HomeMy WebLinkAbout0905 Minutes for September 5, 2023 Adams County Board of Commissioners Meeting Minutes Tuesday,September 5,2023 at 9:30 am Courthouse,Adams County A regular meeting of the Adams County Board of Commissioners was held with Chairman Lee Hogan presiding. Motion by Stromer, seconded by Patterson that this is an open public meeting of the Adams County Board of Commissioners. Roll Call,Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None The Pledge of Allegiance was performed. Chairman Hogan inquired if there were any conflicts of interest. No conflict of interests were disclosed Roll was taken, roll call members present, Michael Stromer—District 1,Glen Larsen—District 2 Lee Hogan—District 3, Harold Johnson—District 4,Tim Reams- District 5,Chuck Neumann—District 6, Joe Patterson—District 7. Public notice of this meeting, including the public hearing, has been given by publication in the Hastings Tribune and by posting.The agenda was available to the board members and was kept continuously current and posted in the County Clerk's office,the main courthouse lobby and the Adams County website.The following is the agenda of items to be heard, no modifications were made to the agenda after 9:30 a.m.the business day prior to this meeting. Agenda for Meeting of Adams County Board of Commissioners County Board Room,Courthouse, 2nd Floor Date of Meeting. September 5. 2023 at 9:30 A. I. Chairman to request a motion that this is an open public meeting of the Adams County Board of Commissioners Announce location of Agenda & Open Meetings Law postings Reminder to turn off all cell phones Pledge of Allegiance Conflicts of Interest Roll call: Approval of consent agenda items: • Minutes from previous meeting • Claims • Monthly Report of Single Bank Pooled Collateral • Recognize disbursement of HRA funds from the Healthcare Fund(l25) for First Concord for deductible buydown • Miscellaneous Receipts • Officer Reports Receive Conunents from the Public: Jacki Norris—Request chanman s signature on deobligation letter from Grant*l06- 02_2-VA103S YR 2 for the Nebraska Commissioner on Law enforcement& Criminal Justice Michael Stromer—Request approval of a $826.017.52 dispursement from the jail bond fund to Beckenhauer Construction. Inc: as reconunended by Prochaska & Associates, Greg Schmidt—Present for discussion and possible approval: an agreement between Adams County and Werner Construction for 2023 concrete paving: Hayland Avenue and 82nd Street Present for discussion and possible approval.Resolution 2023-09-0501. allowing the chairman to sign the Statewide Stop Sign Program. Present for chairman's signature the LPA Agreement for statewide upgrading of existing stop sign locations of rural roads Review of bids and possible award to purchase a tractor and rotary mower Personnel Committee—Discussion on county employee payroll structure Closed Session—For the protection of the public interest:contract negotiations This agenda is subject to amending until 9:30 AM on the Monday preceding the Board meeting. Note to Citizens:Any agenda item may be moved down at any tune at the discretion of the Chairman of the Board of C onunissioners_ Last updated on September 1.2023 at 11:39 am For non-English speaking attendees wishing to arrange for a sign language or foreign language interpreter.please call or fax the County Attorneys office at Phone:40246I-7240 or Fax:402461-7241. For hearing-impaired individuals or individuals with other special needs call or fax the County Clerk's Office at Phone:402 461-7107.or TTY:-202 461-7166 or Fax:402-461-7185. When requesting an interpreter or services for the hearing unpaired.please provide at least forty-eight(48)hours advance notice to allow time for making the accommodations. The Board reserves the right to go into executive session if such session is clearly necessary for the protection of the public interest or for the prevention of needless injury to the reputation of an individual. Chairman Hogan requested a motion to approve consent agenda items including: • Minutes from the 8/15/2023 meeting • Claims to be paid by the Adams County Clerk from respective accounts • Officer reports from the sheriff, register of deeds and clerk of the district court Motion by Johnson, seconded by Stromer to approve all consent agenda items. Roll Call,Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None Chairman Hogan opened the meeting to receive comments from the public. No public comments were received. Motion by Stromer,seconded by Reams to approve a $826,047.52 disbursement from the jail bond fund payable to Beckenhauer Construction,as recommended by Prochaska and Associates. Roll