Loading...
HomeMy WebLinkAboutM-330(48)PhaseIISOUTHEAST DRAINAGE /MPRO VEMENTS PROJECT M4-330 (48) PHASE 1I (SWD /985-1 CS a 0/TY OF HAST/NGS ENG/NEER/NG DEPARTMENT 1 WABASH AVE W Q Z 8 STREET C STREET CAL/FORN/A AVE CEDAR AVE DELAWARE AVE 1 ii D STREET PHASE IT, (SWD PROJECT M-330(48) /MPROVEMENTS DRA/NAGE SOUTHEAST A O m 0 W y, U o W U o Z W 0 W ; • ,-Z W K U O BJ r1- wo.aa Q —J d MOTE BOOK d 2 a m 0 0 N Z c W < < Y W0Z W = F W 0 WCUZD lorg aeca 8 8 B Street 7/0 100 7//t00 7/2 t00 7/3'00 7/4 100 7/5'00 fBu//d Reinforced Conc. Sewer Pipe No. Size Description /4 48"x243' Sto. 7/31'85 to Special MH No /5 /5"x 33' Curb /n/et No /2 to Curb /n/et No. /3 /6 /5"x 28' Curb /n/et /lb /3 to Curb /n/et No. /4 /7 /5"x 3/'Curb /n/et No.. /4 to Curb inlet No. /5 x /8 36 "x444 Specla/ MH /lb. 6 to Junction Box No. / Field Open N Belt line 24 Tes/ Sr tion 1 }28' ti 1.11- 60 60 ROW /5 5' 3/' 5 California Sheet eer 11 .p IjN 04 Wd Fr 4 }— 15' 44"CMP •d4 EmPty Lot 24' S Be _.me 52' RVW rn /55' . Ft /55' 3/' 6 0 Build Curb /n/et No. Station Side "y" TC E/ev. FL Note /2 7// t 60 42' Rt. /0' /4.0/ /0.84 Phase II /3 7// t 24 42'Rt. /2' /40/ /053 Phase 11 - /4 7// t 03 2151 Rt 8' /389 /0.25 Phase 2r /5 71/103 /5.5' Lt. /2' /389 /0.00 Phase II items East of Sto. 7/3085 Phase 1 Construction not considered as portion of this Contract. Gas Main Adjustments Sta. 7// t // Ste. 7/1 t // 20' Lt. 32' Rt. To be adjusted by others. G i»pocted Ti Grovel °Pen Field "B" Street STA 706 + 42.5 to 713 +85 Total Volume required to fill ditch as per cross sections: 1,585 C.Y. ? Pipe Displacement 374 C.Y. 1585 C.Y. - 374 C.Y. 1,211 C.Y. x 1.25 = 1,514 C.Y. This area additional borrow required = 1,514 C.Y. Estimated Total Intersections Excavation = 800 C.Y. Ci NR N 2 Gravel 2 2.6 P25 / 5' 5. 0 27 rc- m 39 x 38' 36.5 N • 48 45' 40/ S California / //2 Story Wd Fr 46' b M EOR- Begin transition back to C location at B and Pine. Sto. 706 t98 to Sto. 7/1 t 7750 Cone Garage Wd Fr e- e - m 47.5' Wd. She 0 Gorden 47. 7' 402 S Rhode /s/and 1- Story Wd. Fr. Bu//d 6"PC..C. (478) /ntersection B 8 California and B & Rhode island /126.9 S.Y. Pavement 429.4 L.F. Integral Curb h 45 49 con6. w 6I I UI I SII NM /909 73 Top Morn Conc. 44.3 Fill -E ! 774.5- CY Water Main Adjustments Ste. 7/10 50, 20' Lt. 30 LF of 6 4-450 E/bows 2-Conc. Anchorage -Alt= Sta.. 7//t50, 4/' Rt. 20 LF of 6" 4-45° E/bows 2-Conc. Anchorage-A/t.II Remove Vr ainage Culverts & Salvage for City Sta. 71/ t 09 Sta. 7// 042 Sto. 7// t 65 Sta. 7/2065 /5' Lt. C on Skew /5'12 10" CMP 30"CMP /2" CMP 48"CMP 30 LF 54 LF 34 LF 26 LF 403 S Rhode /s/and Sta. 714t665, /95' RI, Re%ocote Fire Hydrant Build /O LF 6' 0.1P Note:A// distances Lt. S RI from Survey L/ne.l PRO). Southeast Drainage /mprovements PR -I 330(48) Phase II SWD /985-1 DESCRIPTION B Sti -,. Wabash to Rhode /s/and Hastings City Engineering DS6N BY DATE CONTRACTOR Olsson ASSOC 3/26/65 ORN. BY PRD Sir ASBVLLIS CRN NO S.kP. / of 15 P/ Sta. .71/t::42 roes- E/ev. /9/3:70 /9/8 P/ Sto. 7/4 t 49 Ton' 'Lieu. /913.0 ... VC 0' SCALE „ , Horiz =/ =20 Vert r/'r2' /9/6 !9/4 H /9 /2 0'541 Begin Phase IT End All 4 . Phase /9/8 /9/6 erode Proposed .Grade i9li?In nv /9/4 /9/0 36' 0 RCP L01448.% /908 1y10.40 rCP 48" 0: RCP -0225 % -0 30% /9/2 /906 l"T /904 E 7/0100 50 7/1 100 t245 t36 048 Cs: 006.50:7op 48"0 RCP /9/0 /908 0 /90- 40'ff M ttr NA kv /906 /904 7/2 000 '50 713100 7/4100 f3/ 144 155 7/5 t00 NN)NW AT IEDENM. Aro WOW PLATE 1•SINCLE PLAN AND PROFILE -cuts oar *writ PRINTED IN N.S.A. Build Spec%/ Manhole, Sheet • No. Station Side Note 6 7//t42 20' Lt. Phase I fBu//d Reinforced Conc. Sewer Pipe No. Size Description /4 48"x243' Sto. 7/31'85 to Special MH No /5 /5"x 33' Curb /n/et No /2 to Curb /n/et No. /3 /6 /5"x 28' Curb /n/et /lb /3 to Curb /n/et No. /4 /7 /5"x 3/'Curb /n/et No.. /4 to Curb inlet No. /5 x /8 36 "x444 Specla/ MH /lb. 6 to Junction Box No. / Field Open N Belt line 24 Tes/ Sr tion 1 }28' ti 1.11- 60 60 ROW /5 5' 3/' 5 California Sheet eer 11 .p IjN 04 Wd Fr 4 }— 15' 44"CMP •d4 EmPty Lot 24' S Be _.me 52' RVW rn /55' . Ft /55' 3/' 6 0 Build Curb /n/et No. Station Side "y" TC E/ev. FL Note /2 7// t 60 42' Rt. /0' /4.0/ /0.84 Phase II /3 7// t 24 42'Rt. /2' /40/ /053 Phase 11 - /4 7// t 03 2151 Rt 8' /389 /0.25 Phase 2r /5 71/103 /5.5' Lt. /2' /389 /0.00 Phase II items East of Sto. 7/3085 Phase 1 Construction not considered as portion of this Contract. Gas Main Adjustments Sta. 7// t // Ste. 7/1 t // 20' Lt. 32' Rt. To be adjusted by others. G i»pocted Ti Grovel °Pen Field "B" Street STA 706 + 42.5 to 713 +85 Total Volume required to fill ditch as per cross sections: 1,585 C.Y. ? Pipe Displacement 374 C.Y. 1585 C.Y. - 374 C.Y. 1,211 C.Y. x 1.25 = 1,514 C.Y. This area additional borrow required = 1,514 C.Y. Estimated Total Intersections Excavation = 800 C.Y. Ci NR N 2 Gravel 2 2.6 P25 / 5' 5. 0 27 rc- m 39 x 38' 36.5 N • 48 45' 40/ S California / //2 Story Wd Fr 46' b M EOR- Begin transition back to C location at B and Pine. Sto. 706 t98 to Sto. 7/1 t 7750 Cone Garage Wd Fr e- e - m 47.5' Wd. She 0 Gorden 47. 7' 402 S Rhode /s/and 1- Story Wd. Fr. Bu//d 6"PC..C. (478) /ntersection B 8 California and B & Rhode island /126.9 S.Y. Pavement 429.4 L.F. Integral Curb h 45 49 con6. w 6I I UI I SII NM /909 73 Top Morn Conc. 44.3 Fill -E ! 774.5- CY Water Main Adjustments Ste. 7/10 50, 20' Lt. 30 LF of 6 4-450 E/bows 2-Conc. Anchorage -Alt= Sta.. 7//t50, 4/' Rt. 20 LF of 6" 4-45° E/bows 2-Conc. Anchorage-A/t.II Remove Vr ainage Culverts & Salvage for City Sta. 71/ t 09 Sta. 7// 042 Sto. 7// t 65 Sta. 7/2065 /5' Lt. C on Skew /5'12 10" CMP 30"CMP /2" CMP 48"CMP 30 LF 54 LF 34 LF 26 LF 403 S Rhode /s/and Sta. 714t665, /95' RI, Re%ocote Fire Hydrant Build /O LF 6' 0.1P Note:A// distances Lt. S RI from Survey L/ne.l PRO). Southeast Drainage /mprovements PR -I 330(48) Phase II SWD /985-1 DESCRIPTION B Sti -,. Wabash to Rhode /s/and Hastings City Engineering DS6N BY DATE CONTRACTOR Olsson ASSOC 3/26/65 ORN. BY PRD Sir ASBVLLIS CRN NO S.kP. / of 15 P/ Sta. .71/t::42 roes- E/ev. /9/3:70 /9/8 P/ Sto. 7/4 t 49 Ton' 'Lieu. /913.0 ... VC 0' SCALE „ , Horiz =/ =20 Vert r/'r2' /9/6 !9/4 H /9 /2 0'541 Begin Phase IT End All 4 . Phase /9/8 /9/6 erode Proposed .Grade i9li?In nv /9/4 /9/0 36' 0 RCP L01448.