Loading...
HomeMy WebLinkAboutR1999-3U) 1 CD CD --4- 0 u7 C-) (I) —+- CD CD -4- Chicago Avenue 18' N 810' CO N r6" Existing Asphalt Soil Base 31' Typical Section of Existing Street No Scale Mill 2" of Existing Asphalt, Replace with 2 — 1 1/4" Lifts of Type 17C Typical Section of Proposed Resurfacing No Scale Remove & Replace All 30" Curb and Gutter NOTES: Base Lift will consist of 1 1/4" Type 17c/0.40 Top Lift will consist of 1 1/4" Type 17c/0.40 Contractor shall Rotomill 2" of Existing Asphalt. Existing Asphalt is 6" thick. All Existing 30" Curb & Gutter shall be Removed and Replaced. To be marked in field by Engineer. * Ends and returns on Project will be sawed prior to installation of Base Lift. Portions of every Driveway will need to be removed & replaced for construction of Curb & Gutter. Contractor shall use caution not to damage driveways during the removal of existing pavement. See following sheets for specific details for construction of Chicago Avenue. 50' ITEM NO. DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 NORTH Scale: 1"=50' 0' Rotomill Pavement Asphaltic Concrete Type 14 for Patching 50' Asphaltic Concrete Type 17c/0.40 Asphaltic Concrete Type 17c/0.40 for Driveways Asphaltic Cement (AC -10) Emulsified Asph. (SS1 H) Tack Coat Build 6" Concrete Pavement for Driveways (47B) Build 30" Curb & Gutter Build 4" Concrete Sidewalk(ABX) Remove Pavement Remove Driveway 12 Remove 30" Curb & Gutter 13 Remove Sidewalk 14 Remove 24" Headwall 15 Adjust Manhole to Grade 16 Adjust Gas Valve to Grade 17 Adjust Water Valve to Grade 18 Saw Cut P £moo a a ✓a 1Y"oe r% (SFE$$/�„s'�Os 4 0000IQo, 24, di %:o DAVID L tca— 4 WACKER i=i1 &509U 411;1 4, af" ® 9 eo"' c't4° 9.12-9 eee• o v'� c> 100' 150' ESTIMATED QUANTITIES UNIT 2396.0 S.Y. 75.0 Ton 385.0 Ton 35.0 Ton 29.0 Ton 622.0 Gal. 118.0 S.Y. 1674.0 L.F. 306.0 S.F. 150.0 S.Y. 208.0 S.Y. 1674.0 L.F. 306.0 S.F. 1 Each 1 Each 1 Each 1 Each 250.0 L.F. CITY OF HASTINGS, ENGINEERING DEPT. C, 0 Project R99 Resurfacing Project Proj. No. R-99-3 Description Chicago Ave. — Dote 3/99 APProvadwati Design BY B.B. Drown By B.B. C Street to E Street Contractor Dm. No. 4 of 9 l I 0+00 d) U) +1 0 EL=1924.30 EL=1923.84 EL=1923.97 EL=1924.05 EL=19234 EL=1923.97 1+00 EL=1923.98 EL=1924.32 EL=1924.05 EL=1924.08 EL=1924.03 EL=1923.99 EL=1924.59) EL=1924.01 XEL=1924.95 EL=1924.92 XEL=1925.00 EL=1924.76 XEL=1925.28 to C 0 U EL=1925.24 EL=1925.13 EL=1924.75 EL=1924.72 XEL- 926.33 EL=1924.71 1924 62 EL=1924.5 19?" xEL=1924.55 4 2 Headwall EL=1926.16 2+00 EL=1925.59 EL=1925.18 EL=1924.89 Yy 3 EL=1925.25 EL=1925.38 XEL=1924..4 EL=1924.46 3+00 EL=1925.15 EL=1924.84 EL=1924.63 EL=1925.18 XEL=192554 „EL=1925.12 4+00 X EL=1925.22 EL=1925.17 =19 XEL=1924.69 EL=1924.50 Chicago Ave. EL=1924.77 EL=1925.78 EL=192 3 EL=1925.50 EL=1925.57 EL -1925.52 EL=1925.37 s 8 c 0 6+00 EL=1924.67 XEL=1925.31 EL -1925.69 XEL=1925.67 EL=1925.47 EL=1924.83 EL=1924.93 EL=1925.42 XEL=1925.29 EL=1925.62 EL=1925.52 0 3013L'ki.'Efh EL=1925.58 XEL=1925.62 EL=1925.52 {Sv EL=1924.88 EL=1925.01 EL=1925.06 