Call,Ayes: Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None TRANSMITTAL Planning • Architecture • Engineering •Interiors • Facility Management TO: Ramona Thomas PROJECT: Adams County Justice County Clerk Center Adams County Courthouse 500 W.4`"St., Suite 109 Hastings.NE 68901-7657 FROM: William R.Huey Ill PROJECT NO.: 201711 DATE: August 30,2023 SUBJECT: Pay Application No. 16 i For Approval = For Your Information ■ For Your Review No Exceptions Taken 7 For Distribution = For Review and Comment • Approval for Payment - Shop Drawings Reviewed ■ Return_1_Signed Copy(s) ■ For Your Files E. Deposit Check Returned = Return of Plans Ms.Thomas. Attached, you will find one original Owner's copy and one Construction Manager's copy of Beckenhauer Construction, Inc's., Application for Payment No.16. This request has been reviewed and signed. Prochaska & Associates recommends payment in the amount of $826,047.52. After the Board of Commissioners' final review, please distribute the Construction Manager's copy to Beckenhauer Construction.Inc.,with payment,and keep the Owner's copy for your files. Sincerely. Prochaska&Associates Highway co-superintendent, Greg Schmidt, presented the board with a contract with Werner Construction for 2023 concrete paving at Hayland Avenue and 82nd Street.The bid was awarded to Werner during the August 1, 2023 meeting.Schmidt has reviewed the contract and is recommending approval. Motion by Neumann, seconded by Patterson to approve the contract with Werner Construction for 2023 concrete paving at Hayland Avenue and 82' Street. Roll Call,Ayes:Stromer, Larsen, Hogan, Johnson, Reams, Neumann, Patterson Nays: None Absent: None AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) THIS AGREEMENT is by and between Adams County,Nebraska ("Owner")and Werner Construction, Inc.,P.O.Box 1087,Hastings,NE 68902-1087 ("Contractor"). Owner and Contractor hereby agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Project includes traffic control, roadway grading, culvert pipe replacement, subgrade preparation, foundation course, approx. 21,000 square yards of 10" doweled concrete pavement,seeding,and associated work. ARTICLE 2—THE PROJECT 2.01 The Project,of which the Work under the Contract Documents is a part,is generally described as follows: 2023 Concrete Paving—Hayland Avenue and 82nd Street Adams County,Nebraska OCE#14-C-12 ARTICLE 3—ENGINEER 3.01 The part of the Project that pertains to the Work has been designed by Oak Creek Engineering, P.O. Box 1209,Kearney,NE 68848. 3.02 The Owner will name an Engineer to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4--CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any,Substantial Completion,and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times:Dates A. The Work will be substantially completed on or before August 15,2024,and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before September 1,2024. B. Contractor will be allowed 16 calendar weeks to complete construction. Calendar week count begins when road is closed to traffic. If road closure exceeds the calendar week time EJCDCC C-520(Rev.1),Agreement Between Owner and Contractor for Construction Contract(Stipulated Price). Copyright 6>2013 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of CMI Engineers.All rights reserved. Page 1 of 7 limit,liquidated damages as described in Paragraph 4,03.A.1.shall apply for each day after time limit. 4.03 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above,plus any extensions thereof allowed in accordance with the Contract.The parties also recognize the delays,expense,and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time.Accordingly,instead of requiring any such proof,Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion:Contractor shall pay Owner$1.000 for each day that expires after the time(as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor stall neglect,refuse,or fail to complete the remaining Work within the Contract Times(as duly adjusted pursuant to the Contract) for completion and readiness for final payment,Contractor shall pay Owner 5_,L-iM0 for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently. ARTICLE S—CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amount that follows,subject to adjustment under the Contract: A. For all Work,at the prices stated in Contractor's Bid,attached hereto as an exhibit. ARTICLE 6—PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions.Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments;Retainage A. Owner shall make monthly progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment during performance of the Work as provided in Paragraph 6.02.A.1 below,provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract.All such payments will be measured by the Schedule of Values established as provided in the General Conditions(and in the case of Unit Price Work based on the number of units completed)or,in the event there is no Schedule of Values,as provided elsewhere in the Contract. 1. Prior to Substantial Completion,progress payments will be made in an amount equal to the percentage indicated below but,in each case,less the aggregate of payments MTV C-sin(Raw lL Agreement Schwan Owner and ContrectorforContrrslbn Contract(Stipulated Prkai.. Copyright 0 2013 ea n ora Sodety 04 Pmofeolo al tnyateers,Amanitae Card)or EoPMrurinS ComPriaMir and Mexican Sudety of CM EngY1esR Alt rights merged Page 2 et previously made and less such amounts as Owner may withhold,including but not limited to liquidated damages,in accordance with the Contract a. 2Q percent of Work completed(with the balance being retainage).If the Work has been 50 percent completed as determined by Engineer,and if the character and progress of the Work have been satisfactory to Owner and Engineer,then as long as the character and progress of the Work remain satisfactory to Owner and Engineer,there will be no additional retainage;and b. 2Q percent of cost of materials and equipment not incorporated in the Work(with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed,less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions,and less 200 percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment. 6.03 Final Payment A. Upon final completion and acceptance of the Work In accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06. ARTICLE 7—INTEREST 7.01 All amounts not paid when due shall bear interest at the rate of 1.5 percent per annum or the maximum allowable rate by law. ARTICLE 8—CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce Owner to enter into this Contract, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents,and any data and reference items identified in the Contract Documents. B. Contractor has visited the Site,conducted a thorough,alert visual examination of the Site and adjacent areas,and become familiar with and is satisfied as to the general,local,and Site conditions that may affect cost,progress,and performance of the Work. C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost,progress,and performance of the Work. D. Contractor has carefully studied all:(1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions,especially with respect to Technical Data in such reports and drawings,and(2)reports and drawings relating to Hazardous Environmental Conditions,if any,at or adjacent to the Site that have been Identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings. E. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site;information and observations obtained from visits to the Site;the Contract Documents;and the Site-related reports and drawings identified in the Contract Documents,with respect to the effect of ucom c-sza lRe,ii.amen,em eetwon.,Winer and Contractor for Construction contract(Stiwd.tnd Price). Co►opyripx 0 2013 National Sudety at Protaaaol Engineers,Amedtrt Coad of Engineering CompoNet, end Amnio oSodety of dell Engineers.All rights reserved. Page of 7 such information,observations,and documents on(1)the cost,progress,and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor;and(3)Contractor's safety precautions and programs. F. Based on the information and observations referred to In the preceding paragraph, Contractor agrees that no further examinations,investigations,explorations,tests,studies, or data are necessary for the performance of the Work at the Contract Price,within the Contract Times,and in accordance with the other terms and conditions of the Contract. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents,and the written resolution thereof by Engineer is acceptable to Contractor. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 1. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement(C-520 pages j to 2 inclusive). 2. Performance bond(C-61.0 pages 1 to 3.,inclusive). 3. Payment bond(C-615 pages 1 to 3,inclusive). 4. Certificate of Insurance. 5. Other bonds. a. N/A (pages_to inclusive). 6. General Conditions(C-700 pages'to¢,5,inclusive). 7. Supplementary Conditions(C-80Q pages 1 to .,inclusive). 8. Specifications as listed in the table of contents of the Project Manual. 9. Drawings(not attached but Incorporated by reference) a. Consisting of 9 sheets with each sheet bearing the following general title: 2023 Concrete Paving-Hayland Avenue and 82w Street Adams County,NE OCE 1114-C-12 b. Standard Plans as indicated on the Title Sheet of the Drawings. 10. