL 20.56 CL BUILD 21" RERCP STORM SEWER CLASS III Station to Station Side Lin. Ft \I 100+27.0 LT & RT 52.0 r\, 103+10.59 LT & RT 80.0 BUILD 21" RERCP FLARED END SECTION j Station to Station Side Each I 100+27.0 LT & RT 2.0 103+10.59 RT 1.0 BUILD STORM SEWER INLET Station Side Type Quantity 103+10.59 SEE DETAIL LT A 1 Each 103+10.59 SEE DETAIL RT A 1 Each SCALES - 1" = 20' HOR 1"=2'VER 0 , 'F7 '0 I 4, 4- `6) 21. 2 --o--1----. /y2�o-IA-=)6 S VAO t0p- 10 +00 66 FL 20.93 FL o=7p% 29.57 FL .56 T& 21.43 TC 21.07 TO co Street Light to be moved 20 20r52 -CL 20.21 00co 102+00� -19:85-FL 8" Sewer MDT - 19.49 FL 0.72% 9 '6Q 103+00 19.13 FL ny '9 S 9.05 FL 0.5% 19.25 FL , 9S 104+00 19.50 FL 19.75 FL Fi -170 &t 105+00 0.5% 20.00 FL ._ 20.25FL 20.71 TC 8" Water Main 20.35 TC 19.99 TC 19.63 TC 3.55 TC 19.75 TC 20.00 TC 20.25 TC 20.50 TC 20.75 TC 8" Water Main To by Hastings Utilities prior to construction. (� 0 100 •69 0 \ 9F To F '9 1 , 9g, aA, <6 - 6 0 '0 x 9 NOTE: 1. Approx. 809 C.Y. of Embankment will be needed for the construction of this project. 678 C.Y. will be derived from the construction of Pin Tail Circle which can be used on this project. That leaves a deficit of 131 C.Y. that will need to be hauled to the project. The Contractor shall notifyxthe City where the dirt is coming from so that a Proctor curve can be generated for Giompaction-testin 8 2. The cone section of the manhole at Sta. 103+15 is too high. 7(9,� Hastings Utilities will be working to correct this problem before street construction. 0 3. Contractor shall grade ditch at each end of the flared end sections so it will drain. !) 4. Contractor shall saw cut existing asphalt street to get a good straight edge '69 to tie into. 17 c O 8 m 0 0 61. N 28 26 T'E.M: _ Fina hlxdi•ant,:SW Co NW Bonnet Bolt Elev. =1.913.81 Ldchiand Rd./.Osborne Dr. West 0 ,S BUILD 6" DRAINAGE FLUME 47B Station to Station Side Sq. Yards 103+10.59 RT 241.0 14.67 FL Flume @ Back Prop. Line Ll Property Line 12.75 FL Flume Back of Curb FL = 12.50 ± 5' E 1. 18 5' Inverted Drainage Flume Detail SCALE: None CJTY_PL_H_ASTI NGS, ENGINEERING -DEP -T _0 Project PIN TAIL AVENUE - W. LOCHLAND ROAD NORTH 829.53' Proj. No. PD 2005-12 Description Construction Plan Design By R.G.D. Dote 3/2006 Carfroctor Drown BY B.B. Approved By Dm. No. 2 of 8 T.R.M: = Fire Hydratit;. S.:Side of Cocblarid:RcL 1001 -West of•Pin Tail -Ave. Elev. =.1925.24 24 � -� 0 O O II N -I6 w w WI- STA • _ VPI• EL• 2 00+20:00 :46 g1 • _- 0:72% g2 • =0.72% CURVE LEN = - 0.00 28 �-'"- 26 24 22 20 18 16 14 12 co co 0 18.9 0.72% FL 21"-RERCP N Proposed G •side co as 0 O--1 cxp +kV V 0.72% xisting G ad N VPI - STA - 03+10.59 22 20 18 16 14 12 10 Y w w 2 a w E a -• w 6. a m 2 j a tU 0) e to c OD A N N N O N oa co C N V N N «) N N n N N co 6 N U) a) 0 CO aS d) .