Loading...
HomeMy WebLinkAboutR2002-4w L, 73 c J 0 FINISH 1 astings Senor Hig 1 Scnoo 900.00' STT 4th Street 1 1 1/2" Existing Asphalt / Remove Concrete Subgrode 1 1/2" Top Lift 3/4" Base Lift (leveling coarse) .i:,'•s:• 31' Typical Section of Existing Streets 14th. St. West Bound Lane No Scale 31' Z. Concrete Subgrode Proposed Section 14th. St. West Bound Lane No Scale J r J 31 00' C f ESTIMATED QTY. FOR 14th St. ESTIMATED ITEM NO. DESCRIPTION QUANTITIES 1 Rotomill Pavement 3100 2 Asphaltic Concrete 430 Type C 3 Asphaltic Cement 25 (PG64-22) 4 Emulsified Asph. (SS1 H) 775 Tack Coat 5 Adjust Manhole to Grade 0 6 Adjust Gas Valve to Grade 0 7 Adjust Water Valve to Grade 0 8 Saw Cut 162 9 Remove 30" curb & gutter 120 10 Build 30" curb & gutter 120 11 Concrete Patching (High Early) 50 12 Asphalt Driveway Patching 17c/.40 10 UNIT S.Y. Ton Ton Gal. Each Each Each L. F. L.F. L.F. S.Y. Ton NOTES: NORTH Scale: 50' 0' 50' 100' 150' 1 , 1 Base Lift will consist of 3/4" Type C Top Lift will consist of 1 1/2" Type C Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. " Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Millings to be hauled to city landfill to be stockpiled. Top Lift of Asphalt shall cover flow lines in the gutter on both sides unless specified otherwise. Extra care will be taken to maintain water flow. Contractor is responsible to place Asphalt inset into driveways where needed. Contractor shall use care when moving heavy equipment over and around this project the sub -base will not withstand heavy weight. fixCITY OF HASTINGS, ENGINEERING DEPT. 0 0 Project Resurfacing Project Proj. No. R-2002-4 De`6"1°" 14th. Design By Drawn By St. Saunders 900' East Jeff L. Jeff L. Date Contractor 4/1/02 Dm. No. 3 of 3 2