HomeMy WebLinkAboutR2002-20
0
0
So -
CO
seph Ave® verHay
-i—
q)
q)
L
�-4—
(n
d
0
30.00
2
70.00
30.00-
3
0.00-
3 1/2" to 4" Existing Aspholt / Remove
Concrete Subgrode
682.00
30'
Typical Section of Existing Streets
St. JOSEPH Ave. "9th." to "12th."
No Scale
1 1/2" Top Lift
2 1/2" Bose Lift
Concrete Subgrode
30'
Proposed Section
St. JOSEPH Ave. "9th." to "12th."
No Scale
ITEM NO.
1
2
3
O
t
0
0
0
co
12
h.
St Joe Avenue
ESTIMATED QTY. FOR St. JOSEPH AVE. 9th. to 12th.
DESCRIPTION
Rotomill Pavement
Asphaltic Concrete
Type 14
Asphaltic Concrete
Type 17c/.40
4 Asphaltic Cement
(PG44-2Z)'
Emulsified Asph. (SS1H)
Tack Coat
Adjust Manhole to Grade
Adjust Gas Valve to Grade
Adjust Water Valve to Grade
Saw Cut
5
6
7
8
9
10
11
12
13
Remove 30" curb & gutter
Build 30" curb & gutter
Concrete Patching (High Early)
Asphalt Driveway Patching 17c/.40
ESTIMATED
QUANTr1'ihS
4100
630
380
60
1025
1
1
1
200
100
100
150
10
UNIT
S.Y.
Ton
Ton
Ton
Gal.
Each
Each
Each
L.F.
L.F.
L.F.
S.Y.
Ton
506.00
50'
NORTH
Seale: 1"=50'
0'
5,0'
100'
Q
2co
cc r
Lti
Z�
NOTES:
Base Lift will consist of 2 1/2" Type 14
Top Lift will consist of 1 1/2" Type 17c /.40
Asphalt sub -base may require various patching to be determined by Engineer
after milling operation and street has been cleaned.
* Ends and returns on Project will be sawed prior to installation of Base Lift.
Contractor shall use caution not to damage driveways during the removal of existing asphalt.
Contractor will lay asphalt up to the existing new asphalt on 9th. , 1 lth. and 12th.
Millings to be hauled to city landfill to be stockpiled.
Top Lift of Asphalt shall cover flow lines in the gutter on both sides
unless specified otherwise.
Extra care will be taken to maintain water flow.
Contractor is resposible to place Asphalt inset into driveways where needed.
Contractor shall mill down to the concrete sub -base.
Contractor shall use extra care when moving heavy equipment
over and around this project the concrete base will not withstand heavy weight.
150'
CITY OF HASTINGS,
ENGINEERING DEPT.
Project
St. Joseph Ave. 9th. to
12th.
Proj. No.
Description
Design By
Jeff L.
Drawn By Jeff L.
R-2002-2
Asphalt Overlay
Dote 1 /02 contractor
APPro`�
Dm. No.
3
of 4 9