Loading...
HomeMy WebLinkAboutR2004-1Lincoln Avenue Lincoln Avenue w a Lincoln Ave. Overlay 3rd. to 9th. //://1,...b - •f r yl/// r "toricrete..: ,_. ... • • �yi oncrete• `•• y. r P' 1140. a r...- • '..to 1r m tri -N- U) --F' CD CD -4- 0 a SI 1' a a • "-• Concrete ,.•1 •• - Y ;-.`.Concrete • e ry 07 CD CD --+- �J , / ep> NORTH 3011S00 NO 10003 303703 llOI13S03 Tap UR Pan Un Coma 9444.1• Typical Section of Existing Streets Lincoln Ave 3rd. to 9th. Nasal') Caves Sava* Proposed Section L Varies Lincoln Ave 3rd. to 9th. No Scale 6' •-•i J NOTES: Base Lift will consist of 1 1/2" Type 17c /.40 Top Lift will consist of 2" Type 17c /.40 Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Ends and retums on Project will be sawed prior to installation of Base Lift. Contractor shall use caution not to damage driveways during the removal of existing asphalt Millings to be hauled to city landfill to be stockpiled. Top Lift of Asphalt shall cover the flow lines of the gutters from 7th. to 9th.only 3rd. to 7th. shall not get covered, unless specified otherwise on site. Extra care will be taken to maintain water flow. Contractor is resposible to place Asphalt inset into driveways where needed. ** Contractor shall mill down to concrete sub -base Contractor shall use extra care when moving heavy equipment over and around this project the concrete -base will not withstand heavy weight. ** SEE DETAIL I ti BUILD ASPHALT TYPE 17e .40 1910.00 TON ASPHALT TYPE 17C .40 DRIVEWAY INLAYS 10.00 TON PG BINDER (64-22 .111.00 TON TACK COAT SS111 2155.00 GAL 6" P.C.0 PATCHING (478) HIGH EARLY 25.00 S.Y. • COMBINATION CURB & GUTTER LT. 250.00 LF. * COMBINATION CURB & GUTTER RT. 250.00 LF. *• 5' P.C.0 SIDEWALK 300.00 SF. 6- P.C.0 (478) CONCRETE 25.00 S.Y. • NOTE: REMOVAL & BUILD OUANTMES WILL 8E MARKED IN THE FEUD AT VARIOUS LOCATKINS 81' ENGINEER. * * NOTE HANDICAP RAMPS ARE REQUIRED AT INTERSECTIONS IN CONJUNCTION WITH SIDEWALK CONSTRUCTION. SEE SPECIAL PLAN C REMOVAL ROTOMILL PAVEMENT 8619.00 S.Y. • COMBINATION CURB & GUTTER LT. 250.00 LF. • COMBINATION CURB & CUTTER RT. 250.00 LF. ** 5' P.C,C SIDEWALK 300.00 S.F. SAW CUT 288.00 LF. 6' P.C.0 (47B) CONCRETE 25.00 S.Y. ADJUSTMENT OF UTILITIES MANHOLES 2 EACH WATER VALVES 9 EACH CAS VALVES 0 EACH 1'. 1' R 1-d e • a • • e e •. 4 . - •_ s e 4 6' 30' Combination Curb & Gutter Detail Match Existing No Scale A CITY OF HASTINGS, ENGINEERING DEPT. Projr Lincoln Ave. Overlay 3rd to 9th. PM. No. ear paee IleelPe et Jeff L. Dram Jeff L. RESURFACING 2004-1 Asphalt Overlay OaN ta 4/1/03 I 3 of 4