- CO � rb fh a> a> ri oo O w 7-N aS ••- C73 6 10 99+00 9+50 100+00 0+50 101 +00 1+50 102+00 2+50 103+00 3+50 104+00 4+50 105+00 l ci romzv DYYa '? fla TC 0:25-T 20.50 TC • romz- Pius oma 22 21 -O AW 20 20.75 TO F x 21.00 's9 tom -a A, PP N P N 21.25 TC 20.75 FL ao999L9+901. 50 FL 91 CL +00 50 FL 19.75 FL 20.06 CL 19.75 FL N3 IV N N 0r �O m 10 r 2% 2% a r 20.00 FL 0.5% 20.25 FL 20.50 FL -20:98 -FL -0.5v0.5% 2i 2�J TCEOp 2031 CL 0.5% 20.56 CL 20.81 CL 0.5% 20.79 FL EOR i, 21.06 CL 21.10 CL 0.5% to r 0 co m IV IV N N r0 mm 00 .Rr 1$-FL-o.5*0 20.98 FL 21.20CL-2'28CL0.5-4 21.20 CL 0 BEGIN PROJECT PD 2005-13 ZZ x , S9 N ,I^ Y / 0 0 N 0 o a_ ' x 0 STA. 0+35.5 •�� rom zv C A 93 co 21.29 TC EOR 21.19 TC 0 .so 20.94 TC Fernzre D1(1A $303N,ws 20.69 TC 24.62 TC 20.79 FL EOR 20.69 FL 20 21.10 CL 21.000L ofN 20.44 FL 20.75 CL 0 20.19 FL 20.12 FL I 20.50 CL 20.43 CL W U) ez 0 2, 'So 0 20 0 <9 •R� 105+00 20.00 FL RI 0.5% 20.25,FL S. Sewer Main F <9 106+00'is 20.50 FL 0.5% 21 20.75 FL 20.79 FL i<e7g 0.5% 107+o S9 20.98 FL-2113FL0.5/> 20.98 FL 8" Sewer Main gIPIN TAIL AVENUE 20 79 FL 20.69 FL 0 <9 108+020.0'0 0 0 F 20.19 FL 20.12 FL 30 TC 20.25 TC x 0 8" Water Main 20.50 TC 20.75 TC 21.00 TO '- BUILD 6" P.C.C. PAVEMENT 47B Station to Station Side Sq. Yards 105+00 to 108+62.82 LT & RT 1338.0 105+00 to 106+77.55 LT 188.95 107+08.55 to 108+62.82 LT 185.67 SCALES: 1"=20'HOR 1"=2'VER I BUILD 6" P.C.C. INTEGRAL CURB' ------- Station to Station Side Lin. Ft. 105+00 to 108+62.82 RT 362.82 105+00 to 106+77.55 LT 188.95 107+08.55 to 108+62.82 LT 185.67 17 '8 21.25 TO 21.29 TO 21.48 TC 21 63 TC 21.48 TO •W. -r M<in 2129 TO 21.19TC m • 0 S 0 NOTE: 1. Approx. 809 C.Y. o Embankment will be needed for the construction of this project. 6789e.Y. will be derived from the qonstuction of Pin Tail Circle whicj can be used on this project. That leaves a defi i 131 C.Y. that will need to be hauled to the project. The Contractor shall notify the Cr -where the dirt is coming from so that a Proctor curve can be generated for Compaction tst@ ing. 2. The cone section of the manhole at Sta. 106+93.05 is too high. Hastings Utilities will be working to correct this problem before construction. 3. Contractor shall drop curb at intersection for handicap ramps. Location to be determined in field by Engineer. 