% /908 1y10.40 rCP 48" 0: RCP -0225 % -0 30% /9/2 /906 l"T /904 E 7/0100 50 7/1 100 t245 t36 048 Cs: 006.50:7op 48"0 RCP /9/0 /908 0 /90- 40'ff M ttr NA kv /906 /904 7/2 000 '50 713100 7/4100 f3/ 144 155 7/5 t00 NN)NW AT IEDENM. Aro WOW PLATE 1•SINCLE PLAN AND PROFILE -cuts oar *writ PRINTED IN N.S.A. Field Open N Belt line 24 Tes/ Sr tion 1 }28' ti 1.11- 60 60 ROW /5 5' 3/' 5 California Sheet eer 11 .p IjN 04 Wd Fr 4 }— 15' 44"CMP •d4 EmPty Lot 24' S Be _.me 52' RVW rn /55' . Ft /55' 3/' 6 0 Build Curb /n/et No. Station Side "y" TC E/ev. FL Note /2 7// t 60 42' Rt. /0' /4.0/ /0.84 Phase II /3 7// t 24 42'Rt. /2' /40/ /053 Phase 11 - /4 7// t 03 2151 Rt 8' /389 /0.25 Phase 2r /5 71/103 /5.5' Lt. /2' /389 /0.00 Phase II items East of Sto. 7/3085 Phase 1 Construction not considered as portion of this Contract. Gas Main Adjustments Sta. 7// t // Ste. 7/1 t // 20' Lt. 32' Rt. To be adjusted by others. G i»pocted Ti Grovel °Pen Field "B" Street STA 706 + 42.5 to 713 +85 Total Volume required to fill ditch as per cross sections: 1,585 C.Y. ? Pipe Displacement 374 C.Y. 1585 C.Y. - 374 C.Y. 1,211 C.Y. x 1.25 = 1,514 C.Y. This area additional borrow required = 1,514 C.Y. Estimated Total Intersections Excavation = 800 C.Y. Ci NR N 2 Gravel 2 2.6 P25 / 5' 5. 0 27 rc- m 39 x 38' 36.5 N • 48 45' 40/ S California / //2 Story Wd Fr 46' b M EOR- Begin transition back to C location at B and Pine. Sto. 706 t98 to Sto. 7/1 t 7750 Cone Garage Wd Fr e- e - m 47.5' Wd. She 0 Gorden 47. 7' 402 S Rhode /s/and 1- Story Wd. Fr. Bu//d 6"PC..C. (478) /ntersection B 8 California and B & Rhode island /126.9 S.Y. Pavement 429.4 L.F. Integral Curb h 45 49 con6. w 6I I UI I SII NM /909 73 Top Morn Conc. 44.3 Fill -E ! 774.5- CY Water Main Adjustments Ste. 7/10 50, 20' Lt. 30 LF of 6 4-450 E/bows 2-Conc. Anchorage -Alt= Sta.. 7//t50, 4/' Rt. 20 LF of 6" 4-45° E/bows 2-Conc. Anchorage-A/t.II Remove Vr ainage Culverts & Salvage for City Sta. 71/ t 09 Sta. 7// 042 Sto. 7// t 65 Sta. 7/2065 /5' Lt. C on Skew /5'12 10" CMP 30"CMP /2" CMP 48"CMP 30 LF 54 LF 34 LF 26 LF 403 S Rhode /s/and Sta. 714t665, /95' RI, Re%ocote Fire Hydrant Build /O LF 6' 0.1P Note:A// distances Lt. S RI from Survey L/ne.l PRO). Southeast Drainage /mprovements PR -I 330(48) Phase II SWD /985-1 DESCRIPTION B Sti -,. Wabash to Rhode /s/and Hastings City Engineering DS6N BY DATE CONTRACTOR Olsson ASSOC 3/26/65 ORN. BY PRD Sir ASBVLLIS CRN NO S.kP. / of 15 P/ Sta. .71/t::42 roes- E/ev. /9/3:70 /9/8 P/ Sto. 7/4 t 49 Ton' 'Lieu. /913.0 ... VC 0' SCALE „ , Horiz =/ =20 Vert r/'r2' /9/6 !9/4 H /9 /2 0'541 Begin Phase IT End All 4 . Phase /9/8 /9/6 erode Proposed .Grade i9li?In nv /9/4 /9/0 36' 0 RCP L01448.% /908 1y10.40 rCP 48" 0: RCP -0225 % -0 30% /9/2 /906 l"T /904 E 7/0100 50 7/1 100 t245 t36 048 Cs: 006.50:7op 48"0 RCP /9/0 /908 0 /90- 40'ff M ttr NA kv /906 /904 7/2 000 '50 713100 7/4100 f3/ 144 155 7/5 t00 NN)NW AT IEDENM. Aro WOW PLATE 1•SINCLE PLAN AND PROFILE -cuts oar *writ PRINTED IN N.S.A. items East of Sto. 7/3085 Phase 1 Construction not considered as portion of this Contract. Gas Main Adjustments Sta. 7// t // Ste. 7/1 t // 20' Lt. 32' Rt. To be adjusted by others. G i»pocted Ti Grovel °Pen Field "B" Street STA 706 + 42.5 to 713 +85 Total Volume required to fill ditch as per cross sections: 1,585 C.Y. ? Pipe Displacement 374 C.Y. 1585 C.Y. - 374 C.Y. 1,211 C.Y. x 1.25 = 1,514 C.Y. This area additional borrow required = 1,514 C.Y. Estimated Total Intersections Excavation = 800 C.Y. Ci NR N 2 Gravel 2 2.6 P25 / 5' 5. 0 27 rc- m 39 x 38' 36.5 N • 48 45' 40/ S California / //2 Story Wd Fr 46' b M EOR- Begin transition back to C location at B and Pine. Sto. 706 t98 to Sto. 7/1 t 7750 Cone Garage Wd Fr e- e - m 47.5' Wd. She 0 Gorden 47. 7' 402 S Rhode /s/and 1- Story Wd. Fr. Bu//d 6"PC..C. (478) /ntersection B 8 California and B & Rhode island /126.9 S.Y. Pavement 429.4 L.F. Integral Curb h 45 49 con6. w 6I I UI I SII NM /909 73 Top Morn Conc. 44.3 Fill -E ! 774.5- CY Water Main Adjustments Ste. 7/10 50, 20' Lt. 30 LF of 6 4-450 E/bows 2-Conc. Anchorage -Alt= Sta.. 7//t50, 4/' Rt. 20 LF of 6" 4-45° E/bows 2-Conc. Anchorage-A/t.II Remove Vr ainage Culverts & Salvage for City Sta. 71/ t 09 Sta. 7// 042 Sto. 7// t 65 Sta. 7/2065 /5' Lt. C on Skew /5'12 10" CMP 30"CMP /2" CMP 48"CMP 30 LF 54 LF 34 LF 26 LF 403 S Rhode /s/and Sta. 714t665, /95' RI, Re%ocote Fire Hydrant Build /O LF 6' 0.1P Note:A// distances Lt. S RI from Survey L/ne.l PRO). Southeast Drainage /mprovements PR -I 330(48) Phase II SWD /985-1 DESCRIPTION B Sti -,. Wabash to Rhode /s/and Hastings City Engineering DS6N BY DATE CONTRACTOR Olsson ASSOC 3/26/65 ORN. BY PRD Sir ASBVLLIS CRN NO S.kP. / of 15 P/ Sta. .71/t::42 roes- E/ev. /9/3:70 /9/8 P/ Sto. 7/4 t 49 Ton' 'Lieu. /913.0 ... VC 0' SCALE „ , Horiz =/ =20 Vert r/'r2' /9/6 !9/4 H /9 /2 0'541 Begin Phase IT End All 4 . Phase /9/8 /9/6 erode Proposed .Grade i9li?In nv /9/4 /9/0 36' 0 RCP L01448.% /908 1y10.40 rCP 48" 0: RCP -0225 % -0 30% /9/2 /906 l"T /904 E 7/0100 50 7/1 100 t245 t36 048 Cs: 006.50:7op 48"0 RCP /9/0 /908 0 /90- 40'ff M ttr NA kv /906 /904 7/2 000 '50 713100 7/4100 f3/ 144 155 7/5 t00 NN)NW AT IEDENM. Aro WOW PLATE 1•SINCLE PLAN AND PROFILE -cuts oar *writ PRINTED IN N.S.A. P/ Sta. .71/t::42 roes- E/ev. /9/3:70 /9/8 P/ Sto. 7/4 t 49 Ton' 'Lieu. /913.0 ... VC 0' SCALE „ , Horiz =/ =20 Vert r/'r2' /9/6 !9/4 H /9 /2 0'541 Begin Phase IT End All 4 . Phase /9/8 /9/6 erode Proposed .Grade i9li?In nv /9/4 /9/0 36' 0 RCP L01448.