Loading...
HomeMy WebLinkAboutR2005-1d a 4 en a t. en lA l• ® �..x-.vn Si05H 1: ... kyr.-6Y ... r 4 +.!B! 11.`:f NORTH I* No eoele Project CITY OF HASTINGS, issei ENGINEERING DEPT. 0 KANSAS AVE. 1ST STR, TO 9TH STR. Proj. No. Description Design By Drawn By RLM RLM R-2005-1 AERIAL PHOTO Date 3/05 Approved By Contractor Drn. No. 2 of 4 MATERIALS - GENERAL REQUIREMENTS 1. Type of Asphaltic Oil for Tack coat Tack coat required under this project shall be SS -1 H. Water used to dilute emulsified asphalt shall be mixed in approximate 50-50 proportion with the oil. The rate of application of the diluted emulsified asphalt shall generally be from .10 to .20 of a gallon per square yard. 2. Asphaltic Concrete Type 17 asphalt according to State Specifications 3. Payment shall be made per ton asphalt and shall include all installation costs including, but not limited to sweeping and base preparation not otherwise provided for by separate pay item. NOTE: Contractor will take extra care to protect all survey markers, located in street, during construction. NOTE: Care will be taken to salvage existing manhole rings and covers and keep sets matched together. NOTE: Where pavement is milled, apply courses as specified to thickness as outlined on the plans or as specified in field by Engineer. NOTE: Salvage subbase in areas as specified on plans or as directed in field by Engineer. ASPHALT PAVEMENT SPEC. SHEET Laying, compacting and finishing shall be in accordance with sections 503and/1028 of the 1997 Standard State Specifications and 2001 Supplemental Specifications. Flagging and barricades necessary for construction will not be paid for directly, but will be subsidiary to the contract. CONTRACTOR'S NOTE 1. Payment will be made for actual field quantities utilized and shall show precedence over contract estimated quantities. 2. Locations of all manholes and valves will be tied off and recorded prior to any work. Manholes will be kept covered and kept clean throughout all of resurfacing project. 3. All drives and approaches will be asphalted back, as directed by Engineer in field. 4. It will be the responsibility of the Contractor to dispose all pavement removal. 5. Any earth excavation will be disposed of on-site on adjacent lots. 6. Contractor will be required to notify property owners a minimum of 24 hours prior to any work being started, so cars, etc. can be moved. 7. Contractor will lay new asphalt surface in a two lift process. Unless otherwise specified by plans or Engineer. 8. Contractor will be required to have all utilities located prior to start of work. 30" ® North Typical Section of Existing Street 1st Street thru 3rd & 4th thru 7th Street 3rd thru 4th approximately 2" existing asphalt No Scale 2' Type 17 Asphalt Bose Lift 7„---- 1.6. Type 17C Asphalt Top Lift .Gond A -hese" 6" -►1 I -y- L 31' Typical Section of Proposed Resurfacing 1st Street thru 3rd & 4th thru 7th Street 3rd thru 4th approximately 2 1/2" new asphalt 3' Existing Asphott / Remove No Scale Concrete Subgrode •} n• :...<...M.:y .. ... ii�.+a v,•w','•.i. .Y.�i Ji ..� ':f.•<. ]+�../�I F: f}`�j...«•�.n n. 31' Typical Section of Existing Streets 7th Street thru 9th Street No Scale •>reY'::: •:+=.N ''s:.:.+,k': L".: +••si n�Y... ..w_. ::y'.:: <; v...-.7. A.; :r,. 'ir: !