20.94 TC to 20.69 TO 20.62 TO 401 ADJUST MANHOLE TO GRADE Station Side 106+93.05 CL e /9 6' 7 F <9 'ss 0 20 BUILD CONCRETE HEADER Station to Station Side Lin. Ft. 108+62.82 LT & RT 31.0 F • 72 0 �9 0 <9 OZ x x Fi CITY OF HASTINGS, ENGINEERING DEPT. po Project Jg PIN TAIL AVENUE - W. LOCHLAND ROAD NORTItc829.53' Proj. No PD 2005-12 Des:dpbon Construction Plan Design By R.G.D. Date 312006 Controaw Drown By B.e. Approved ^r.U! Din 3 of 8�_„ 28 26 24 T.$.M. = Fire 'Orarit, $W:Co-.:LochMnd ROI Qsb*rne Pt. WeSt NW onnet Bolt I Elev1=1913.81 VPI• STA •=' 06+93.05 T.B.M.= Fire. Hydrant, .S. Side of.Lochland Rd.. 100' VO est of Pin'Tall Ave. Elev: = 1925:24 VPI• EL•=• 2 2& 1 =0:50% g2 •_• -0:50% CURVE LEN = •0.00 22 t -u 28 26 24 Proposed Gratle 0 w 22 20 18 050% -0 50% 20 a G P 16 .. ; EXisting Grad$ 66 18 16 14 14 12 12 10 to. + w W 2 • w 2 a. e e W a 1n W 2 a. ;ii• ty • a m w W O) Di 6 r N + m N O N o (D CO N Co Co Oi w N N N 0 + 0 Oi G N CO D.- 0 Ci 6 N N + 0 C 6 6 N N N N 6 N co 10 104+00 4+50 105+00 5+50 106+00 6+50 107+00 7+50 108+00 8+50 109+00 9+50 110+00 • mlzo ANN V 0)0 co 1 • PrornHH -' nn3 iW N In n • 11' 11' 10' 10'0 PI N TA IL AVE NUE 10' 10' 10'0 10' 10'0 10' 00 s n 0 1001+00 2' LOC H LAN D ROAD U 1 01 +00 105+ 00 • iv inn PITA H 3 ono o?) A0) 0) PIN TAIL AV ENU E 106+ to n 10'0 00 00 io 10' 102+ 8.8' 00 8.8' 8.8' 8.8' 10' 10' 7.5' 8' 7.5' 0 O in n 0 8' a0 8' 7.5' 8' 107- 103+ 7.5' 10' 00 0 �J BEGIN PROJECT PD 2005-13 STA. 0+35.5 • NRI Z-0 o, U - N co . V W A V 10' 8.56' 8.56' 8.56' 8.56' 10' 10'0 00 Er? 108+00 104+00 in N 10' 105+ 00 NORTHr.> Scale: 1"=20' 20' 0' 20' 40' 60' 14,09S"..4° o Q DAVID L MI WACKER cc) .s. E-5090 ft,: o /I\CITY OF HASTINGS, C \ ENGINEERING DEPT. 00 Project PIN TAIL AVENUE - W. LOCHLAND RD. NORTH 829.53' P Of' N0' PD 2005-12 Description Joint Detail Design By R.G.D.e 3/2006 Contractor Drown By Approved Wail B.B. Din. No. 4 of 8 70 00:::60 00:::50 00 40 00 30 00 20 00 TO 00 10 00 20 00 30 00 40 00 50 00 60 00 70 00 70 00 60 00 50 00 40 00 30 00 20 00 10 00 C 10.00: 20 00 30 00 40 00 : 50 00 60.00 70 00 25 0 25 00 coo co cnco ul 9 LP 't7r t;1 c71 100 o 20 00 100 25 •00 3 ci N In0 • 0 • 32 2500 • 1500 cti cx cc a C LT, 0 t▪ c' C In M. 0. r. kTI• • CE.1 spa =a100 + 32 co LU LID .as -, in E7-.1 1 ORIGIN:AL: EL. =1.9,82 00 hi 150 -cr 0 -I 4-1k 0 11 -4 - min to mm C1w mm to ni O 0>0 .c.J, al ral N In co to a I• CI ci DESI:GN: :EARTHWORK LU LU rci 1F0 FI•LL• AREA- -59..87 S.F. CUT AREA =0..00 STA; -:102 +00 Lii N aCO 4'60 INN VF C.Y. ORIGINAL EL -.20.27 VC =0.00 DESIGN: EARTHWOR FILL: :AR:EA: -.4;24 S.F. CUT AREA -21;47: :SY< VF -18, "61 CS! 95 00 C) 0 00 rc.0 c‘i•C\I -41 60 C.Y. F00 25 no 7500 0-; N 1500 rn WV in • 19.09 L RERCP to .14 0 03 N 7 C C tn - in. c rn • in• 18.92 CticdtIAERCP -0.50% 18 75: FL:RE:R:CR 52.L.F. RERC %D. .r\} • `t;,' 2 Flared End Sections ' tr.; • ei ca. WVA =1:00 +SY • In • in • Da Do • c0 • •cri• •ai • oi • to fg.r..tO.0)• N tri • •.si- poi cri N) 1 vi 0 171 CO. 172 op trs 01 IC) 00 O NN -Jo NP - 0 0 NN ORI:GINAL EL -19.E5 ‘N - cu tal 1500 * C- o . 'A-- g • C * C‘. CO • mi. O 0. -4: •,-: c-C:i d co: N c5 1 1 to L!) oi CD co writ 1ui . 20-00( 1 0 a 1 on ORIGINAL EL -20.:20 U. DESIGN • EARTHWOR n _ AREA =69.26 SF DESIGN:EARTHWORK CUT- AREA =0:00 VF =21 80 C.Y. FELL: AREA =9:23 S.F CUT :AREA: -10.39 S.F. VC - O. 00 VE =177 14- C -Y ye •=12.10 G.Y. 25 on 2500 .40 0 o11) op mo 75 00 :0 0 01 •tr). ' tu 95• DO KIR 0 "- Neu 00 9n no 90 on 0:29 rcki N • ct- O -53.57;22:2D NOVA = 100+ 10;.22 ORIGINAL .71 90 00 100 co to • 0 1500 . LT, Lu FSIGN FARTHWORK FILL AREA: =:0.:00 CUT AREA =0:00 tr) Lu 15 00 N (C -123.:oa,20.56 DO 101 00 0) N)gr SPA -:101: +00 bj •Cx. •CP 1F0 ORIGINAL :EL -20.22 19 00 VF -0:.00 DESIGN:EARTH:WORK FIL_ AREA -29;13: S;FL T: :AR:EA '223 S.F. VC - O. 00 VE =141.62 CY: VC -0.41 C.Y. CO N IC 95 •00 95 00 95 on 7500 0 . -J _j() U_1- 20 00 00 100: •100 Lt, N 0 0 N)U) lFrO0 ca • -,20.46;21:74 SPA --100+00 ORIGI•NA:L:ct7.:14 C .00: 0)10 0).1: .6 s - NN -4; 0101 ci N DFSIGN TI4WOR1< FILL AREA: -0.:00 6 6 (N. < \r tot tyi N-. to 1 0 -- 4 to. 40. cc; 15 00 51,77,20,84 at 0 N N. N) Ui TA =-100+10 N 50 00 60 on 100 CUT AREA =0:00 w:000 ORIGINAL E.L =19:.E4 DESIGN: EARTHWORK LU VC -0 00 IL_ :AREA -48.:39: :S;E, CUT ARL A --(JAM F -69.84 C.Y. 70 00:::60 00 50 00 40 00 .30 00 20 00 • 10.00 10.00:::20 00 30 00 40 00 50 00 60 00 70 00 70 00 60 00 50 00 40 00 30 00 20,00 HO 00 VC - 0:. 00 C 10.00 20 00 30 00 40 00 00 70 15.00 50 00 ACITY OF HASTINGS, ENGINEERING DEPT. 0 0 Project PIN TAIL AVENUE - W. LOCHLAND RD. NORTH 829.53' Proj. No. PD 2005-12 Description Cross Section Plan Design • R.G.D. Dote 2/2006 Controctor n Dy B.B. Afcrc'w4 5nriew Drn. 5 of 8 70 00 • • • 60 00 " • " 50 00 40 00 30 00 • • 20 00 10 00 10 00 • " 20 00 30 00 40 00 • 50 00 . 60 00 • 70 00 70 00 . 60 00 50 00 40 00 30 00 20 00 • 10 00 10 00 20 00 30 00 40 00 • 50 00 • • 60 00 70 00 •IGNAL. ES1GN AREA 16.50 E 104. I SO PigIII 1111111111s AREA .12.95: :AREA 417t S 00 60 00 70 1 0°1:GINAL • 4 ESIGN E RTH:WOR Fl VAREA =8:18SF. i.•AREA 12.48 Project PIN TAIL AVENUE - W. LOCHLAND RD. NORTH 829.53' 70 00 60 00 50 00 40 00 30 00 20 00 '0 00 20 00 30 00 40 00 50 00 60 00 70 00 70 00 60 00 50 00 40 00 30 00 20 00 10 CIY 10 00 20 00 . 