Loading...
HomeMy WebLinkAboutSTPAA-5519(2)PhaseII0s6 orbe STA. 0+00 TO STA. 22+20 ITEM QUANTITY UNIT ROTOMILL 8427 S.Y. SP-4(0.75)BOTTOM LIFT 1434 TON SP-4(0.75)TOP LIFT 1161 TON PATCHING 50.00 TON PG BINDER (64-22) 151 TON TACK COAT 2107 GAL 4" WHITE TAPE 0.00 L.F. 4" YELLOW TAPE 1000.00 L.F. NOTE: AVERAGE WIDTH OF PROJECT FROM STA. 0+00 TO 22+20 = 34.16' Burlington Avenue / Highway 281 18+00 19+00 CONCRETE 21+00 22+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 NEW ASPHALT 31+00 2% Avg. Width = 34.16' Rail Road R.O.W 20 NEW ASPHALT ------------- 4" Rotomill Depth 2% Asphalt Sub—base) Typical Section f Existing Str t STA. 0+00 T* 22+20 No Scale 2% Asphalt. Sub—base Avg. Width = 34.16' 7-- 2.5" Type SP 4 Bose Lift 2" Type SP 4 Top Lift 2% Typical Sect] n of Proposed Resurfacing . STA. 0+00 Tit 22+20 No Scale Estimated 8.5• Estimated NOTES: Base Lift will consist of 2.5" Type SP 4 Top Litt will consist of 2" Type SP 4 Asphalt sub -base may require various patching to be determined by Engineer after milling operation and street has been cleaned. * Ends and returns on Project will be sawed prior to installation of Base Lift Contractor shall use caution not to damage driveways during the removal of existing asphalt. Contractor shall leave existing asphalt as is between Sta. 22+20 to sta 31+30. Contractor will lay asphalt up to the existing new asphalt. Surplus Millings to be hauled to city landfill to be stockpiled STS P G 'LAN STATION 0+00 TO 2+50 SOLID DOUBLE YELLOW STATION 2+50 TO 22+00 SINGLE BROKEN YELLOW DOUBLE YELLOW DETAIL No Scale �1 7' SINGLE YELLOW DETAIL No Scale 21' By NORTH Scale: 1"=100' 100' 0' 100' 200' 100' ESTIMATED ITEM NO. DESCRIPTION QUANTITIES UNIT 1 Rotomill Pavement 8427 S.Y. 2 Asphaltic Concrete 2595 Ton Type SP 4(0.75) 3 Performance Grade Binder (64-22) 151 Ton 4 Asphaltic Concrete For Patching 50.00 Ton 5 Asphaltic Concrete For Driveways 50.00 Ton 6 Emulsified Asph. (85111) 2107 Gal. Tack Coat 7 Adjust Manhole to Grade 1 Each 8 Adjust Gas Valve to Grade 1 Each 9 Adjust Water Valve to Grade 1 Each 10 Saw Cut 100.00 L.F. 11 4" Permanent White Type Ili Reflective Tape 0.00 L.F. 12 4" Permanent Yellow Type III Reflective Tape 1000.00 L.F. ACITY OF HASTINGS, ENGINEERING DEPT. 0 0 Project STP — Resurfacing Project Pfe' No. STPAA-5519(2)C.N.42175 Descrpta OSBORNE DRIVE EAST PHASE II Design By S. Dote lJO 0s2 Controctor Drown JEFFBEN L. APProvety L Drn. No. 3 of 4