Loading...
HomeMy WebLinkAboutR2001-3C:\AutoCAD R14\2001 resurfacing,dwg Wed May 23 10:54:05 2001 r 506.00 4" Existing Asphalt / Remove Concrete Subgrode • 26'-0' 1 1/2" Top Uft 2 1/2" Base Lift Typical Section of Existing Street New York Ave. "B" to "C" No Scale Concrete Subgrade Proposed Section New York Ave. "B" to "C" No Scale 3" Existing Asphalt / Remove Z 26'-0' rDirt Subgrade f Typical Section of Existing Street New York Ave. "C" to "D" No Scale 2" Top Lift 4" Base Lift 26'-0' rDirt Subgrade Proposed Section New York Ave. "C" to "D" No Scale ew kAve® OverDay F- 2 �N HEM NO. 1 2 3 4 5 U E— 3 r w 299.00 CU ZD N ESTIMATED QTY. FOR NEW YORK AVE. DESCRIPTION Rotomill Pavement Asphaltic Concrete Type 14 Asphaltic Concrete Type 17c/.40 Asphaltic Cement (AC -10) Emulsified Asph. (SS 1 H) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter 11 Build 30" curb & gutter 12 Concrete Patching (High Early) 13 Asphalt Driveway Patching 17c/.40 14 Excavation ESTIMATED QUANTITIES 2407 512 270 46 426 1 1 104 150 150 150 10 122 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. S.Y. Ton C.Y. p in F— < 0 W z 50' NORTH Scale: 1"=50' 0' 50' New York AN NOTES: 100' 150' Base Lift will consist of 2 1/2" Type 14 from B to C st. and (4" Type 14 from C to D st.) Top Lift will consist of 1 1/2" Type 17c/.40 from B to C st. and (2" Typel7c/.40 from C to D st.) Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. * Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Contractor will lay asphalt up to the existing new asphalt at C and B street. Millings to be hauled to city landfill to be stockpiled Asphalt shall not cover flow lines in gutter on both sides. Extra care will be taken to maintain water flow. Approximately 122 Cubic Yards of excavation will be derived from the construction of this project. Excess excavation shall be property of the City of Hastings. A haul site shall be determined by the engineer. Contractor is resposible to place asphalt insets into driveways where needed. ,,,,,,,,,N,,,, �oQpFESS/p`l :�-: DAVID L :o; 52: WACKER ; z : co:• • n,: • fT s zs-dw 0se %.4tF.,w...enas, A CITY OF HASTINGS, ,�+�, ENGINEERING DEPT. U Project New York Ave. B st. to D st. Proj. No. R - 2001 - 3 Description Asphalt Overlay Design BY Jeff L. Date 5/01 contractor Drown By Jeff L. '*prove' ey Din. No. 1 of 1 2