Loading...
HomeMy WebLinkAboutR2005-2Fie nu n ii ii SE EL - r 111111:—I- illim IIIII sill all �MI--e■ ■ lit- DI t LZ CL D __ •g; **i l mi ®uiuIu u� I I uI �r ICC ®ms �C�.�.. _ICC ❑CDCD[.�0--LI --at n [II' 53 TCDIDxlit ICCT91111111.I[ .' FE .• II ar�:i M _ HS.., �'* 1 1 Project NORTH No Sale CITY OF HASTINGS, ENGINEERING DEPT. 0 KANSAS AVE. 9TH STR, TO 12TH STR. Proj. No. Description Design By Drawn By RLM RLM R-2005-2 AERIAL PHOTO Date 5-05 Approved By Contractor Drn. No. 2 of 4 6" Z 3" Existing Asphalt / Remove in 0 1• {.. 30' 310' Concrete Subgrade 1v. 1034 sq yd 227 ton 31' 1 1/2" Top Lift 2" Base Lift Typical Section of Existing Streets 9th Street thru 12th Street No Scale Concrete Subgrade 31' Proposed Section 9th Street thru 12th Street No Scale 12' X /10 6" CO\C VALL-1Y 30' 1040 sq yd 228 ton NOTES: 100' NORTH Scale: 1^=100' 9' I0' 30' 505' i Base Lift will consist of 2" Typel7c/0.40 or 17R Top Lift will consist of' 1.5" Type 17c/0.40 or 17R 1684 sq yd 369 ton Flowlines are to be covered on Top Lift only in certain areas as specified in field by Engineer. Concrete sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. Millings are to become the property of the contractor Ends and returns on Project will be sawed prior to installation of Base Lift. Some Driveways on this project have asphalt and concrete patched into the gutterline. Contractor shall use caution not to damage driveways during the removal of this material. Contractor shall use care in maneuvering heavy equipment over and around this Project. Existing curb and gutters are in poor condition and the 5" concrete base will not withstand a lot of weight. ITEM NO. DESCRIPTI❑N 1 2 ASPH, CONC. TYPE 3 4 5 6 7 8 R❑T❑MILL PAVEMENT 17C (ALT 17R) PERFORMANCE GRADED BINDER (64-22) EMULSIFIED ASPH (SS1H) TACK COAT ESTIMATED QUANTITY 3758 824 48 940 BUILD P.C.C. PAVEMENT FOR PACHING (47B HIGH EARLY) 60 BUILD 6' P.C.C. PAVEMENT BUILD COMBINATION CURB & GUTTER (47B) BUILD 5° CONCRETE SIDEWALK (47B) 9 REMOVE CONCRETE PAVEMENT 10 REMOVE 30' CURB 11 REMOVE SIDEWALK 12 ADJUST MANHOLE TO GRADE 1 13 ADJUST GAS VALVE TO GRADE 1 14 ADJUST WATER VALVE TO GRADE 1 15 SAW CUT 16 SIGNS AND BARRICADES 1 100 100 100 160 100 100 UNIT SQ YD TON TON GAL SQ YD SQ YD LIN FT SQ FT SQ YDS LIN FT SQ FT EACH EACH 250 EACH LIN FT LUMP SUM fl• •°°°................. 004 0,,t e� " DAYID L tot co® w> E : &50 ® 7 a° • s �-uat • AY/ CITY OF HASTINGS, ENGINEERING DEPT. 00 Project KANSAS AVENUE 9TH TO 12TH Proj. No. R-2005-2 Description Construction Plans Date 5-05 DeticIn BY RLM Drawn By RLM Contractor Dm. No. f 4