Loading...
HomeMy WebLinkAboutR2003-46" seph Ave® ver 1 0 0 0 CO 30.00 .f 30.00 — 3 1/2" to 4" Existing Asphalt / Remove Concrete Subgrade L 31' 682.00 ay 1 30" -•••111--11.0.- 1 Typical Section of Existing Streets St. JOSEPH Ave. "9th." to "12th." No Scale 1 1/2" Top Lift 2 1/2" Base Lift Concrete Subgrode 31' J Proposed Section St. JOSEPH Ave. "9th." to "12th." No Scale th 0 0 0 co 12 ho St Joe Avenue ESTIMATED QTY. FOR St. JOSEPH AVE. 9th. to 12th. ITEM NO. DESCRIPTION 1 Rotomill Pavement 2 Asphaltic Concrete Type 14 3 Asphaltic Concrete Tvae 17c/.40 4 Asphaltic Cement (PG64-22) 5 Emulsified Asph. (SS1H) Tack Coat 6 Adjust Manhole to Grade 7 Adjust Gas Valve to Grade 8 Adjust Water Valve to Grade 9 Saw Cut 10 Remove 30" curb & gutter 11 Build 30" curb & gutter 12 Concrete Patching (High Early) 13 Asphalt Driveway Patching 17c/.40 14 Remove sidewalk 15 Build sidewalk ESTIMATED QUANTITIES 4100 630 380 60 1025 3 0 1 200 200 100 150 15 100 100 UNIT S.Y. Ton Ton Ton Gal. Each Each Each L.F. L.F. L.F. S.Y. Ton S.F. S.F. 506.00 NORTH Scale: none r> LLI NOTES: Base Lift will consist of 2 1/2" Type 14 Top Lift will consist of 1 1/2" Type 17c /.40 Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. * Ends and returns on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt. Contractor will lay asphalt up to the existing new asphalt on 9th. , 1 lth. and 12th. Millings to be hauled to city landfill to be stockpiled. Top Lift of Asphalt shall cover flow lines in the gutter on both sides unless specified otherwise. Extra care will be taken to maintain water flow. Contractor is resposible to place Asphalt inset into driveways where needed. Contractor shall mill down to the concrete sub -base. Contractor shall use extra care when moving heavy equipment over and around this project the concrete base will not withstand heavy weight. CITY OF HASTINGS, ENGINEERING DEPT. 00 Project St. Joseph Ave. 9th. to 12th. Proj. No. R-2003-4 Description Asphalt Overlay Design By Jeff L. Dawn ByJeff L. DOfe 4/1 1 /03 APProveaG' / IN`s Controctor 3 of 3