Loading...
HomeMy WebLinkAboutR1996-25" Concrete Base (4 1/2 Sack) FACT SHEET for AV NU 7TH Street To University Street ROJICT R-96(2) 20.3' 25.2' TYPICAL SECTION OF EXISTING STREET Length: 567' at 20.3' wide 158' at 24.0' wide 10.15' 10.15' 3.71% EAST SIDE OF STREET TOP—LIFT: 1 1/2" THICK BOTTOM—LIFT: 1 1/2" THICK 4.02% }14�� tjMl WEST SIDE OF STREET TOP—UFT: 1 1/2" THICK BOTTOM—LIFT: 1 1/2" THICK TYPICAL SECTION OF PROPOSED RESURFACING NOTES 1 Contractor shall use care in maneuvering heavy equipment over and around this project. Existing curb & gutters are in poor condition and the 5" concrete base will not withstand alot of weight. 2. This construction shall include the removal and replacement of returns of two alley approaches and three intersections. 3. Certain areas of this project will require an overlay in gutter lines as directed by Engineer. QUANTITIES ROTOMILL PAVEMENT 1889 S.Y. ASPHALTIC CONCRETE, TYPE -14 396 Ton ASPHALTIC CEMENT (AC -10)@ 5.3% 21 Ton EMULSIFIED ASPHALT (551H) FOR TACK COAT APPLIED 473 Gal. BUILD P.R. CONCRETE PAVEMENT (5") 200 S.Y. BUILD 30" P.C.C. CURB & GUTTER 100 L.F. REMOVE CONCRETE PAVEMENT 200 S.Y. REMOVE 30" CURB & GUTTER 100 L.F. REMOVE PATCHING MATERIAL IN DRIVEWAY APPROACHES 0 ADJUST MANHOLE TO GRADE 1 ADJUST VALVE TO GRADE 1 SAW CUT 175 S.Y. Ea. Ea. L.F. PROJ. MISC. RESURFACING PROJ. NO. R-96(2) DESCRIPTION PINE AVE- 7TH TO UNIVERSITY Hastings City Ebgineerina OSGBN.;Y. DATE 4 /96 CONTRACTOR ORNB.B. BY IAPPRO BY IA58DILTS IORN. ,NO. of �. CO m 15 z � L7 c -et FT9 I, N n 127.8' oo N 0 m 0c.1 109 55' w 0 5 O w 110 551 M oo 111 e 55' 4 m n rc si '114 ,coN N 12 e,\ OC 0 115116 117 N N 55' 55' 55' 55' 55' 60' UT: MTh e art 3 Nell 2 124' t- + 4 • Y • kticisett 124' • • • p m 4) p 05 a IiI 122.6' 100' 100' 100' 100' 0 1 100' 100' 50' 50' o N el O 100' 100' 100' 54O-0 g _ 50 ' C2 50 ' • 3 n1 _ 2 % `-- 100' 1 N 100' N 6 100' 7 100' 8 100' —. __ ..... 9 100' . - g 10 100' b m A" 80' 60' S 5 100' 4 100' 3 100' 3 2 ParK 100'' 1 0 100 . 4 100' 100' 110.1' 100' 1 .w N / 100 j 100 p� � 1000' 07 n 89,05' 2 6 0 Un iversitAve 100' • 117' • • ' 89 �8' • 7 PROPOSED RESURFACING 100' 5 ayno<a St 8 e ge 9 1134.125' 100' 100' 7th St 211.2' 8 100' 100' 2 9 100' 100' 1 10 N 64.7' 64' 60' a 0 • __ 0 100' C ) 80' 170•±V461 rT 7 1 2455.15' 100' 5 100' 4 100' 3 100' 2 100' 1 g 6 100' 100' 100' 100' 10 100' g 100' loos 100' 100' 100' 5 4 j 3 2 1 100' 100' 100' 100' N BC !-F, 100' 10o' no. 6 6 7 0 9 10 100' 100' 100' 100' 100' 1321.895' 80' 60' 0 119 70' 0 N 6 100' b •- 1 2 0 120 68' 121 68' z 122 5A 100' 68' 41 I- 123 dd 100' NN N 100' 4 5 100' 100' 3 100' 2 NN 6 100' 7 100' g 0 m g N 100' 10o' no. 6 l 4 3 j I 2 N BC Iib CONTRACTOR DRN BY BC APPRD BY ASBUILTS DRN NO. 1 o 1 g N RESURFACING IMPROVEMENTS g N 5 6 7 100' 100' 100' 68' 0 N 124 66' 3 100' 80' O N 125 66' 2 100' C L_ 80' 5" Concrete Base (4 1/2 Sack) 4" Asphalt .., ,. 5". 4.37 4.88 20.3' 25.2' TYPICAL SECTION OF EXISTING STREET LENGTH: 725' 1n� 12.65' 12.65' 3.71 4.02 % EAST -SIDE OF STREET TOP -LIFT: 1 1/2" THICK BOTTOM -LIFT: 2 1/2" THICK WEST -SIDE OF STREET TOP -LIFT: 1 1/2" THICK BOTTOM -LIFT: 2 1/2" THICK TYPICAL SECTION OF PROPOSED RESURFACING NOTES 1. Contractor shall use care in maneuvering heavy equipment over and around this project. Existing curb & gutters are in poor condition and the 5" concrete base will not withstand alot of weight. 2. This construction shall include the removal and replacement of returns of two alley approaches and three intersections. 3. This construction shall include asphalt in the gutter line. QUANTITIES ROTOMILL PAVEMENT 1936 S.Y. ASPHALTIC CONCRETE, TYPE -14 324 Ton ASPHALTIC CONCRETE TYPE -17C/.40 214 Ton ASPHALTIC CEMENT (AC -10) 24 Ton EMULSIFIED ASPHALT (SSIH) FOR TACK COAT APPLIED 484 Gal. BUILD CONCRETE PAVEMENT (6") 47B 50 S.Y. BUILD 4" CONCRETE SIDEWALK 50 S.F. BUILD 30" P.C.C. CURB & GUTTER 168 L.F. REMOVE CONCRETE PAVEMENT 50 S.Y. REMOVE 30" CURB & GUTTER 168 L.F. ADJUST MANHOLE TO GRADE 1 Ea. ADJUST WATER VALVE TO GRADE 1 Ea. ADJUST GAS VALVE TO GRADE 1 Ea. SAW CUT 175 , L:F. PROJ. RESURFACING IMPROVEMENTS PROJ. NO. R-96(2) DESCRIPTION PINE AVE. - 7TH ST. TO UNIVERSITY Hastings City Engineering DSGN BY BC DATE 5/97 CONTRACTOR DRN BY BC APPRD BY ASBUILTS DRN NO. 1 o 1