Loading...
HomeMy WebLinkAboutR2001-2C:\AutoCAD R14\2001 resurfacing.dwg Wed May 23 10:56:06 2001 r �V P n Ave® ver ay Cu Cu 487,52 2" Existing Asphalt / Remove 26'-0' i.--- Dirt Subgrade f 2" Top Lift Typical Section of Existing Street Boston Ave. No Scale 4" Base Lift 26'-0' Proposed Section Boston Ave. No Scale rDirt Subgrade I U N ESTIMATED • TY. FOR BOSTON AVE. ITEM NO. DESCRIPTION 1 Rotomill Pavement 2 Asphaltic Concrete Type 14 3 4 5 Asphaltic Concrete Type 17c/.40 Asphaltic Cement (AC -10) Emulsified Mph. (SS1H) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter 11 Build 30" curb & gutter 12 Asphalt Driveway patching 17c/.40 13 Excavation ESTIMATED QUANTI I'ILS 2271 558 279 50 296 104 200 200 10 252 299.00 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. Ton C.Y. Cu p Ui NOTES: C SOS Base Lift will consist of 4" Type 14 Top Lift will consist of 2" Type 17c/.40 50' I on NORTH Scale: 1"=50' 0' 50' 100' 150' veo * Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Contractor will lay asphalt up to the existing new asphalt on B and C street. Millings to be hauled to city landfill to be stockpiled. Approximately 252 Cubic Yards of excavation will be derived from the construction of this project. Excess excavation shall be property of the City of Hastings. A haul site shall be determined by the engineer. Asphalt shall not cover flow lines on both sides. Extra care will be taken to maintain water flow. Contrator is responsible to place Asphalt inset into driveways where needed. ecoc E SS/oN,, • ic,e ;tee :rrT 1 ACITY OF HASTINGS, ENGINEERING DEPT. 0 Project Boston Ave. B to D St. Proj. No. R — 2000 — 2 Description Asphalt Overlay Design Jeff L. Date 5/01 Contractor Drown By Jeff L. 4pr'v'a gy.� Drn. No. 1 of