Loading...
HomeMy WebLinkAboutR96-3Concrete Base C Asphalt 3.92% 533% FACT SHEET for CEDAP AVENUE 5th Street To 7th Street PROJECT R -g6(3) TYPICAL SECTION OF EXISTING STREET BETWEEN STH STREET & 6TH STREET LENGTH - 253.5 TOP -LIFT: Y THICK TYPICAL SECTION OF PROPOSED RESURFACING BETWEEN 5TH STREET & 6TH STREET NOTES 1. Contractor shall use care in maneuvering heavy equipment over and around this project. Existing curb & gutters are in poor condition and the 5" concrete base will not withstand alot of weight. 2. Contractor should note that half of this project requires asphalt to be placed into the gutterline. 3. Two intersection returns are scheduled for removal and replacement with this project. Concrete Base 4' Asphalt 1.50% 4 1" Aiphclt in Gutter TYPICAL SECTION OF EXISTING STREET BETWEEN 611i STREET & 7TH STREET LENGTH as 416.5' TOP -LIFT: 2" THICK BOTTOM -LIFT: r TYPICAL SECTION OF PROPOSIED RESURFACINGMININUM of 1 1/2• IN GUTTER BETWEEN 5TH STREET & 6TH STREET QUANTITIES ROTOMILL PAVEMENT ASPHALTIC CONCRETE, TYPE -14 1 475 S.Y. ASPHALTIC CEMENT (AC -10) ® 5.3%25.2Ton EMULSIFIED ASPHALT (SSIH) FOR Ton TACK COAT APPLIED 430 Gal. BUILD P.R. CONCRETE PAVEMENT (5") 200 S.Y. BUILD 30" P.C.C. CURB & GUTTER REMOVE CONCRETE PAVEMENT 108 L.F. 200 REMOVE 30" CURB & GUTTERS.Y. ADJUST MANHOLE TO GRADE 108 L.F. ADJUST VALVE TO GRADE 2 Ea. SAWING 1 Ea. 60 L.F. PROD. MISC. RESURFACING PROJ. NO. R-96(3) DESCRIPTION CEDAR AVE.- 5TH TO 7 Ty Hastings City Enainaarin„