Loading...
HomeMy WebLinkAboutR2003-3ase 3" Existing Aspholt / Remove 30" 30' a) fn 0) c 0 Concrete Subgrode 582' 28' M 0" L 7 r Typical Section of Existing Streets 6th. St. - Hastings Ave. to St. Joe Ave. No Scale 1 1/2" Top Lift 7.--- 1 1/2" Base Lift Concrete Subgrade L. 6 30' Proposed Section 6th. St. - Hastings Ave. to St. Joe Ave. No Scale r 5" Existing Asphalt / Remove Concrete Subgrode 3 p 2" Top Lift [r 30' Typical Section of Existing Streets 6th. St. - St. Joe Ave. to Kansas Ave. No Scale 3" Base Lift Concrete Subgrode 30' Proposed Section 6th. St. - St. Joe Ave. to Kansas Ave. No Scale 3t 0 —4— fn 6th Street 363' ESTIMATED QTY. for 6th. St.- HASTINGS AVE. to KANSAS AVE. ITEM NO. DESCRIPTION 1 Rotomill Pavement 2 Asphaltic Concrete Type 14 3 4 Asphaltic Concrete Type 17c/.40 Asphaltic Cement (PG64-22) 5 Emulsified Asph. (SS1 H) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter (47B) 11 Build 30" curb & gutter (47B) 12 Concrete Patching (High Early) Asphalt Driveway Patching 17c/.40 Remove Concrete Pavement 13 14 15 16 17 Build 6" P.C.C.Pavement (47B) Remove Sidewalk Build 5" Sidewalk (ABX) ESTIMATED QUANTITIES 3244 438 360 46 811 3 3 1 180 350 350 100 15 110 110 250 250 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. S.Y. Ton S.Y. S.Y. S.F. S.F. a) > u, 0 0 NOTES: NORTH Scale: none Base Lift will consist of 3" Type 14 (from St. Joe to Kansas) Top Lift will consist of 2" Type 17c/.40 (from St. Joe to Kansas) Base Lift will consist of 1 1/2" Type 14 (from Hastings to St. Joe) Top Lift will consist of 1 1/2" Type 17c/.40 (from Hastings to St. Joe) Concrete sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Millings to be hauled to city landfill to be stockpiled. Top Lift of Asphalt shall cover flow lines in the gutter on both sides unless specified otherwise. Extra care will be taken to maintain water flow. Contractor is responsible to place Asphalt inset into driveways where needed. Contractor shall use care when moving heavy equipment over and around this project the sub -base will not withstand heavy weight. Contractor is responsible to repair all sprinkler heads or pipe damaged by work being done on project. DO NOT REMOVE Ma CITY OF HASTINGS, ENGINEERING DEPT. 0 Project 6th. St. Hastings Ave. to Kansas Ave. Proj. No. R-2003-3 Description Design By Jeff L. Drown ByJeff L. Dote 4/1/03 Approveds�� Contractor Dm. No. 3 of 3 2