Loading...
HomeMy WebLinkAboutR1998-5DOD U n CT) r -l - CD CD •. K 7oi CD CD 0 D U) — • (-J- O C) ES' D 0 (f) co LsN N 50'- 75' Mill Inlay BEGIN PROJECT - - - 50'- 75' U) ch CD CD Cl- eciopia N N 4260 LF NOTES: Mill Inlay Leveling Course will consist of 1" Type 14 Top Lift will consist of 1.5" Type 14 -mat— 50'- 75' 2175 LF END PROJECT 50'- 75' u_ C N Inlays will be milled at each end of project and both sides of 12th St. Various patch areas are to be milled approximately 2" and overlaid prior to Leveling Course. Ends and returns on Project will be sawed prior to installation of Leveling Course. Adjust driveways as directed in field by Engineer. Mill Inlay NORTH Scale: 1"=200' 200' ITEM NO. DESCRIPTION 1 Rotomill Pavement 200' 2 Asphaltic Concrete Type 14 3 Asphaltic Concrete Type 14 for Patching 4 Asphaltic Concrete Type 14 for Driveways 5 Asphaltic Cement (AC -10) 6 Emulsified Asph. (SS1H) Tack Coat 7 Adjust Manhole to Grade 8 Adjust Gas Valve to Grade 9 Adjust Water Valve to Grade 10 Saw Cut 11 Shouldering 400' 600' ESTIMATED QUANTITIES 1252.6 2481.0 95.5 50 148.0 4086.9 1 1 1 88.5 64 UNIT S.Y. Ton Ton Ton Ton Gal. Each Each Each L.F. STA. Mill Inlay A CITY OF HASTINGS, ENGINEERING DEPT. Project R98 Resurfacing Project Proj. No. R-98-5 Description Highldnd Rd. = 2nd to 1/2 Mile North of 12th St. Date Contractor 4/98 Design By B . B . Drown By B.B. Approved By Dm. No. 6 of 6