Loading...
HomeMy WebLinkAboutR1998-1r Hastings Avenue r N L 262' 3" Depth Mill Existing Pavement P.- D" - CD -4- S -t- CD CD -f- 30' N 39' r 1/2"— 1" Depth IoouoS eipp!W N 988.0' 30' 1/2"— 1" Dept — — — C N N 30' 1/2"— 1" Depth � i ( This portion of existing overlay to be, removed by Street Department ro-1 3.2% 1/2"— 3" Existing Asphalt (Varies) s.0% —a---------a---MMI•••••q•SAYlaFln.•.x. S SilliaMINSNEIaINOMNEMMO•MIMI--1a=—___n ® North 3.2% Typical Section of Existing Street No Scale 1 1/4"— 1 1/2" Top Lift (Varies) Brick $ub—bqs@ — 31' 3/4"— 2" Base Lift (varies) 5.0% Typical Section of Proposed Resurfacing No Scale NOTES: Direction of Flowline — — — - N 20' M Hastings Avenue 1283' M f---- 1 1/2"— 2" Depth f ---- 17 I Flowlines are to be covered on Top Lift from 7th to 9th. Depth of Brick sub -base varies from 3" to 1/2". Care must be taken when milling not to mill off base. See drawing for depths. Brick sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Ends and returns on Project will be sawed prior to installation of Base Lift. Mill Existing Pavement Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing curb and gutters are in poor condition and the brick base will not withstand a lot of weight. 3rd to 4th 4th to 7th 7th to 9th Base Lift 2" 3/4" 1 1/2" Top Lift 1 1/2" 1 1/4" 1 1/2" The Existing Asphalt between 4th and 7th is only 1/2"- 1" thick. For this reason, the City Street Department will remove this portion with Front End Loaders. n o S � O 100' ITEM NO. DESCRIPTION 1 2 3 4 5 6 7 NORTH Scale: 1"=100' 0' r Rotomill Pavement Asphaltic Concrete Type 14 Asphaltic Concrete Type 17c/0.40 Asphaltic Cement (AC -10) Emulsified Asph. (SS1H) Tack Coat 100' Build 6" Concrete Pavement (47B) Build 6" Concrete Pavement For Patching(47B High -Early) 8 Build 30" Curb & Gutter 9 Build 4" Concrete Sidewalk (ABX) 10 Build Retaining Wall 11 Build Integral Curb (47B) 12 Remove Concrete Pavement 13 Remove 30" Curb & Gutter 14 Remove Sidewalk 15 Remove Retaining Wall 16 Remove Integral Curb 17 Adjust Manhole to Grade 18 Adjust Gas Valve to Grade 19 Adjust Water Valve to Grade 20 Saw Cut 200' a 300' ESTIMATED QUANTITIES 6195.73 745.0 847.42 90.8 2445.18 68.06 50 142.0 228.45 0 55 118.06 142.0 222.10 0 55 5 1 3 374.0 UNIT S.Y. Ton Ton Ton Gal. S.Y. S.Y. L.F. S.F. L.F. L.F. S.Y. L.F. S.F. L.F. L.F. Each Each Each L.F. ACITY OF HASTINGS, ENGINEERING DEPT. 100 Project R98 Resurfacing Project Proj. No. R-98-1 Description Hastings Ave. = 3rd St. to 9th St. Design By Drawn By Date Contractor B.B. 4/98 B.B. Approved BY oro. No. 2 of 6