Loading...
HomeMy WebLinkAboutR2003-23 Bellevue Ave. 1 W 1 ( J 36' 4" Existing Asphalt / Remove Dirt Subgrade o I� 1191 ll t� 1 �t1 =Il — —11=11 I-II 1 I �t-t llI1 11tt 1 II I I1=1I =1=1I j I 11,=111=1I I1 I ll„I,IIHBEI 11fII5tu,t» t” 30" 3" Top Lift 36' Typical Section of Existing Streets No Scale 3" Bose Lift Dirt Subgrode —1111 II -u -u - IIIIII 111 Ill II-11—II-11-11—I/-11-11-11 a—u—cru ..— 1 I I 1-111-111—n 1 11—I1 11-111-11-111-1(-- 11-111 - 111—IT1-- 111-111-11 11-111-111-11 11-11-11 l 1-111-111 11 11— I 11-11-111-111-11-11-111I I I rT=1I l-1 — 36' Proposed Section No Scale 11 11 1265' 36' ESTIMATED QTY. for BELLVUE AVE. - 12th. St. to 14th. St. ITEM NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DESCRIPTION Rotomill Pavement Asphaltic Concrete Type 14 Asphaltic Cement (PG64-22) Emulsified Asph. (SS1 H) Tack Coat Adjust Manhole to Grade Adjust Gas Valve to Grade Adjust Water Valve to Grade Saw Cut Remove 30" curb & gutter (47B) Build 30" curb & gutter (47B) Asphalt Driveway Patching 17c/.40 Remove Sidewalk Build 5" Sidewalk (ABX) Remove Concrete Pavement Build 6" P.C.C.Pavement (47B) ESTIMATED QUANTITIES 4357 1610 94 1090 3 0 - 7 117 500 500 15 572 572 320 320 UNIT S.Y. Ton Ton Gal. Each Each Each L.F. L.F. L.F. Ton S.F. S.F. S.Y. S.Y. 36' NOTES NORTH No Scale = DO NOT REMOVE = PLACE NEW CONCRETE Base Lift will consist of 3" Type 14 Top Lift will consist of 3" Type 14 Flow line on this project WILL NOT be covered. Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Millings to be hauled to city landfill to be stockpiled. Extra care will be taken to maintain water flow. Contractor is responsible to place Asphalt inset into driveways where needed. Contractor shall use care when moving heavy equipment over and around this project the sub -base will not withstand heavy weight. Contractor is responsible to repair all sprinkler heads or pipe damaged by work being done on project. ACITY OF HASTINGS, ENGINEERING DEPT. C 0 Project Bellevue 12th. to 14th. Proj. No. Description Design Sy Jeff L. Drawn ByJeff L. R-2003--2 Dote 4/1/03 N''/ APP BYtl Contractor Dm. No. 3 of 3 J