30 00 40 00 PD 2005-12 Cross Section Plan Design By Dote R.G.D. 2/2006 Drown By B.B. 70 00 ::: 60 00 ::: 50 00 40 00...30 00:::2000 1000 C 10.00 20 00...30 00 40 00:::50 00 60 00 70 00 70 00:::60 00 50 00 40 00 30 00 20 00 10 00 U 10 00::::20 00...30 00 40 00:::50 00 60 00 70 00 25 00 25 00 tom -LL 0 i F 10, 0)o o 0)a) c4 r Lf? r cp 0 0 O o 0 N N N N N 20 On 50: N N N i5 On a m co C 6) O) t\ • Ck' Ni co 4 W LJ 7000 108 .50 M N a� =:IQR+:fit w W. 1;53;819;19.3$ 15 00 ORIGINAL :EL:=20.05 nn 75. 00 N h 0 on '&1 N N t V 106 DESIGN: EARTH:WORK FILL: :AR:EA: =6;05 . S.F CL T: AREA =6.74. S.F. VF :=76b.98 .C..Y. 15. VC =208 71. C.Y C L< C C w - 0 STA =: LOS +60 ...... . 24129118.84 iv •I. Lu N U) ORI:GINAL =L=19:.E0 W 108 N LL 0)4 0 0 NN 0 In P 0 W o O NN .4 DESIGN: EARTHWORK 00 1L_ AREA 54:32 S:F. 0 7000 108 N N CU.T. AREA 0.:00 VF =512:10- C;Y: 00 a) 15 on eta .4alb- 1500 VC =0:.00 ,f =1,08+00 ORIGINAL. EL =19:5,2 DESIGN: EARTH:WORK 1L_ AREA 22:74 S:F. CIT AREA 1;04:S.F 75 .nn 9900 VF =739.37- C.Y. 6 1- U.. 0 0 0 C! ro N N WF 00 to 0 or N N VC :201..51 C. Y It 15 on a N 9n on 106 00 5 00 95. 00 r o) 14) 15- nn 107 9n no o tU- o rnrn 0 co N NET; 90 00 107 L Flits ago mto4t 50 WU +00 15 nn 0 N N a cr C C C .li N a .50 mCCi on ORI:GI:NAL: EL =19.29 W spa :_tey+1 to 0 a DESIGN EARTHWORK AL- AREA =50:16 S.F ORI:GI:NAL: EL 19:.E0 4 to W CU.T. AREA .0.:00 VF •=415.36" C:Y VC =0:.00 DESIGN: EARTH:WORK HL_: :AREA : -3:5;87: ;F. CUT AREA -:0.:00 VF =685:05 C.Y VC.=0:.00 9:5 nn 990 9 On s : DI V1D: L; :: . c;? W.Y0KER . . 15W0 .. R •219 ....t° \. :. ci J 12- th r- 6 0 0 MN O N J0 LL to Ln N N o N N t0 N N co 5- on N co a' of Cc C.- ce ae 7n- n 1 50: 10:6 J 0 CO M N L m r N J 0 o tL N mm N N N n no :93:.05 M W Sera LOW +Si aS cL 15'00 0 O yei 15- no U) to c N d M to La CRIGINAL. EL: -1:9.:t1 DESIGN: EARTHWORK FL_ AREA =38:1-2-5:F s rl I;-3;22;19. 90 on C 50 G <f M � S9 i s =1061+95.06 ORIGINAL: =L:=19:.",5 DESIGN: EARTH:WORK N W FHL_ AREA 49:58- S:F. CIT AREA=0,18.S.F. CU.T. AREA =0..00 VF 333:62 C.Y. VF =594.93 C.Y: 70 00 ::: 60 00 : : 50 00 40 00 30 VC =201 32C:Y 00 : : 20 00 10.00 C 10.00 20 00 30 00 40 00 : : 50 00 60 00 70 00 70 00 60 00 50 00 40 00 30 00:::20 00 10.00 VC:=0 00 C 10.00 20 00 . .. 