% /908 1y10.40 rCP 48" 0: RCP -0225 % -0 30% /9/2 /906 l"T /904 E 7/0100 50 7/1 100 t245 t36 048 Cs: 006.50:7op 48"0 RCP /9/0 /908 0 /90- 40'ff M ttr NA kv /906 /904 7/2 000 '50 713100 7/4100 f3/ 144 155 7/5 t00 NN)NW AT IEDENM. Aro WOW PLATE 1•SINCLE PLAN AND PROFILE -cuts oar *writ PRINTED IN N.S.A. Remove 4/0 SY 6"concrete /ate -section' a m O O W W W v f 0 zQ wow W i ; z c5. D�. V) o_ < tx z z W 0 0 0 0 W 0 p z i 705100 706100 8 Street N N Westland Modulars Inc. Metal Bldg. 8 x conc. r x261 56 46' P 3' nQ QW Con°. 60' ROW N 707100 B' 708100 709100 7/0100 c Y / /MPS /36 / 1 I 111 t' JAW'188'\ N 23.5 ": 26(8 • 35 /B_'ONP 21 0. F. Gra,10 2?-7-WeldP_ v Build 6" PCC "47 B" Intersection B & Pine Ave. 5914 S.Y. Pavement /99.7 L.F. Integra/ Curb Ogen Fled ... w 0 2,11- - - A Build CMP No. S/ze Description 26 24 ,,1 /0' Existing 24" RCP to Curb /n/et No. 2/ 27 /2x55` CMP from Sta.705/68, 20'Rt, to Curb /n/et No. /9 14 conc. /9//.217 Top co 32' t/h /9//.50 Too MO 1%2 16' A g w/r /9264 .. Mon Grose' 5 Remove Drainage Culverts & Salvage for City Sta. 7051 75 to 706t3 /721 /5'C/11P 6OLF 310. 706400 Lim skew 36"CMP 75L.F. SM. 706460 5" Lt. 24 `RCP 4 5L.F. Sto. 706486 k skew 24 RCP 32L.F. Remove 8 Replace 6"PCC Driveway Sta. 70548551o7064/5 /8'L.F. /3.5S.Y. 13 17' 23' T Belt Line m M YJ 5' A 6' 12' 23 12 Open f load Q Build Reinforced Conc. Sewer Pipe No. Size Description 20 24'A 23' Curb /n/et No. /6 to Junction Box No. / 2/ /8"x /5' Curb /n/et No. /8 to Junction Box No. 2 22 /8"x33' Curb /n/et No. /9 to Curb /n/et No. /8 23 242( 37; Curb /n/et Ab. 2/ to Junction Box No./ 24 36 x 50 Junction Box Na 2 to Junction Box No / 25 30'x /5' Curb /n/et No. /7 to Junction Box No. 2 0 Bu//d Curb /n/et N0. Station S/de "y" 7C E/ev. FL. /6 /7 /8 /9 20 2/ 7061 79.7 706145.5 706123 7061/9 705* 68 707#00 39'Lt. 39••13. /81At. /8 Rt, 23'Pt. /8' Rt 6' /2' /0; 8 FES CMP 6' /6/8 /6.35 /6.36 /6.37 /6./2 /300 /2.60 /2.00 /2.45 /3.40 Match Exist "9.1.1. Street ' Total Pipe Total Pipe 248 C_Y., x STA 701 + 55 to 706 + 42.5 Excavation 302 C.Y, Displacement 54. C.Y. 1.25 = 310 C.Y, Balance Q Bu//d Junction Box No. Stotion Side Size EL Notes / 2 706198 7061.46 205'Lt 20.5'•13 51x5' 5x5' /134 /156 Field check 30 p/Ae location to north. Compacted Fill: 253 C.Y Souttneost Dro/nnge /improvement PAPA NO.. M-330 (48) Phase. .12" step"/9857 OE3CRIPT1W4 B. SYr. - Wabash to Rhode /shnd Hastings at ` Engineering 02GN 81 I CATE. Olsson Asso4 3/26/86 GBNTRAGIOR ORM BY S.K.P. ()RN. NO:... 2- pt 15" /922 561127...„ Nom .1..-.20 Vert = /"=2` P1 /920 /922 7051.00 :"FOS, lev• '191835 MP 10 /920 /9/8 1 /9/6 -a//5% Ekisfinp:::Grade . /9/8 /9/4 /9/2 /9/0 /908 t oposed....Crode /9/6 /9/4 /9/2 /9/0 /906 t IQ C#1 /904 tN v. • • t8 A tat 705t00- 150 t,+ to sgi } 4.4 706100 13/.2 425 160.5 178.6 707100 Col 41 r H CV a t 708 tO0 PLATE 1-SIN;34LiskrlacitNaCPROTFILE-ruic. DOT 10111110011 PRINTED WI U.S.A. 150 /908 /906 /904 a m 0 0 W W Y U W U f 0 2a W 0 W 3 W z D cz OJ J I- N 0. < J NOTE BOOK, 0 z W 0 0 m 0 Z 0 N z G 1- w Y WCz G U0 ce 1;1. =E t')&0 m417) L1 O GC 0 NOTE BOOK 6 z ft IP I II 704100 5t00 1 B Street n • 355' 5,pn07 ereR 0' h 0 80' 75.5' o s Bf m si 11_,n1115 ����� 1. xas 281 25.5' b N Note: 4" Gas //ne to be /ocated Pr/or to stoking. ti West/and Modelers Inc. Meta/ 8/dg. 7 Compacted Fill 256 CY Remove 6 Rep/ace 6" Conc. Driveways Sta. 7031 /2 to Sto. 703* 85 /8'Lt. //3.5 S.Y. Sto. 704t44.5 to Sto 704* 615 /82,t. /78 S.Y. Sto. 704t82.5 to Sto 705*03.8 /81 Lt. 23.7 S.Y. Gas Service Adjustment 702 t 50 Lt Water Service Adjustment 703* 4,9 Lt 575' Remove Drainage Culverts 6 Salvage for C/ty Size Description Locations 89 LF /8" 702 * 23 20' Lt. 74LF /8" 703t 48 /9' Lt. 2OLF /8" 704 t 22 20' Rt. 20LF /8" 704 t 52 /7' Lt 39LF /8" 704 t 92 /9' Rt. Q Build Reinforced Conc. Sewer POe No. Size Description 23 /8'x 468' Junction Box No. 3 to Sto. 706 t 23 Cane. 4/ 5 $ � p 18 -CMP /9' 5 67 Top 35 \\ 775 '15 /9/3.55 Top Moi: /6"CMP Gra55 —~ 3B Gro✓el 3 s2' ea • 9/6 d to Gravel Or. h n' rSto 70/ 1 28, L7-1, r Buried 1 %n Area RR Crossings (By Others) 70/ * /// Lot Rock perking �o o Build Area /Hist Na Stat/on Side A B IE, P/pe E Grote 3 70/ 1 55 /8'Lt 2'-O" 2=0" /6.08 (/8'i /9/9..00 4 5 to be /ocated in field by Engineer PROM. Southeast Drainage improvement PROM. NO. /N-330 (48) Phase .II• SWD /985-1 DESCRIPTION 8 Str - Wabash to Rhode Is/and Hastings City Engineering DSGN BY' Olsson Assoc3/26/86 DATE CONTRACTOR - ORN BY SKP APPRD iyq 8Y-, U% ASBUILTS DRN NO. 3 of . 15 /922 .TBM. •700-1............................ NECar 8::St::E:41/nnesofo..Ave.,.Elev..I92427 4 /920 /9/8 /9/6 /9/4 /9/2 P1 Ste. 7OO.t:68 4-10 ...1'9,.2.2:78 VC•€20 Sto.. 70/1.50 Bev -1919.60 AlVC IOC 0 a....3 BA4.. ;00-2 .<k,"..on..ritW.CO? :Nvt' Fm.... Between Pine & M/ •n: in front Of Water Product's., S Side of 8 $t, Eiev /92/.81' Existing Grade Proposed erode SCALE Horiz =l=2 Vert.