Loading...
HomeMy WebLinkAboutR2001-6i May 22 09: 42: 12 2001 C:AALtaCAD R14\2001 resurfacin 0) n yTh oh ,nvoa Ov/or 30.00 J 70.00 30.00 3 1/2" to 4" Existing Asphalt / Remove Concrete Subgrade 682.00 1/2" Top Lift 2 1/2' Base Lift Typical Section of Existing Streets St. JOSEPH Ave. "9th." to "12th." No Scale Concrete Subgrade 30' Proposed Section St. JOSEPH Ave. "9th." to "12th." No Scale n H 7Th l 0 0 CO 2trr St Joe Avenue ESTIMATED QTY. FOR St. JOSEPH AVE. 9th. to 12th. ITEM NO. DESCRIPTION 1 Rotomill Pavement 2 Asphaltic Concrete Type 14 3 Asphaltic Concrete Type 17c1.40 4 Asphaltic Cement (AC -10) 5 Emulsified Asph. (SSIH) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter 11 Build 30" curb & gutter 12 Concrete Patching (High Fatly) 13 Asphalt Driveway Patching 17c1.40 ESTIMATED QUANTI 17ES 4100 630 380 60 1025 1 1 1 200 100 100 150 10 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. S.Y. Ton 506.00 50' NORTH Seale: 1"=50' u' 50' i00' 2 NOTES: Base Lift will consist of 2 1/2" Type 14 Top Lift will consist of 1 1/2" Type 17c 1.40 Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. * Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Contractor will lay asphalt up to the existing new asphalt on 9th. , 1 lth. and 12th. Millings to be hauled to city landfill .to be stockpiled. Top Lift of Asphalt shall cover flow lines in the gutter on both sides unless specified otherwise. Extra care will be taken to maintain water flow. Contractor is resposible to place Asphalt inset into driveways where needed. Contractor shall mill down to the concrete sub -base. Contractor shall use extra care when moving heavy equipment over and around this project the concrete base will not withstand heavy weight. QApFE ooT0/010.9p,, ,vee �0aoe000000e% r�Oo� A s„14. . W . DAVID L ' 1t WACKER :zz E•5090 -• tic -0/ .1 V k.... BF1NF-GZ� CITY OF HASTINGS, �+�'1 ENGINEERING DEPT. t" 0 Project St. Joseph Ave. 9th. to 12th. Proj. R — 2001 — 6 aem;pson 1 Design By 8y Drown Jeff L. Asph Overlay Jeff L. Date 5/01 Contractor ea No Of 1