<F . .d. . Proposed Section 7th Street thru 9th Street No Scale NOTES: The embankment and subgrade shall be adjusted to conform to the lines and grades on the plans in accordance with Section 205 and 302 of the 1997 Standard State Specifications and its supplements. The upper six (6) inches of the subgrade shall be scarified, mixed and recompacted to the following compaction requirements: Percent Density Moisture Minimum Requirements Maximum 95 Min. Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All subgrade compaction and water necessary for subgrade construction shall not be paid for directly but shall be considered subsidiary to the items of the contract. Excavation, backfilling, and sawing control joints, keyway, tie bars, dowel pins, and rubberized joint sealant shall be considered subsidiary to the unit price per square yard of pavement. NOTES: Base Lift will consist of 2" Type 17e/40% Except 3rd to 4th - Base Lift 1.5" Top Lift will consist of 1.5" Type 17c/0.40 Top Lift 1" ALTERNATE MIX DESIGN Base Lift will consist of 2" Type 17R Except 3rd to 4th - Base Lift 1.5" Top Lift will consist of 1.5" Type 17R Top Lift 1" Flowlines are to be covered on Top Lift only in certain areas as specified in field by Engineer. Concrete sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings are to become the property of the contractor Ends and retums on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing curb and gutters are in poor condition and the 5" concrete base will not withstand a lot of weight. Railroad tracks are to be left in place. Contractor shall pave in and around crossing area and Shall be Paid for as per Item Resurface RR Crossing Sta 1+40. Intersection at 2nd St. has a brick sub -base, and care Shall be taken not to Damage this. CALL BEFORE YOU DIG DIGGERS HOTLINE OF NEBRASKA 1-800-331-5666 CITY OF HASTINGS, ENGINEERING DEPT. 0 Project KANSAS AVE. 1ST STR, TO 9TH STR. Proj. No. R-2005-1 Description Asphalt Pavement Spec. Sheet & General Notes Design By Drawn By RLM RLM Date 3/05 Contractor Approved By Drn. No. 3 of 4 ASPHALTIC ALTERNATE MIX DESIGN Band) CONCRETE, TYPEI7R (A 3/4 1/2 3/8 4 10 30 50 200 C.N. FM Materials 19MM 12.5MM 9.5MM 4.75MM 4MM 600M 300M 75M 3A Gravel 100 100 99 89 58 26 16 6 97 45.7 Wash Sand 100 100 100 100 99 66 66 1 0 0 2A 100 98 96 78 27 10 3 1 0 40 RAP 100 94 87 52 34 23 19 11 90 44.7 5/8 X 4 100 50 9 5 4 3 2 2 100 44.4 100 100 100 100 100 100 100 100 0 3A Gravel 40% 40 40 39.6 35.6 23.2 10.4 6.4 2.4 38.8 18.28 Wash Sand 20% 20 20 20 20 19.8 13.2 4.6 0.2 0 0 2A 0% 0 0 0 0 0 0 0 0 0 0 RAP 35% 35 32.9 30.45 18.2 11.9 8.05 6.65 3.85 31.5 15.645 518X4 5% 5 2.5 0.45 0.25 0.2 0.15 0.1 0.1 5 2.22 0% 0 0 0 0 0 0 0 0 0 0 Combined Gradation 100% 100 95.4 90.5 74.05 55.1 31.8 17.75 6.55 75.3 36.145 Specified Gradation +98 94+ 80-98 52-88 32-70 17-38 10-24 3-7 0 0 Actual gradation 100 94 89 80 59 29 17 7 Voids 3.6 Oil 5.31 CALL BEFORE YOU DIG DIGGERS HOTLINE OF NEBRASKA 1-800-331-5666 CITY OF HASTINGS, ENGINEERING DEPT. 0 Project KANSAS AVE. 1ST STR, TO 9TH STR. Proj. No. R-2005-1 Description Asphalt Pavement Spec. Sheet & General Notes Design By Drawn By RLM RLM Date 3/05 Contractor Approved By Drn. No. 3 of 4 BUILD BUILD: 30' VALLEY GUTTER BUILD 30' COMBINATION CURB & GUTTER BUILD 5' SIDEWALK (47B) BUILD 6' RE. P.C.C. PAVEMENT 100 LIN FT 30 100 100 LIN FT SQ FT SQ YD 4- m Z5 