-./- ' 2 P/ Sta. 705/GO E/ev /9/ i:35 VC /GO 410 : /0 /922 /920 /9/3:70 /9/8 /9/6 /9/4 /9/2 /9/0 /9/0 /908 /906 Oaten ..Etev...1900-Sao- Leve U9E 6 e8.; cw /904 (49 N ti N W CSJ Qi CAI b b h N :h ti cal cal 1591 N. /908 l 4• ti C /904 700t00 /55 t7/ 70/tOO 1/1 150 702/00 150 7031'00 150 '704t00 150 705100 NIDNWAY FIOCRAL AID SHUT PLATE I -SINGLE PLAN AND PROFILE -ruts ooT leTELEDYNE ►HINTED IN U.S.A. 5: W P- 0 0 W w Y W w V W w o5 V V Q J 0 w 0 J NOTE BOOK 0 z 414;00 4/5;00 4/6tQ9 4/7100 4/8tX 4/9'000 4 S. California a Q Bui/d Reinforced Conc. Sewer Pipe No. Size Description / 30'x 28 ' Junct. Box No. / to Spec/a/ MH 2 21"x 266' Junct. Box No. / to Junct Box No. 2 3 /Six /6' Curb /n/et No. / to Junct. Box No. / 4 /5/x /6' Curb /Net No. 2 to Junct Box No./ 5 /5" /61 Curb /n/ot Na 3 to Junct. Box No. 2 6 /5'x/5- Curb /n/et No. 4 to Junct. Box No. 2 0 Build Junction Box No. Station side "A" /B" 1L / 2 4/4t79 4/7'64.5 c £ 2-0" 21-0" 214" 2'4" 997(30") //.39(2/') Remove Drainage Culverts 6 Salvage for City Size Station "Y" /6 LF 1// 4/7t 50 /51' Rt 28 LF /8�' 4/6' 30 /8' Lt. Remove Curb 6. Gutter, Retaining wall and Rebuild (see detail sheet Sto. 417/56 to Sta. 4/7 t 78 22 LF /5' Rt S8 70'ROW ()Build Curb /n/et, P/on 443- R2 No. Station Slate "Y" Top Curb FL / 4/4 t 99 /51 Lt /0' /3.85 /0.68 2 4/4 t 99 /51 Rt 8' /3.85 /068 3 4/7169.5 /6/Lt. /2' /4.5/ //.34 4 4/7+715 /4'Rt /0' /45/ //34 aroge Wd. Fr OPe" Field 230 E A Str_ / //2 -Story Wd. Fr. 23/ E. A Str. / //2 -Story Wd Fr !Compacted Fi// 73 C.Y. 47' 5/' /2" CMP RETAINING WALL DETA/L BU/LO AT DIRECTION OF ENG/NEER 22.5 VB Cb _ _ _ /8 CAMP set SS /2"CMP /6.4', 1 It I /5.5 n GrOyel 28.5' lowCanC%/6 5/ree/ t Grovel IYt Emery 8' 48 52.4' OQi 70 ROW Storage Bldg I -Story Wd Fr California Avenue "A" Street to "B" Street 5/.8' 305 5 Calif 1 --Story Wd. Fr Total Pipe ggxxcavation 225 C.Y,. Pipe Displacement' 50 C.Y. / 175 C>Y, x 1.25 = 219 C.Y. $q/, 51.5 30/ 5 Co/if. 1 -Story Wd. Fr 2/9 5 Calif. 1 --Story Wd. Fr 2/7 5 Calif /- Story Wd. Fr. PROJ. .. Southeast Drainage improvements PROJ. N0: M-330(48) Phase 1l SW) /985-/ DESCRIPTION Co//fornio Ave. -4 SYr. to 8 Str Hastings 'City Engineer/ng DSGN PT Olsson Assz DATE 3/26/86 CONTRACTOR DRN BY S.KP APPRD BY AWAITS ' DRN NO. 41 of15 /920 SCALE /?ortz t r=20' Vert =.1.= 2` /920 /9/8 P/ Sta..4X4t :40 Elev../91a 77 VC.....0' /9/8 /9/6 /9/4 /9/2 1 'O 321 /9/0 D8/01"E%Be /9/a00 u.s.a ...6...G. 30" o RCP /908 Proposed € grade 10245.% tasting grade 2/ RCP 10:2/8 V /906 c- /9/6 /9/4 /9/2 0 /9096'7 /9/0 /908 /904 C97 /902 a O gi Cw CC 0 N .O 0 rn. m U. Vi! .IN L o� N 4 Cs1 /906 /904 /902 4/4/00 '34 4/5/00 150 4/6'00 t50 4/7/00 150 4/8100 '/2.2 /50 4/9/00 HIGHWAY FEDERAL MO SHEET PLATE 1 -SINGLE PLAN AND PROFILE -FULL DOT PRINTED IN UE.A. 0 m Cr -J MOTE BOOK d z W 0 } m C 2 C VWla OC Ca. W " U K < E re re CC N 6 0 tau) NOTE BOOK 0 z' 5/6100 5/7100 C Street 55- '4 Garage Wd Fr 72 2' .4 h 76.5' cont. 5/8/00 5/9100 520100 521/00 60 'ROW 1 9. /2.5'RCW Garage Wd Fr l-ot Empty 4/8 5 Delaware I- Story Wd. Fr. 52' 0, Top Frame Elev. /909.40 FL /90740 036' pock AY '4 9, 900 cone 325' 7.5' Stub & /8' P/ug /0' /9/4. /6 lap MN u' /2" CMP . Exact Loco/ion Unkno 22.5' / op -1, lain /5'RECP 05' 25.7' >c 30.5' 3/ SS GOO 376 500 Cedar Basement House to no '4 566' 50/ S. Cedar / V2- Story Wd. Fr 57' Ig 6/ Caro.: 62 b N 5/8 E C Street /- Story Wd. Fr 4 0 v m Phase I Quantities not in th/s contract, note , for Phosell Quantities MIS sheet. Water Moth Adjustment 25 L. F Sta. 5/7192 , 24 " Lt. - 4 Water Moin to be lowered to /905.2 21. 4-4" 45° Bends. 2- Reim! Conc. Anchorage - 2- Thrust Blocks i Bui/d Area In/et Sht. No. /0 No. Stotion Side Rim E/ev. /{ / 5/9t 45 40'Lt 09.40 0740 Q Build Curb /n/et, P/on 443-R2 No. Stotion Side "Y " TC E/ev. FI. E/ev. / 520 t 76 /8' Rt. 8' N. 72 8.56 2 520t 76 /8'Lt /2' //. 73 8.56 3 5/7153 39'Rt /2' /3.03 9.86 4 5/7t 35 /8' Rt. /0' /3. /5 9.44 5 5/71 35 /8'Lt 6' /3./5 9.00 Remove Trees 5/8t59 - 2/1 LE 5/8172 - 25' Lt. 5/8t845 - 25' Lt. 5/8192 - 2/' Lt. 5/9t0/ - 20' Lt. 5/8133 - 30' Lt. 5/9t/0 - 22' Lt. 5/9 t 88 - /9' Lt 520t 46 - 2/' Lt. 520t74 - 22' Lt' 520175 - 22 Lt. 5/6 t /4 - /8' Lt. Stump 5/910/ - 2/' Lt. Stump ❑ Build Special Manhole, Sheet 9,71x7' /Lb. Stotion Side Note' 3 5/7174 124'Lt See Detail Sheet Build Reinforced Conc. Sewer Pipe O No. Size Description /o /5'x/.5' Curb In/et lila 2 to 60 RCP /5",r14', Curb In/et No. / to 60"RCP Top & Cd/or 2 60x296 Special MH No. 2 to Spec%o/ MH No.3 3 /8';r/4'Area Inlet/Bar Grote to 6O"RCP Tape Col/or 4 24�r35,, . Specio/ MH No. 3 to Curb In/et No. 5 5 /5 x30 Curb /n/et No. 3 to Curb /n/et No. 4 6 /8"x 33' Curb In/et No. 4 to Curb /n/et No 5 7 /8' '3I2.5' Sta. 5/7+275 to Curb Inlet /,yo. 6-Phose2 7 I /8'x 7.5 Stub from Curb /net No.5 w/18 Standard \ Pipe Plug- Phase / Remove Drainage GLlverts 6 Salvage for City 5/7 t 74 22'Rt. 5/9 4 /9 /5 Lt 5201 /3 € '5201 /9 C 520 t 30 C 52013/ C /2" CMP 48"RECMP 24" RECP 28"CMP /2" CMP /2" RECP 30 LF 22 LF 40 LF 37 LF 30 LF 28 LF Remove & Replace Conc. Drive Sto. 5/91/8, L f. - 20 S.Y. Cas' Main Adjustment Sto. 5/7 t 62, Lt : Gas lain Relocations to be determined by Gos Company, /9/8 /9/6 It) Begin /9/4 /9/2 /9/0 /908 /906 /904 Existing.' Grade Phose.• } 4 Li/n/ts':..of P/ion /::' P/. ... _._ _ ... SIo.::5./9 t 50 Tan. Elev. - /912.43 VC r.9' ._.. 1 PROJ iSoutheostDtoinoge'-'/mpibvemen PROD, NO. M-330(48/ Phase / WD /985=/ DEOCRIPTION C Str - Cedar•. Ave: • to• Delaware Host/ngs Ci'y En17/000.679 OS$N"BY Olsson. ..As c,. APPRO'BY OW'OY •,SK.P..: DATE'• '5/30/85' GOYTRACTOR L:J ibb *SONLT6 • :'776,6 -o,w'ra ).5 /9/8 SCALE „ , Horiz:J-J .a.20 Vert -a.:=.2' 19/6 to -52/:. t./5. Tan: E/ev. 191/60 VC= 0 /9/4 Proposed Grade: -0.3/3 162 172.5 /82 5/8100 /90750 (/8") 60. , ... . O:'tt0 /912 /9/0 /908 0 1 Ihl 150 520100 150 WI m h!1 cel /906 1' ,105 / 4 /902 HIGHWAY FEDERAL AIO SHEET PLATE 1-S1NGLE PLAN AND PROFILE•ruLL ooT xTa.EVfNE PRINTEO.IN U.S A. W 0 m 0 W Y UU W W 2= U U 0 ZQ LLIC341> uJ u W 2 Zo G. < Indcc o: J 0 Y I oo W ▪ I O 0 Z z W 0 m 0 W 0 W M / CC 0 a J N 4 H 0 0 L 0 N Z z Z 41 U 0 W J LL. O CC 0 NOTE BOOK 0 z 5//100 5/2/00 5/3/OO 514/00 5/5/00 5/6100 open Field C Street o 4 .5 6 1- M 60' ROW Grave 0 Lot Empty 9 h Garage 825' Cone 9' a 38.5' b 422 S Rhode Island /- Story Wei Fr. 75.5' o' California Ave. 60' ROW r /55 0 IQI O 27' /9/2.72 Too Moin 28 Lot Empty Build 6"P.C.C. n47.91/ Intersections iC1ii Rhode /s/and and "C "a Co/ifornia 9/4.9 S Y, Pavement 332.5 L.F. Integral Curb OO 35.4 Brick Garage 0 55' 500 S. Rhode Island 2- Story Wd. Fr No info on SS. 6"Water Main Adjustment Sto. 51/463 201.1. 