HomeMy WebLinkAboutR1998-5DOD
U
n
CT)
r -l -
CD
CD
•.
K
7oi
CD CD 0
D U)
— • (-J-
O C) ES'
D
0 (f)
co
LsN
N
50'- 75'
Mill Inlay
BEGIN PROJECT
- - -
50'- 75'
U)
ch
CD
CD
Cl-
eciopia
N
N
4260 LF
NOTES:
Mill Inlay
Leveling Course will consist of 1" Type 14
Top Lift will consist of 1.5" Type 14
-mat— 50'- 75'
2175 LF
END PROJECT
50'- 75'
u_
C
N
Inlays will be milled at each end of project and both sides of 12th St.
Various patch areas are to be milled approximately 2" and overlaid prior to Leveling Course.
Ends and returns on Project will be sawed prior to installation of Leveling Course.
Adjust driveways as directed in field by Engineer.
Mill Inlay
NORTH
Scale: 1"=200'
200'
ITEM NO. DESCRIPTION
1 Rotomill Pavement
200'
2 Asphaltic Concrete
Type 14
3 Asphaltic Concrete
Type 14 for Patching
4 Asphaltic Concrete
Type 14 for Driveways
5 Asphaltic Cement
(AC -10)
6 Emulsified Asph. (SS1H)
Tack Coat
7 Adjust Manhole to Grade
8 Adjust Gas Valve to Grade
9 Adjust Water Valve to Grade
10 Saw Cut
11 Shouldering
400'
600'
ESTIMATED
QUANTITIES
1252.6
2481.0
95.5
50
148.0
4086.9
1
1
1
88.5
64
UNIT
S.Y.
Ton
Ton
Ton
Ton
Gal.
Each
Each
Each
L.F.
STA.
Mill Inlay
A
CITY OF HASTINGS,
ENGINEERING DEPT.
Project
R98 Resurfacing Project
Proj. No.
R-98-5
Description
Highldnd Rd. = 2nd to 1/2 Mile North of 12th St.
Date Contractor
4/98
Design By
B . B .
Drown By
B.B.
Approved By Dm. No.
6 of 6