Ez h BUILD BUILD 30' COMBINATION CURB & GUTTER ADJUST MANHOLE TO GREADE BUILD 6' P.C.C. PAVEMENT 130 LIN FT 2 EACH 210 SQ YD ansas:Avenue M -r 265' 990 SQ YDS 216 TONS REMOVE REMOVE: 30' VALLEY GUTTER REMOVE: 30' COMBINATION CURB & GUTTER REMOVE: SIDEWALK (47B) REMOVE CONCRETE PAVEMENT 100 FT 30 FT 88 SQ FT 100 SQ YD NOTES: Second Street 40' O N Third Street Direction of Fbwrine Y 10' 60' 356 SQ YDS 78 TONS ro 280' 1217 SQ YDS 266 TONS O .o ro REMOVE REMOVE SIDEWALK BUILD 40 SQ FT BUILD 5' SIDEWALK (47B) 46 SQ FT 1 Fourth Street 40' O 2" Depth(Vanes) REMOVE REMOVE: 30' COMBINATION CURB & GUTTER REMOVE C❑NC PAVEMENT 130 LIN FT 210 SQ YD The embankment and subgrade shall be adjusted to conform to the lines and grades on the plans in accordance with Section 202, 204 and 301 of the 1997 Standard State Specifications and its supplements. The upper six (6) inches of the subgrade shall be scarified, mixed and recompacted to the following compaction requirements: Percent Density Moisture Minimum Requirements Maximum 95 Min. Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All subgrade compaction and water necessary for subgrade construction shall not be paid for directly but shall be considered subsidiary to the items of the contract. Excavation, backfilling, and sawing control joints, keyway, tie bars, dowel pins, and rubberized joint sealant shall be considered subsidiary to the unit price per square yard of pavement. Item 5" Concrete Sidewalk will be built as per Plan "C" 933 SQ YDS 146 TONS 25' O to 30' 77/ 3" Depth 276' 328 SQ YDS 72 TONS 920 SQ YDS 201 TONS REMOVE REMOVE COMBINATION CURB & GUTTER REMOVE SIDEWALK BUILD 130 LIN FT 32 SQ FT BUILD COMBINATION CURB & GUTTER (47B) 130 LIN FT BUILD 5' SIDEWALK (47B) 38 SQ FT Fifth Street tt REMOVE REMOVE C❑MBINATI❑N CURB & GUTTER 100 LIN FT BUILD BUILD 30' COMBINATION CURB & GUTTER 100 LIN FT Sixth Street Direction of fbwEns — —� e) N 3" De 598 1778 SQ YDS 389 TONS th a CO Seventh Street =Mr -r 0 co Q a 33--<3 o o Q to Direction of Rowan* — 10 M 3' Depth Kansas Avenue 3" Depth O M Direction of Pavane — 1284' not to scale ITEM NO. DESCRIPTI❑N 1 ROT❑MILL PAVEMENT 2 ASPH. CONC. TYPE 17C (ALT 17R) 3 PERFORMANCE GRADED BINDER (64-22) 4 EMULSIFIED ASPH (SS1H) TACK COAT ESTIMATED QUANTITY 10847 2314 134 2715 5 BUILD P.C.C. PAVEMENT FOR PATCHING (47B HIGH EARLY) 100 6 BUILD 6' P.C.C. PAVEMENT 7 BUILD 30' VALLEY GUTTER (47B) 8 BUILD C❑MBINATI❑N CURB & GUTTER (47B) 9 BUILD 5' CONCRETE SIDEWALK (47B) 10 REMOVE CONCRETE PAVEMENT 11 REMOVE 30' CURB 12 REMOVE SIDEWALK 13 ADJUST MANHOLE TO GRADE 14 ADJUST GAS VALVE TO GRADE 15 ADJUST WATER VALVE TO GRADE 16 SAW CUT 17 SIGNS AND BARRICADES 18 RESURFACE RR CROSSING STATI❑N 1+40 210 100 490 184 310 590 184 2 UNIT SQ YD TON TON GAL SQ YD SQ YD LIN FT LIN FT SQ FT SQ YDS LIN FT SQ FT EACH 1 EACH 1 400 1 EACH LIN FT LUMP SUM 1 LUMP SUM 4325 SQ YDS 946 TONS REMOVE REMOVE COMBINATION CURB & GUTTER BUILD BUILD 30' COMBINATION CURB & GUTTER 100 LIN FT 100 LIN FT NORTH [II), No Sale NORTH w ,y4�� .o1ES /Q 9:P° "OSS o eee8000e0eq <,r �I� S (, A aooO�e ', <-' DAVID L ` e') " WACKER 14`51 E-5090 • CITY OF HASTINGS, ENGINEERING DEPT. 7, 0 Project KANSAS AVE. 1ST STR, TO 9TH STR. Proj. No. R-2005-1 Description CONSTRUCTION PLANS Design By RLM Dote 3/05 Contractor Drown By RLM Approved By Dm. No. 4 of 4