20L.F. 56' 423 S. Rhode island /- Story Metal Frame 472' 52'ROW //• /2' 5' u' 291 I° 41( 41». — 53.7' Gore' 42' RR Ties 473' Wd. Fr Garage 48' Pipe Excavation.. .. Cedar to California '450 C.Y.. Pipe Displacement 66 C.Y. Fill 384 x 1,25 = 480 C.Y. 1' Hit/ A O Build Curb /n/et, Plan 443-R2 No. Station Side "Y" TC E/ev. if E/ev. 6 5/4/ /5 /8/ Rt. 8' /4.92 /128 7 5/4//5 /8'4,t. 6; /4.92 //.46 8 5/// 66 39 Rt. 8 /7.03 /3.49 9 5//t 30 39' RI /6' /703 /386 /0 5/4t 36 39/Rt. 8' /4.79 /162 O Build Junction Box No Station S/de "A" "B " FL / 5// t 66 20/Lt. 2'-O" 2/7" /2.69(/8") Q Bu//d Reinforced Conc. Sewer Pipe No. Size Description 8 15"x33' Curb /n/ef Na 7 to Curb /n/et No. 6 9 /81'249/ Curb /n/et No.6 to Junction Box / /0 /8x 59' Curb /n/et No. 8 to function Box / / / /5X 33' Curb /n/et Na 9 to Curb /n/et No. 8 /2 /51k 28' Curb /n/et No. /0 to Curb /n/et /Vo. 7 Remove Drainage Culverts 6 Salvage for City 5//t73 ? /2"QIIP 26 LF 5/3//5 Lt /2' CMP 42 LF 5/4/32 £ /2" CMP 24 LF Remove .6 Rep/ace Conc. Drive 5/3/ /6 Lt. 207 SE ed Fill Cedar to Rho Rh Tree Removal by others and to Coliform 9C.Y. PROJ.. .Southeast Ora/nage . /mprozement PROJ. NO... M-330(48) Phase Q SWD /985-1 DESCRIPTION C Street- California Ave. to Cedar Ave Hastings City Engineering DSON BY Olsson Assoc. DATE 3/26/86 CONTRACTOR DRN BY SKP APPRD BY . ASBUILTS 1 DRN. NO. 6of /5" TSM •409-1 8E. Corner. C.$%-C-.Colifornio "x" :on FH Cop Nut E/ev. /979:87" •Ave... Sta.4/O/.44,.25.2'.R/ /9/8 P'/ Sta..5//1:48 Ton Elev. 19/6.86 /9/6 /9/4 /9/2 /9/0 EK/Stinj::::6.eade -p T2s. a Prop6.sed Grade P/ Sto. 5/4/54 Tan: 'L'lev 1914'64 VC 0' SCALE Horiz= /"=20, Vert'- / "=2• /9/8 /9/6 455:% /9/4 /908 /906 Ootum Vet! .906 -Seo Level 9..S.C. • & GS. /904 /902 • SD /9/2 /9/0 Cal (13-i n<o tt WI n, 1 ti /90466 .� �!N w. cat h). O h• ti. *i M 908.35 Top. . a O' ICI E h CtI ni /908 /9.Q6 /904 /902 5// /00 , t34 /45 /56 5/2,400 >50 5/3100 /50 5/4/00 /45 /55.5 /66.5 5/5100 /50 516t 00 MIONWAY FEOERAI AIO EMELT PLATE 1 -SINGLE PLAN AND PROFILE-Fuu. oar 'twos PRINTED IN D.S.A. co 'CC J a- NOTE BOOK 41 W 1- 0 r m 0 x U N z o H Y WCZ W CC U p ¢ W a V 0 coacoi W J 0 CC 0 .0 0 m 0 0 /00Z'00 /008000 /009000 /0/0000 De%wore Avenue 70' ROW m h } Gravel SS /n Alley 92.5 70' ROW /0//t00 4/6 De/aware SS Goes Though 4/4 De/aware /0/2100 conc. Park in9 Lot q 523-15 East D Wd Fr 4- P/ex ON. - 5/6-10 De/aware Wd Fr 4- P/ex S.S. /n Alley Water Service Eroc/ Loco/ion Unknown 4/6 S. De/ /-Story Wd Fr. 50' L. 5/' 52" 055 5.8. Se r 5PH Projec/ rc O Build Curb In/et, Plan No.. 443-R2 Phase / hb. Station S/de "Y" 7C E/61! /L / /007, 50 /82.t. 6' /080 0700 2 /007t50 1881 4' /0.80 08.63 3 /0/0/525 39 Rt. 6' //. 7/ 08.54 4 /0/O 087.5. 39'R/ 8' 11 7/ 08.38 5 /0// t /O /8' RI /0' //.69 0798 6 /0// t 3/5 /8'L/ 6' //.77 08.55 o Bu//d Junction Box, See Sheet No.. /0 , Phase / No Station Side 'A" "B" `L / /0//,09 2'-O" 21-7" 08.50 o Build Spec/c/ MH, See Sheet No. 9 ,Phase / No. Station Side / 2 /007034 /0/0t 94 2/'Lt. 39Lt. 41-6"x 8' 8'x8' —280. /4.5" B X215 2 Grri55 la jJl �J1" /`W�12 J i r P Gravel / y / 0 / / •' OPen Field 55.5 52' 3 De/aware /- Story Wd Fr Sta. /O// t 40 Limits of Phase / Construction Begin Phasell Construction Ste. /0//024 SS to D Street Got to 0 Street / m 05.1'/ / / / / Gravel Phase 2 Quantifies no/ in Ibis contract, Majority of sheet for information on/y. indicates quantities this contract on next sheet. 1(1 (13 56' Basement SS. /n Alley Q Build Reinforced Conc. Sewer Pipe , Phase / No. Size Description 2 3 4 5 6 7 8 8 60"x 360 /52 33; /5x 33, /5'X 30, /8;/6, /8,rr 42, /5,rr 26 , 18 328 /8'x /5' Spec. MH. Ab 2 to Specie/ MH. No. / Curb /n/et Na 2 to Curb /n/et No. / Curb Inlet No. 3 to Curb In/et No 4 Curb Inlet No. 4 to Curb /n/et No.5 Curb In/et No. 5 to Junction Box 4t / Junction fax No. / to 60'RCP(Top 6 Cb/hr) Curb /n/et No.6 to Spec/a/ MH No. 2 Stub from Junction Box lto. /, Phase / Structure Preparation , Phase / Sta. /007134, 2/'Lt. - Existing 8‘x 3' Conc. Box Cu/vert Remove Endwells E 2' of Borrel S &pose Steel Water Man Adjustment, Phase / Sta.. /007" 29, 20'Rt.-8 "Water Main to be lowered to `L /9033 /8 LF of 8 D/ Pipe, 4-8 45°E/bows, 2 -Reinforced Conc' Anchorage & 2- Thrust B/ks. Phase / pSta. /007t33.5,20'Rt-fbnove Fire Hydrant 6 WiveC Relocate to SYa /007'50, Rt Phase / Water Service Adjustments, Phase / Sta. /007178, •Lt. 20' Ste. /008096, Lt 20' Sta.. /009" 87, Lt 20' SYo. /0/ /t 431 . Gas Main Adjustments, Phase / S/o. /007"30,L1 6 Rt. Sto. 10/1 t CQ, Note:Gas Main Relocations to be determined. by Gas Company. Remove Drainage Culvert d So/voge for City, Phase / Sta. /0/01' 65, 22IRt. - /2“CMPx26' Mi&asel, Build / ea -/8” PiPe P/ug /5' N of function Box N2 / P/ . ._ SYa....1007.106' SOK../.9.(a VC 0 ............... Sta...100.7 t 50:. 1/0 0... /9/4 .19/.2 /9/0 /908 Eayst.: Conc. Box Cu/vert /906 /904 • • co c0 : 'of co A 143 h 00250 %.... P/ Sta. /0/11 10_ E/ev.-/9,/1.YOQ vc :o tM End Phase / Begin Phase II - PIMA Southeast Oromage....Improvement M-.330:(48)phose./ SWO.../98,5.-1' OiSCRfPTt •De%wore.•. Ave-•D...Str 1o.'•..G...Sir DSGN BT 0/sson.. hhstin9s- City Engineering CONTRACTOR Assoc. L;.