EL=1924.95 EL -1925. XEL=1925.71 EL -1925.49 EL=1925.20 E 7+00 0 a XEL=1926.01 =1925.98 EL=1924.5 Pole EL=1925.04 XEL=1925.79 m I a X EL -1924.88 EL=1924.56 \ o EL=1925.16 EL=1925.30 EL -1925.05 EL=1925.59 EL -1925.50 XEL=1925.51 cY 8+00 XEL=1925.97 EL=1926.19 EL=1924.6 EL=1925.17 EL=1925.37 L=1925.46 XEL=1925.02 EL=1924.77 EL=1925.38 EL4925.39 EL=1925.52 EL=1925.22 EL -1925.59 EL -1925.17 EL=1925.02XEL=1924.99 g (3 EL=1925.64 =1925.58 EL=1926.08 EL=1925.7b� EL=1925) EL=1925.84 EL=1926.09 2 0 0 EL=19 EL=1925.97 EL=1925.98 EL=1926.11 EL=1926. EL=1925.77 XEL=1926. 9 EL=1925.77 EL=1925 58L=1925.67 EL=1925.80 EL=192'.75 EL=1926.27 L=1'26.41 0 =1926.08 =1926.15 L=1926.25 L=1926.47 EL=1927.27 EL=1926.19 EL=1926.21 n N Q EXISTING GRADES EL=1926.14 EL=1926.65 w EL=1927.13 Pole 5+00 XEL=1924.95 EL=1924.92 L=1924.56 EL=1925:35 EL=1925.32 EL=1925.13 EL=1925 25 EL=1924.88 EL=1924.95 c 0 EL=1925.00 EL=1924.73 EL=1 EL=1925.20 2 U EL=1924.73 EL=1925.33 XEL=1925.28 EL=1925.13 ,. CITY OF HASTINGS, ENGINEERING DEPT. Project R99 Resurfacing Project Proj. No. R-99-3 Description Chicago Des* By B.B. Drown By B.B. Ave. - C Date 3/99 ApprovedBy Street to E Street Contractor Dm. No. 5 of g r 0+00 EL=1924.30 EL=1923.84 EL=1923.97 EL=1924.05 EL=1923 94 EL=1923.97 a) 0 L 4r U� b cC co O t vs G CC M C Q m -, EL=1923.98 EL=1924.32 1+00 0 a U C O U } co rn co m E c EL=1925.24 ¢ EL=1925.13 EL=1924.75 EL=1924.72 XLL=;,3 Remove 17 L.F. 24" Headwall 2 ^ EL=1924.55 2+00 3+00 m Y Q O 3 0/) 0) N 0) } ai O O co 17> co> cc c O EL=1925.59 EL=1925.25 C / EL=1925.38 Ir 92 Headwall EL=1925.15 EL=15.18 =12:1.12 5 X £v-1924.69 1924.50 Chicago Ave. 4+00 Li= 925.22 i XEt =+92 x.02 Pole 5+00 Xri..=192495 „EL' -i924..92 / /cL=1924.56 XEL -1925.00 EL=1924.05 EL=1924.08 EL=1924.03 EL=1923.99 EL=1924.59' EL=1924.01 X; i_?1924 95 =1924.92^ EL=1925.781"" 1925.69 Remove 15 S.Y. Conc. Drive 6+00 :s =1925.31EL-1925.50 cL,..1925 ''/�L=1925.C5 EL=1925.42 61=1925.49 EL=1925.20 xE1=1925.71 EL -1925.53 EL=1925.53 7+00 0 d C 0 U } U) Cm N E ow cc LL X c t_=1926:0?. v..=1925.98 -.yrO 925.16 EL=1925.04 EL -1925.05 EL=1925.59 Remove 8.1 S.Y. Asphalt Drive Remove 6.8 S.Y. Conc. Drive 8+00 )<E11.,.1925.97 „EL= 1926.19 Remove 103.0 S.F. Sidewalk EL=1925.17 Remove 7.8 S.Y. Asphalt Drive EL -1925.17 ;:EL=19.25.00 X EL=1925.28 Remove 13.4 S.F. Sidewalk EL 925.29 EL -1925.52 EL=1925.57 EL=1925.37 Remove 7.0 S.Y. Conc. Drive Remove 18.4 S.F. Sidewalk L=Ib25.7 X ELS=1925.62 EL=1925.52 EL=1925.52 Remove 7.0 S.Y. Conc. Drive ^ E?_=1925.7 9 al» (ov Remove 16.4 S.F. Sidewalk EL=1926.09 Remove 21.6 S.Y. Conc. Drive EL=1926.11 Remove 30.2 S.F. Sidewalk EL=1926.19 EL=1926.21 a t a Q } to CV c Remove 11.1 S.F. Sidewalk REMOVAL PLANS Remove 50.0 S.F. Sidewalk '•',' EL . EL=1924959 EL=1925.02X c;_=; 925.19252 .92 4. D Remove 5.6 S.Y. Conc. Drive V. Air EL=192513 EL=1925.25 EL=1924.88 EL=1924.95 //» Remove 5.2 S.Y. Conc. Drive Removal Remove 12.0 S.F. Sidewalk '•�/>EL -1925.28 EL=1925.13 ..=1924.73 1=1925.33 EL=1925.20 Remove 9.0 S.Y. Conc. Drive C00000"O c ESS/047,43 �e 0�gt41it cpOq.e0a00e.04,69 OOse Oo✓ e 4t``m a 77 a1 : to DAVID L to -,1 :e 8 WACKER a: T.