Loading...
HomeMy WebLinkAboutR2002-3ilr4r- 3" Existing Asphalt / Remove se L 4) c a) 0 28' a" 1 e 6th Street N p E) 1 / 1 1 30' Concrete Subgrade 975' 29' • Typical Section of Existing Streets 6th. St. Hastings Ave. to St. Joe Ave. No Scale 1 1/2" Top Lift 1 1/2" Bose lift Concrete Subgrode 29' Proposed Section 6th. St. Hastings Ave. to St. Joe Ave. No Scale 5" Existing Asphalt / Remove S Concrete Subgrade -J 1 2" Top Lift 29' f Typical Section of Existing Streets 6th. St. St. Joe Ave. to Kansas Ave. No Scale 3" Base Lift 29' Proposed Section 6th. St. St. Joe Ave. to Kansas Ave. No Scale Concrete Subgrade f ESTIMATED QTY. FOR 6th. St. HASTINGS AVE. to KANSAS AVE. ITEM NO. DESCRIPTION 1 Rotomill Pavement 2 Asphaltic Concrete Type 14 3 Asphaltic Concrete Type 17c/.40 4 Asphaltic Cement (PG64-22) 5 Emulsified Asph. (SS1H) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter (47B) 11 Build 30" curb & gutter (47B) 12 Concrete Patching (High Early) 13 Asphalt Driveway Patching 17c/.40 14 Remove Concrete Pavement Build 6" P.C.C.Pavement (47B) Remove Sidewalk 15 16 17 Build 4" Sidewalk (ABX) ESTIMATED QUANTITIES 3465 470 380 50 870 4 6 2 510 175 350 100 10 110 110 250 250 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. S.Y. Ton S.Y. S.Y. S.F. S.F. NOTES: 30' Scale: 1"=30' 0' Adf)A. NORTH 30' 60' 90' Base Lift will consist of 3" Type 14 (from St. Joe to Kansas) Top Lift will consist of 2" Type 17c/.40 (from St. Joe to Kansas) Base Lift will consist of 1 1/2" Type 14 (from Hastings to St. Joe) Top Lift will consist of 1 1/2" Type 17c/.40 (from Hastings to St. Joe) Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. " Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Millings to be hauled to city landfill to be stockpiled. Top Lift of Asphalt shall cover flow lines in the gutter on both sides unless specified otherwise. Extra care will be taken to maintian water flow. Contractor is resposible to place Asphalt inset into driveways where needed. Contractor shall use care when moving heavy equipment over and around this project the sub -base will not withstand heavy weight. p,a,eu.,e$$ °,.Q at>+oss. ,,. ® ewc^� Lam o o�- ° DAVID L I;r?S WACKB1 S E-5090it�y • Seo,' �q • , f° 8.-M° %. Project CITY OF HASTINGS, ENGINEERING DEPT. Resurfacing Project Proj. No. R-2002-3 Description 6th. St Hastings Ave. to Kansas Ave. Design By Jeff Drown By Jeff L. L. Date Contractor 4/1/02 Mprovedl�� Dm. No. 3 of 3