✓....Webb ani -5/30/85 DAN $Y -S KP ASOWLTS .I/B5 DAN .NO Ho /z E N_ 24> Vert - i"=2 60" C6 RCP '0" //O% •• cos /007/00 t//.5 /50 ti /008000 150 •a 14, w V q z 14 kl SI I 'a O 4- /009100 t50 /0/0000 HIGHWAY F[OENAI A10 SHEET PLATE 1 -SINGLE PLAN AND PROFILE•ruLL DOT xTtLmtr4 •RINT[O IN U.S.A. 057 t66 t72 NOW. Not - to =»/e (Dist. 1s 42.09 of 00024. '0.342%. Proposed Grade /9/4 /9/2 Existing : Grade ro cfs >r 0 CA• 0........... /8 `Pipe P/ug . '0.5/3 % /8%16 RCP /9/0 /0//0OO /908 "50 /906 /0/2 000 W 0 to m CC 0 NOTE BOOK 0 z W 1— T m W —J W O OC CL. 0 O 0 0 0 Z z /0/2/00 /0/3/00 /0/4/OO /0/5'00 et De%wore Avenue ' i 4/0 5 De/aware 1 -Story Wd. Fr. b 0 4065 Del /-- Story Wd Fr 0 Q Q 7D R/W NO SS 402 S. Det /- Story WdFr 495' O O /62• O/tcontinue0 Cos 4bh /90804 Top Mo/n Conc. m /5' --n 205 39' 4/3 5 De/aware /-Story Wd. Fr. SS h A/tep 0 9 40/ 5 De/aware /-Story Wd Fr Delaware Avenue "B" Street to "C" Street ° Total pipe excavation 170 C.Y. Pipe Displacement 48 C.Y. Fill 122 C.Y. x 1.25 = 152 C.Y. NO SS Gra i 603E B O Build Curb /n/et, Pion No. 443-R2 No Station Side "Y" TC E/ev. fL 7 /0/4 t 26 39.5 Rt. 6' /3.8/ 9.93 8 /0/4+ 60 39.5' Rt /8' /3.80 /0.09 9 /0/4t 04 /7.5' Rt. 6' /340 9.53 /0 /0/4/04 /7.5' Lt.. 6' /3.57 9.53 // /0/4+26.5 39' Lt. 6' /3./4 9.68 /2 /0/4t 59 39' Lt. 6' /3l/9.84 /3 /0/4. 82.5 /8' Lt. /2' /3.6/ /0.44 Gos Service Adjustments Sta. 101460 Sta. /012+08 Sta. /0/2+72 Sto. /0/34.49 • O Build ✓unct/on Box No. Sto. S/ze C Top / /0/4+04 3x3' 933 1170 Adjust to Grode to ( 13,26 /" Water Service Adjustment Sto. /0//43 20 LF Sto /0/24.09 20 LF. Sto. /0/2+68 2OLF. Sto. /0/2+72 2OLF Sto. /0/3170 20 LF. Water Ma/pAdjustmepts Sidewalk y/ // J Buld 47. V 7 i 4 Removo Sto. Side So F4.. /0/4 t 08 2/ Rt 25 /" Water Service Adjustment Sto. /0//43 20 LF Sto /0/24.09 20 LF. Sto. /0/2+68 2OLF. Sto. /0/2+72 2OLF Sto. /0/3170 20 LF. Water Ma/pAdjustmepts Sidewalk, Plan No, 30/-R2 y/ // J Buld 47. Sto. Shia Sq. Ft. /0/4t 08 2/'Rt 25 /" Water Service Adjustment Sto. /0//43 20 LF Sto /0/24.09 20 LF. Sto. /0/2+68 2OLF. Sto. /0/2+72 2OLF Sto. /0/3170 20 LF. Water Ma/pAdjustmepts 547 .'ide 1. F 4.( e ION 4`049 1T `Nt gO ''_ Cu/n//u6tud_f111 Gas Main Adjustment Sta. /0/4.048 39' Li Ste. /0/4148 39 R/. Sto. /0/4+04 /7 R1 Sta. /0/4+04 /0' Lt. Note: Gos Main Relocation or Adjustment by Gos Company. K Build Reinforced Conc. Sewer Pipe No. Size Description 8 /81x280' „ Sto. /0//4 24 . to Junction Box No. / (See C St. and Delaware Ave. sheet) 9 /8 x /7 ✓unction Box to Curb /n/et No. 9 /0 /8'x /7' Junction Box to Curb /n/et No. /0 // /8"x 30' Curb /net No. /0 to Curb /n/et No. // /2 /8"x 33' Curb /n/et No. // to Curb /n/et No. /2 /3 /51:x 30' Curb /n/et No. /2 to Curb /n/et No. /3 /4 18 5( 30' Curb /n/et No. 9 to Curb /n/et No. 7 /5 /5"x 33' Curb /n/et No. 7 to Curb /n/et No. 8 P1 Sto /013/ 00 Rlp::E1.4y /912.:35' VC. ..50 F6 W, SCALE '. Hartz = /'120' Vert s /'=2 /9/4 /9/2 /9/0 /908 (0:3'3'3 -4 r Proposed Grade EX%St%n¢ Grade. I4 /9/4 • Cal CyJ p •«i h Cyt /0/2'00 /50 N /0/3t00 A. N cis !N /50 / 0/4/00 t08 /9/2 /9/0 /908 Ji F'j1f 1275 +455 /58.5 •e /0/5/00 HIGHWAY IADLRAL Alb INLET PLATE 1 -SINGLE PLAN AND PROFILE•rutt. DoT leTamnf IRINTIM IN U.S.A. PROJ. Southeast Drainage improvement PRO1 NO. /H-330(48) Phose1T SW /9854 DESCRIPTION Delaware Ave.- B Sir to C SYr Hastings City Engineering DSGN BY Olsson Assoc DATE 3/26/86 CONTRACTOR R. ORN BY SKP APPRD 8Y A ASBUIITS DRN NO 8 of 16- SCALE '. Hartz = /'120' Vert s /'=2 /9/4 /9/2 /9/0 /908 (0:3'3'3 -4 r Proposed Grade EX%St%n¢ Grade. I4 /9/4 • Cal CyJ p •«i h Cyt /0/2'00 /50 N /0/3t00 A. N cis !N /50 / 0/4/00 t08 /9/2 /9/0 /908 Ji F'j1f 1275 +455 /58.5 •e /0/5/00 HIGHWAY IADLRAL Alb INLET PLATE 1 -SINGLE PLAN AND PROFILE•rutt. DoT leTamnf IRINTIM IN U.S.A. . Pk4&E + 4'ei plan', AR..3: r,t OPE-`4ti`!C-i AS S4,�v-t'-4 X MAW #=0;.a 09E1'4I 1v_, TO ice, I" FT t"OFM x.% U0113T 4 SEAL -ER , R0:11.-0 Tc)P 4 E 9-4.1•'VIE=1 FOP, S iE...:Ei - AR3_.NrJ Fes: NiE OrEN+NG --MAl�11'G' F a N arc-. u S- 1-'t>:-?) ✓f tPP 'vEt%' • cT vit-AVrMEN{" 1 F , q r)8 rt :104 4' (4r. G !., j34 j . ?Co (w'), 5't.Jk5 "g= A. 5 G` o'-23/4) _ _o'' i ( \ 4 I 1 8'-0" J 1 , -- T Y00"¢ MI -I N * (ONLY) SECTION A - A 1/4 PLAN VIEW. DETAILS FOR SPECIAL MA1H )LES No. 2,41 5 AND Cp fiS• E.-1 MAN sirFIN6s1ES COVER NEE NAA -I R-1773 Gc At'FPC. .7 E!t�At� f�' 1."\'IC,K l [ -r/ °oF MANHVAL (i1✓AP' r MANW014 MtelNiCOYEIUTAit, NOT TO ecat-e i Vvft a 4 r7 EMP& tiYI,i Ar0U149 O9E;i?tor1 -�-� �1 V�• AhCH /t (o --ti.. 1/4OY (00`14) PiT9F�"- SCy. EMO& 6 �e1u, ` ' ¢ &K'7L i2"O,G. VERT. eXFrr. —4- ONO. flkW 4(7. 9h0(/^f -s&' y5 Pp e ' .f',SL?o406•to W MOTS_ ?: •,-.•.;:- \'11-CH'IE'/ )K• ,] fI - �f`X % iHEJ iV . „_- (..- t b- T' y e"w �•.; t t , ♦t Nr 1 ;-Of !Nro9MN:ro14 ON .i^.;,iNr1; 0'x,1 CO,No. f^X C:.a. N✓3RT sir... p.c. ;=,. arA1--:tt2r^-AFW' . ..AU 1.9'22 -,4i -R2 PLAIN' 4 t- G. ) eocrs,�n .,,. > a'f ? E- 5090 v' 'l u/ i 1/AST1Nei; eTTOR\''E 51-2.W • •c 5gC1t�toN c -c Ex . 3' ;c1)--)' _ t' - PEPir3U ;Y' O "5'x ° LAX -1,r-AT D''.' 122E?=tf.-1:7`,/ r'1F1�==t `t7 c.-)174,11)AF:.; IT'it.E! C VEK N -71-f-; fitE i. & G, .^y^.? N‘ ;2 i '1 !i ,t L/FTJNC DEVee 2 REVORZTO,, ^I' SEE DE7ML 77/5S//AET {.: 6L /967.43 ' 5,19:8.43 1 (110593 z#55 A SHOWN SECTION t - E -111151K-- IAd ii ill- F N'4 & CbV /9/2.85 TC --\ kiettiA1-4 M77-3 OR A?f'TodeD ertR AD IS" 511W ARD Ht?. i " MANHOLE FRAME AND CQqVER NEENAH R-1773 OR APPR'D. EQUAL. • e; 10 SECTION F- F .LIF T�A!d /)/Y/CEl T/2/2 NOT ry SCJ 7 JOINT SEALING FILLER (HOT POURED TYPE) 9" 8" I"PREFORMEO EXPANSION• JOINT FILLER CO I" PREFORMED EXPANSION JOINT FILLER SHALL BE PLACED THRU THE CURB AT INTERVALS OF NOT MORE THAN 100'. CONCRETE BARRIER CURB QUANTITY PER STA. CONCRETE 4.548 CU. YDS. \AREA 1.228 SQ. FT. JO'YNT SEALING FILLER (HOT POURED TYPE) I" PREFORMED EXPANSION JOINT FILLER EXPANSION JOINT THRU CURB DETAIL _FOR CUTTING EXPANSION JOINT FILLER JOINT SEALING FILLER \1 (HOT POURED TYPE)•.. co } I" PREFORMED EXPANSION JOINT FILLER CO CONCRETE MEDIAN CURB �4 (2 "MIN.) QUANTITY PER STA. CONCRETE 4.370 CU. YDS. AREA 1.180 SQ. FT. Y , 4 M/N. ---/ Ig"MIN. SAW CUT x Yp JOINT FILLER RESERVOIR CONTRACTION JOINT THRU CURB & COMBINATION CURB AND GUTTER /'- O" ` mss'• 9 1 4 / INTEGRAL CONCRETE CURB QUANTITY PER STA. CONCRETE 0.948 CU. YDS. AREA 0.256 SQ. FT. • 1 R X A 5 3.32 0.49 6 3.61 0.57 7 3.87 0.64 8 4.12 0.70 9 4.36 0.79 10 4.58 0.84 11 4.80 0.85 l2 5.00 0.98 13 5.20 /.07 14 5.39 1.14 15 5.57 