30 00 40 00 106 00 60.00 " 70 15:.00 00 M a) CITY OF HASTINGS, ENGINEERING DEPT. 0 0 Project PIN TAIL AVENUE - W. LOCHLAND RD. NORTH 829.53' Proj. No. PD 2005-12 Deacon Cross Section Plan Design By R.G.D. Dote 2/2006 Ccntrocto nay a.s. Approyedlifeew Dm. No. 7 of 8 70 00 • 60 00 " 50 00 40 00 30 00 20 00 ...10 00 C 10 " 20 00 30 00 40 00:::50 00:::60 00...70 00 70 00:::60 00 • • : 50 00 40 00 30 00 20 00 10.00 U 10 00 20 00 30 00 40 00:::50 00 60 00 70 00 95 00 95 00 95 Oft 95 on lii 90 ITO. 1500 0 • C C li STA 11 +00 0,7•IGINAL :ccL C I C 0 N DitSIGN RTH $ORK C- 0 -FILL AREA -0500 CUT AREA -0.00 Li VF -0.00 VC -000 -CB c; U) LU 20 00 4 1500 LU 7a -n -n 15 00 ci U) a inZn LU t N 7;' SPA = 112+00 U) at' ORIGINAL rEL CL:2 C'21‘ .0 SIGN•rn b.J\ IR I HAA/OVR FILL AREA -OM CUT AREA -0.:00 VF =0:0:0 20 00 to 04 0 " 0) ot a) 15 00 1. • ......... VU=(JJJU 95 no -95 on 95 no - .25 on - CII -70 OR 91 2O 90 no- • 1500 rOw").1-0 CR (0.0 Cr 0 NM" •st" 0.2 CO r riter4-1 I I Ea F -Ti* =:100+50 70•00 ORIGINAL IL :=020.Q 4 c.= DESIGN0\IRT4VOR4‹ N trt CO CO. al a FILL AREA • =0.00 'S- CO tr) CU:T AREA' =0.:00 in Cs VF =0.0-0 VC ••••7-4 00 •15 00. 109: \5Q LU 15 00 El- -13.54,20. . . . . . a =1„ ORIGINAL - 9:.E5 DESIGN. EcA ORK FILL ARE/8\111-37,00 CU.T. AREA- -0.:00 VF -0;0:0. ......... ...VC . ......... 20 00 1F00 ......... 95 on - .95 00 95 Oft 95 on wt .....ICr 000 15 00 CO 0.1 CD a -70• on LU 95 M. =-100+00 a•c) ORIGINAL -EL rf,2:0:16 • C c5 3 c731 ° `‘, c`t c\r lo° '-'-' i to° DESIGN ERT WORE: wco id FILL: AREA. 0.:00 fa CUT AREA: 0.:00 00 a) 0) CO Lii VF • = 010.0 VC -G 00 769.24 C.V. x 1 33.CDmp Facto 1023.10ON: 1023.10 ON: FiLL - 214 10 CY CUT 809.0 FILL Needed for •0 Na " 03, Construction -of 'ro -7-15 00 95 00 a) N Lii 0) 7-n {In 15 00 95 00. -4- Writ =:1:11:+00 ci r}-78.20.35 LI 90 00 10 NALL•=1,-9.98 D1SICN EciRTI IWORK EILL. AREA' CUT AREA =0.00 VF VC -0 00 N .36 . U ......... .95. DO asstocca."... 12 : : a Nst4.1 • MVO t • • • 14-'1 • • WACKER • • • •:=E I'4090 •IIf • I I -170 0q_2115 NN (o- dd NN _1 0 11 -1 - NN 861-0 NN a) C) N 4.1 ORIGINAL . 20.07 DESIGN EARTHWORK F'I FILL: AREA -7;68 : S.F. it • Is 150 108:.: •1 1 0 • • 50: • t u ii 3 N N 3.") ') N 05 00 U U) [11 ORIGINAL =2.g. 3 d 5(•• 5N" DESIGN E?\IRTHWOrPf< FILL. AREA• CUT" AREA: -0.:00 VF =,010:0: 70 00 60 00 50 00 40 00 30 00 20 CUT -AREA =15.97- -S F VP -769.24 .C,Y, VC -.21 TO C.•Y 00 10.00 U 10.00: 20 00 30 00 40 0O:::50 00:::60 00 70 00 70 00:::60 00 50, 00 40 00 30 00 20 VC -000 I •I• 110 ......... po 60 00 70 00 LU 00 10.00 U 1O.00::::20 00...30 00 40 00 15.00 CITY OF HASTINGS, ENGINEERING DEPT. 0 Project PIN TAIL AVENUE - W. LOCHLAND RD. NORTH 829.53' Proj. No. PD 2005-12 Description Cross Section Plan Design By R.G.D. Dote 2/2006 Contractor Drown By B.B. "ff',FetA/ Dm. No. 8 of 8