`0 E•5090 '"'i a • Apr ��m� l i ,.CITY OF HASTINGS, ENGINEERING DEPT. /710 Project R99 Resurfacing Project Proj. No. R-99-3 Description Chicago Ave. - C Street to E Street Design By Dote Contractor B.B. 3/99 Drown By B.B. 2161(1A/ Oro. No. 6 of 9 0' r 1/4 0+00 4-. a) N C.) 25.51 TO 4- W rn C7 off -2 J EL=1924.30; EL=1923.84 C) tet• O to M a)+, C o a)- CO co EL=1923.97 EL=1924.05 EL=1923.94 24.61 TC 1 24.11 FL 1+00 0 U C 0 U a EL=1925.24 EL=1925.13 EL=1924.75 EL=1924.72 XE! X92 =,33 24.71 TO 24.81 TO Build 51.0 S.F. Sidewalk 2+00 EL=1925.59 Build 6.3 S.Y. Conc. Drive Build 23.5 S.Y. Asphalt Drive EL=1925.25 3+00 Build 8.3 S.Y. Asphalt Drive EL=1925.18 X;L=:92.`4 4+00 25.21 TO 25.31 TC XEL 25.22 5+00 Pole 25.41 TO 0 25.51 TO XEL.=192 ..95 1923.97 Exist. EL=1923.98 M 1924.08 Exist. 24.11 FL 24.21 FL 24.21 FL 24.31 FL 24.31 FL 24.41 FL 24.41 FL 24.51 FL 24.61 FL +0.20% I t 24.51 FL Chicago Ave. 24.71 FL 24.81 FL I 24 61 FL 24 71 FL 24.81 FL 24.91 FL 25.01 FL 24.91 FL 25.01 FL EL=1924.05 24.61 TC EL=1924.03 EL=1923.99 EL=1924.59' EL=1924.01 24.7 XEL=19125.31 EL=1925.78 EL -1925.69 Build 15 S.Y. Conc. Drive 6+00 XE.L=I9rp4:9`; XE .=1925.61 24.81 C EL=1924.3 EL=1925.42 ririr a o EL=1925.53EL-1925.53 EL -1925.49 EL=1925.20 EL -1925. XEL=:925. 71 a C) O U z N u5 a a .% mw Build 24.6 S.Y. Conc. Drive 7+00 XE! _1926.01 25.01 T 2 . 1 TC 25.21 T EL=1925.04 EL -1925.05 EL=1925.59 EL -1925.50 XEL _1925 51 25.91 TC Pole 26.01 TO Build 8.1 S.Y. Asphalt Drive Build 6.8 S.Y. Conc. Drive 8+00 26.11 TO XEL c:1925.97 Build 103.0 S.F. Sidewalk EL=1925.17 Build 7.8 S.Y. Asphalt Drive EL=1925.37 1925.37 e0 Exist. 26.19 TC 25.01 FL 25.11 FL 25.01 FL 511 FI 25.21 FL +0.20% 25.31 FL 25 21 FL 25.31 FL 25.41 FL 25 51 FL 25.41 FL 2551 FL 25.61 FL 25.69 FL 25.31 \[O `C EL=1925.52 EL=1924.99 EL=1925.13 EL=1925.17EL=1925.25 - EL=1925.02X =1,2522 EL=1924.88 EL=1924.95 EL=1925.20 25 61 FL 25.69 FL 25.51 TO XEL 925.28 Build 13.4 S.F. Sidewalk EL=19246 /EL -1925.52 EL=1925.57 EL=1925.37 Build 7.0 S.Y. Conc. Drive Build 18.4 S.F. Sidewalk 25.971 7C XEL=3925.62 EL=1925.52 EL=1925.52 Build 7.0 S.Y. Conc. Drive Build 16.4 S.F. Sidewalk EL=1926.09 Build 21.6 S.Y. Conc. Drive EL=1926.11 -I 25.91 TC '- XEt.=1926,1�9 Build 30.2 S.F. Sidewalk EL=1926.27 01 TC • EL=192'.75 EL=1926.19 EL=1926.21 Build 42.2 S.Y. Asphalt Drive Build 11.1 S.F. Sidewalk PROPOSED GRADES 26.11 TC i3ls L =1327,37 26.19 T Build 50.0 S.F. Sidewalk ?s 1926.47 Exist. Build 5.6 S.Y. Conc. Drive Build 5.2 S.Y. Conc. Drive Build 12.0 S.F. Sidewalk Build 9.0 S.Y. Conc. Drive ^EL=19225.28 EL=1925.13 NOTE: Headwall will not be rebuilt. Ground will be graded to fit street. Street is to be overlayed with 2 1/2" of Type 17c Asphalt in two lifts. Top Lift will match into new 30" Curb & Gutter. Irr ,. CITY OF HASTINGS, ENGINEERING DEPT. Project R99 Resurfacing Project Proj. No. R-99-3 °eCipti°n Chicago Ave. - C Street to E Street Design By Dote Contractor B.B. 3/99 Drown By B.B. M ea Dm. No. 7 of 9 J