Loading...
HomeMy WebLinkAboutR1996-55" Concrete Base (4 1/2 Sack) 2.59% 3 1/2" Asphalt FACT SHEET for ST. JOS AV 4TH ST. TO 7TH ST. 9ROJ-CT R-96(5; 2.72% 1 1/2" Asphalt 9' i 26.1' 30.1' TYPICAL SECTION OF EXISTING STREET Length: 793' 15.05' 15.05' EAST SIDE OF STREET TOP—LIFT: 1 1/2" THICK (TO FACE OF CURB) BOTTOM—LIFT: 2" THICK WEST SIDE OF STREET TOP—LIFT: 1 1/2" THICK (TO FACE OF CURB) BOTTOM—LIFT: 2" THICK TYPICAL SECTION OF PROPOSED RESURFACING NOTES 1 Contractor shall use care in maneuvering heavy equipment over and around this project. Existing curb & gutters are in poor condition and the 5" concrete base will not withstand alot of weight. 2. This construction shall include the removal and replacement of 4 intersection returns. 3. This construction shall also include the removal and replacement of asphalt in gutter lines. QUANTITIES ROTOMILL PAVEMENT 2991 S.Y. ASPHALTIC CONCRETE, TYPE -14 682 Ton ASPHALTIC CEMENT (AC -10)@ 5.3% 36.2 Ton EMULSIFIED ASPHALT (SSIH) FOR TACK COAT APPLIED 748 Gal. BUILD P.R. CONCRETE PAVEMENT (5") 200 S.Y. BUILD 30" P.C.C. CURB & GUTTER 89 L.F. BUILD 4" P.C.C. SIDEWALK 117 S.F. REMOVE SIDEWALK 117 S.F. REMOVE CONCRETE PAVEMENT 200 S.Y. REMOVE 30" CURB & GUTTER 89 L.F. REMOVE PATCHING MATERIAL IN DRIVEWAY APPROACHES 0 S.Y. ADJUST MANHOLE TO GRADE 2 Ea. ADJUST VALVE TO GRADE 1 Ea. SAW CUT 220 L.F. PROJ. MISC. RESURFACING PROD. No.. R- 96 (5) DESCRIPTION ST. JOE -4TH TO 7TH Hastings City Engineering OSGN BY DATE - B.B. I 4/96 CONTRACTOR ORM BY APPRD BY ASBUILTS IDRN 5 of 5 f1N A13 U30tl038 • VIN80311VO'3NIA81 VINUOdfIVO'3NIAHI U28VJ IN ONIMdao I- I