1.22 /6 5.75 /.27 17 5.92 /.29 18 6.08 1.3/ 19 6.25 1.33 20 6.40 /.40 BACK OF CURB EXCLUDE AREA A WHEN COMPUTING SO. YDS. OF CONCRETE DRIVEWAY BACK OF CURB. I" PREFORMED EXPANSION JOINT FILLER SHALL BE PLACED THRU THE CURB AT INTERVALS OF NOT MORE THAN 100'. JOINT SEALING FILLER (HOT POURED TYPE) -0" 1" PREFORMED EXPANSION 9 . JOINT FILLER CONCRETE CURB TYPE I QUANTITY PER STA. CONCRETE AREA ' THIS AREA TO BE ROUGHENED AND CURED BY A METHOD OTHER THAN A MEMBRANE CURING COMPOUND PRIOR TO PLACEMENT OF CURB. 5.216 CU. YDS. L 408 SQ:' FT. 0" 3/4 e CONCRETE PAVEMENT • c e N°5x8'<DOWEL BARS AT 51-0" CENTERS co TOP OF CURB 9 X B 0" CONCRETE DRIVEWAY A GUTTER LINE A PLAN fi GUTTER LINE ELEVATION DETAILS OF _CONCRETE DRIVEWAY N°4 LONGITUDINAL BAR INTEGRAL CONCRETE CURB (ALTERNATE TYPE ) 2 c . a a • a 3/4" BOARD. TO BE LEFT IN PLACE CONCRETE HEADER QUANTITY PER LIN. FT CONCRETE 0025 CU. YDS. INTEGRAL CONCRETE BARRIER CURB TO BE USED AT GUARD RAIL INSTALLATIONS OR WHERE SHOWN ON THE PLANS. a c V t 9" 8" /,-0„ SHEET OF JOINT SEALING FILLER • (HOT POURED TrPE) •1 PREFORMED EXPANSION JOINT FILLER SECTION A -A I,-0" ••JOINT SEALING FILLER ,(NOT POURED TYPE) INTEGRAL CURB v U 1 PREFORMED EXPANSION JOINT FILLER g SECTION B- B (0 DETAIL OF RURAL DRIVEWAY N 1 9 BARRIER CURB DETAIL OF CURB DROPS INTEGRAL CONCRETE CURB (BARRIER TYPE) QUANTITY PER STA. CONCRETE 1.307 CU. YDS. AREA 0.353 SQ. FT :N R2 R/ REV. No JAN. 80 JAN 75 DATE MULTIPLE REVISIONS CONTRACTION JOINT THRU CURB DESCRIPTION OF REVISION 'NEBRASKA DEPARTMENT OF ROADS STANDARD PLAN N° 301 PAVEMENT DETAILS APPROVED ' JANUARY 31, 1974 DATE ROADWAY DESIGN" ENGINEER SCALE AS SHOWN 6" VARIABLE CROSSWALK SLOPE TOWARDS STREET 0.021/ FT. VARIABLE SIDEWALK THIS SLOPE MAY BE VARIED TO CONFORM WITH MUNICIPAL REGULATIONS. 6" VARIABLE N°5x18" TIE BARS AT 48"CENTERS TO BE. DRILLED AND GROUTED INTO • • EXISTING SLAB. DRIVEWAY ONE INCH PREFORMED EXPANSION JOINT FILLER SHALL BE PLACED IN ALL SIDEWALK OR CROSSWALK AT INTERVALS OF NOT MORE THAN C:11-011 AND AT ALL POINTS WHERE SIDEWALKS OR CROSSWALKS BUTT AGA/NST CURB. IF SIDE- WALK OR CROSSWALK TO BE CONSTRUCTED IS LESS THAN 50'-0" IN LENGTH ONE SUCH EXPANSION JOINT SHALL BE PLACED AS DIRECTED BY THE ENGINEER. Q 'ASPHALTIC CONCRETE I i2 9 2EXISTING�-- SLAB \" VARIABLE v • CONCRETE BASE COURSE `V INTEGRAL CURB NOTE: "T"= PAVEMENT THICKNESS N° 5 x18" TIE BARS AT 48" CENTERS TO BE DRILLED AND GROUTED INTO EXISTING SLAB. • EXISTING SLAB 11-0" 4 (0 VARIABLE, CO q CONCRETE PAVEMENT W/ INTEGRAL CURB 1/4 i 1 VAR/ABLE JOINT SEALING FILLER (HOT POURED TYPE) SLOPE 0.021/ FT. SLOPE 0.021/ FT. - 1"PREFORMED EXPANSION JOINT FILLER - L ------1. — DETAILS OF CONCRETE MEDIAN SURFACING ONE INCH PREFORMED EXPANSION JOINT FILLER SHALL BE PLACED THRU MED/AN SURFACING AT INTERVALS OF NOT MORE THAN 491-0f LONGITUDINAL JOINTS ONE /NCH DEEP SHALL BE MADE IN ALL MED/ANS WHEN SURFACING WIDTH /S /61 OR GREATER. TRANSVERSE JOINTS ONE INCH DEEP SHALL BE MADE IN ALL MEDIANS AT INTERVALS OF NOT MORE THAN 81 TRANSVERSE AND LONGITUDINAL JOINT SHALL NOT BE FILLED. ONE -INCH PREFORMED EXPANSION JOINT FILLER SHALL BE PLACED AT INTERSECTION RETURNS AND WHERE SHOWN ON THE PLANS. TRANSVERSE JOINTS SHALL BE PROVIDED EVERY 8 FEET OR WHERE SHOWN ON THE PLANS. CONTRACTION AND EXPANSION JOINTS SHALL 8E CONSTRUCTED TO MATCH LOCATIONS OF EXISTING JOINTS VARIABLE 3' -6" MAX. DETAIIILFO-R-- UTTING EXPANSION JOINT FILLER 4o( r X0, -OY , J VARIABLE 3'- 6" MAX. COMBINATION CONCRETE CURB & GUTTER D I " PREFORMED EXPANSION• JOINT FILLER 41 MIN. LENGTH AS SHOWN ON PLANS PLAN • •CONCRETE ISLAND NOSE 0 TOP OF SLAB• CONCRETE PAVEMENT SECTION D—D DETAILS OF CONCRETE ISLAND NOSE EXISTING CONCRETE PAVEMENT IS TO BE REMOVED IN AREA COVERED BY CONCRETE ISLAND NOSE. I" PREFORMED EXPANSION• JOINT FILLER 4"MEDIAN SURFACING• PLAN El' -6" 4' M/N. I" PREFORMED EXPANSION JOINT FILLER l 0 NOTE' "T"= PAVEMENT THICKNESS SECTION G — G DETAIL AT END OF MEDIAN ISLAND F SECTION E— E 1 SECTION F— F R2 JAN. 80 MULTIPLE REVISIONS R/ JAN. 75 CONTRACTION JOINT-THRU CURB REV. N 0 DATE DESCRIPTION OF REVISION NEBRASKA DEPARTMENT OF ROADS STANDARD PLAN N° 301/ PAVEMENT DETAILS APPROVED : JANUARY 31, 1974 DATE ROADWAY DESIGN ENGINEER, SCALE AS SHOWN 3"-0" '••INTEGRAL CURB VAR. 0.027 FT. 46"-0"TO 52 "-0" CONCRETE PAVEMENT 12'-0" •••LONG/TUDINAL JOINT /2"-0" VAR. • LONGITUDINAL JOINT • • - - 0.02 "/ FT. INTEGRAL CURB•'. 26"-0" CONCRETE PAVEMENT •INTEGRAL CURB /3"-0" FOUNDATION COURSE (IF CALLED FOR IN THE PLANS) MED/AN, VARIABLE /6"-0"NORMAL • LONGITUDINAL JOINT• 0.027 FT. 13 '-O" /NTEGRAL CURB • •' 26"-0" CONCRETE PAVEMENT /3 '-0" ••••FOUNDAT/ON COURSE (IF CALLED FOR IN THE PLANS) Vs" MIN. -••• JOINT SEAL/NG FILLER N (2 MIN.).'.• r: -• • • 4 • 15" 4 • 15 ° • d O O l ..•N°5x2"-6" TIE BARS @ 48" CTRS. •• TIE BAR PINS • SAWED WHEN TWO ADJACENT LANES ARE PLACED AT THE SAME TIME, THE LONGITUDINAL JOINT COMMON TO THE TWO LANES SHALL BE SAWED. %a" MIN. •-"JOINT SEALING FILLER ''••N°5x2"-6" TIE BARS 0 48" CTRS. • -• TIE BAR PINS No 5 HOOK AND W -BARS MAY BE USED IN LIEU OF THE TIE BARS AND TIE BAR PINS SHOWN. KEY TYPE / KEY TYPE JOINT SHALL BE USED ON ALL LONGITUDINAL CONS-TRUCTION JOINTS WHEN THE ADJACENT -LANE IS NOT PLACED AT THE SAME TIME. LONGITUDINAL JOINTS .' •INTEGRAL CURB 0.02/ FT. .•-tONG/TUDINAL JOINT INTEGRAL CURB ••. 3 TYPICAL CROSS SECTIONS 3/8n ••••'✓0/NT SEAL/NG FILLER v V d a . T/4 (2"MIN.1 1/4"MIN. ti V v CONTRACTION JOINTS SHALL BE SAWED AND SHALL BE PLACED AT RANDOM JOINT SPACING INTERVALS OF 19"- 18" PERPENDICULAR TO THE LONGITUDINAL JOINT. CONTRACTIQN JOINT N '-FOUNDATION COURSE (/F CALLED FOR IN THE PLANS) iNo4 SPACER. BARS WELDED 9"MAX. CLEARANCE FROM EDGE OF SLAB i DIRECTION OF PLACEMENT) 3/8.. --JOINT SEAL/NG F/LLER • 12 GAGE CHAIR•' MINIMUM OF 5 CHAIRS PLACED AT UNIFORM INTERVALS SHALL BE USED FOR EACH 13" LANE. 51/2". U 1 i 1 l"/x 18" DOWEL BAR T=6"TO8" I1/4", x 18" DOWEL BAR T OVER 8" • GREASE THIS SIDE ONLY DOWEL BARS SHALL BE SPACED AT l' -O" CTRS. EXCEPT THAT THE 'DOWEL BAR AT THE OUTSIDE END OF ASSEMBLY SHALL BE PLACED A MINIMUM OF 9%2" FROM THE EDGE OF THE SLAB. CONSTRUCTION JOINT REV. N0 DATE DESCRIPTION OF REVISION NEBRA'SK'A DEPARTMENT OF ROADS STAN DAkD PLAN No 331 6 t 10."1 74 I , CQNCRETE. PAV E M E IT .