Loading...
HomeMy WebLinkAboutR2001-5C:\AutoCAD R14\2001 resurfacing.dwg Tue May 22 10:23:13 2001 7 seph Ave® ver 1 r 4th Street ay s Adams County Courthouse Grate Met r H -*- 4) 4) L -r-- UD c0 Grate Met r ,— I I} ii i 1 3A00 -1 4 1/2" to 5" Existing Asphalt / Remove Concrete Subgrode L VAIRES Typical Section of Existing Streets St. JOSEPH Ave. "1st." to "7th." No Scale 2" Top Lift VARIES Concrete Subgrode S Proposed Section St. JOSEPH Ave. "1st." to "7th." No Scale ITEM NO. 1 2 3 4 1236.00 8 100' ESTIMATED II TY. FOR St. JOSEPH AVE. 1st. to 7th. DESCRIPTION Rotomill Pavement Asphaltic Concrete Type 14 Asphaltic Concrete Type 17c/.40 Asphaltic Cement (AC -10) 5 Emulsified Asph. (SS1H) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter 11 Build 30" curb & gutter 12 Concrete Patching (High Early) 13 Asphalt Driveway Patching 17c/.40 ESTIMATED QUANTITIES 8050 1500 1010 146 2010 3 9 8 510 210 210 250 10 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. S.Y. Ton J St Joe Avenue NORTH Scale: 1"=100' 0' 1,00' 200' NOTES: Base Lift will consist of 3" Type 14 Top Lift will consist of 2" Type 17c/.40 Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. * Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Contractor will lay asphalt up to the existing concrete on 2nd and 3rd. street. Millings to be hauled to city landfill to be stockpiled. Top Lift of Asphalt shall cover flow lines in the gutter on both sides unless specified otherwise. Extra care will be taken to maintian water flow. Contractor is resposible to place Asphalt inset into driveways where needed. Contractor shall use care when moving heavy equipment over and around this project the sub -base will not withstand heavy weight. 300' QRp" "cc i t i�e• "• -1 • DAVID L : c_ -cn• • WACKER Wiz: :cat :rn: ESN° e'ie tT • ••••eee•O ',,TF QF CITY OF HASTINGS, ENGINEERING DEPT. Project St. Joseph Ave. 1st. to 7th. P'"`' R — 2001 —5 Description Asphalt Overlay Dow &/ Jeff L. Date 5/01 Drown En. Agwoved Jeff L. k ..ke4,/ Contractor Dm. No. 1 of 1 2