�" CURB. APPROVED MARCH 1911975 D At;E .". ROADWAY DESIGN ENGINEER 'SCALE .` AS SHOWN(' ti 0 . •N°4 SPACER BARS hl I I rata.l rarrissiarstral 1,_0" 1,-0" /,_0" „ /,-0" /,-0" illMona am, /,_O„ T -i 13 —0" /'_O" „ „ • MINIMUM OF 5 CHAIRS SPACED AT UNIFORM INTERVALS DOWEL BARS -I" TEMPORARY FILLER • .••.. •MINIMUM OF 5 CHAIRS SPACED AT UNIFORM INTERVALS ASSEMBLY PLAN x• • •GRADE ELEV. O O O 0.02'/FT. O 0 12'—II" 5" 5" PREFO1RMED EXPANSION JOINT FILLER _ru-7„ 2 V •• —GRADE ELEV. 0.02/ FT. II GAGE'SHEET METAL JOINT SEALING FILLER •••••. METAL. HOLDER DIRECTION OF PLACEMENT .1"P x 18" DOWEL BAR T= 6" TO 8" 1%" 0x 18"DOWEL BAR T = OVER 8" C '•'n „ • .•••N° 4 SPACER BAR WIRED / N°4 SPACER BAR WELDED,:•••' ••12 GAGE CHAIR •..•. SECTION' ..—METAL HOLDER GREASE DOWEL BAR ON EXPANSION TUBE SIDE ONLY. 'METAL HOLDER IN PLACE I" PREFORMED EXPANSION JOINT FILLER SHALL BE USED FOR EXPANSION JOINTS UNLESS OTHERWISE SPECIFIED IN THE PLANS. EXPANSION JOINTS SHALL BE INSTALLED AT LOCATIONS SHOWN IN THE PLANS AND 3 EXPANSION JOINTS SPACED AT 45'-0" INTERVALS SHALL BE INSTALLED IN EACH SECTION OF PAVEMENT ADJACENT TO RAILROAD TRACKS. STANDARD SLUE PRINT. OMAHA 040374 EXPANSION JOINT END CUT AND BENT... 1„ STOP LUGS,.... l%6"T=6"T08" } l5/6 T=OVER 8" 4" EXPANSION TUBE 4 00 / /6 GAGE METAL— CO \I 0 ti C W 0 n :•30° MAX-. t i" SPOT WELD'-• 9/6„ SPOT WELD•••-•»• 12 GAGE METAL PLATE ti 6" SQUARE N TIE BAR PIN T NOTES 12 GAGE METAL• 03 cc CHAIR THE CONTRACTOR MAY SUBSTITUTE OTHER DESIGNS FOR EXPANSION AND CONTRACTION JOINT SUPPORTS IN LIEU OF THE TYPE SHOWN WITH PRIOR WRITTEN APPROVAL BY THE ENGINEER. DOWEL BARS SHALL BE A MINIMUM OF /7%"IN LENGTH. TIE BARS SHALL BE DEFORMED BARS AND ALL OTHER BARS SHALL BE SMOOTH. FOR LOAD TRANSFER DEVICES AT EXPANSION JOINTS IN LANES OTHER THAN THE 13 FT. LANES SHOWN, MAINTAIN THE SPACING OF THE 18" DOWEL BARS AT I FT. INTERVALS. THE ENDS OF THE N° 4 SPACER BARS SHALL NOT BE MORE THAN 3 INCHES FROM THE EDGE OF THE PAVEMENT OR LONGITUDINAL JOINT. THE CONTRACTOR MAY USE A MACHINE FOR PLACING THE LONGITUDINAL TIE BARS IN LIEU OF THE,TIE BAR PINS. IF A MECHANICAL TIE BAR PLACEMENT MACHINE IS NOT USED, TIE BAR PINS AS SHOWN WILL BE USED_ TIE, DOWEL AND SPACER BARS SHALL CONFORM TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS.. KEY TYPE LONGITUDINAL JOINTS AND TRANSVERSE CONSTRUCTION JOINTS SHALL BE EDGED WITH 1/4" R. !A7 TIME OF CONCRETE PLACEMENT. NEBRASKA DEPARTMENT OF ROADS 'STANDARD PLAN N° 331 6 +o 10 INCH CONCRETE, PAVEMENT w/ CURB APPROVED: MARCH 19, 1975 DATE • SCALE AS SHOWN` ROADWAY DESIGN ENGINEER REV. N° DATE DESCRIPTION OF REVISION NEBRASKA DEPARTMENT OF ROADS 'STANDARD PLAN N° 331 6 +o 10 INCH CONCRETE, PAVEMENT w/ CURB APPROVED: MARCH 19, 1975 DATE • SCALE AS SHOWN` ROADWAY DESIGN ENGINEER NOTES: 1. Excavation and backfilling required for the installation of reinforced concrete pipe, inlets, manholes, junctionboxes, etc. shall not be paid for directly but shall be considered subsidiary to the bid price per lineal foot of pipe. Borrow required for embankment or cover on sections of the project shall be obtained from surplus excavation on other locations within the project limits or shall be obtained from the City's earth stockpile site located at "B" Street and Colorado Avenue. Any earth waste shall be stored at same location. The transportation of all borrow required shall be considered subsidiary to the bid items as so previously referenced. Any trees that need to be removed or relocated will be made by the City of Hastings Parks Department. All streets affected on this project shall be graded by the Contractor to a rural design section to the proposed centerline elevations as shown on the cross sections or as staked in the field by the Engineer to provide for positive drainage into the new system after pipe installation. This work shall be paid for as General Street Grading lump sum. Gravel shall be paid for installed on a per cubic yard basis. 2. All concrete pavement shall be 6" P.C.C. Type 47B. Excavation, subgrade compaction, sawing, keyway, control joints, dowel pins, rubberized joint sealant shall be considered subsidiary to the unit price per square yard. 3. Excavation shall conform to lines and grades as shown on the plans. Compaction of backfill shall be made in conformance with Section 202 and 204 of the 1985 Standard State Specifications and its supplements. Percent Density 95 Min. Moisture Minimum Requirements Maximum Opt. -3% Opt. +3% Areas not meeting specified moisture density test requirements shall be removed and recompacted at the Contractor's expense. All compaction and water necessary for compaction shall not be paid directly but considered subsidiary to the bid items of the shall be 4. Water main adjustment per lineal fittings, any additional pipe necessary for of concrete thrust blocks. Any new main shall be C.I.P. match existing system. Water service adjustments are to be made as shown on the plans. All private water service adjustments shall be made by a licensed plumber with the City of Hastings, Nebraska as per City Code. Water service stops and boxes to be utilized shall be Ford B22 -444M 1" and EM2-55-56 Ford. All water service lines shall be 1" Type "K" Copper, or matching existing size. foot shall include 450 elbows, said adjustment and for contract. flanges, installation or D.I.P. to Sheet /5 of /5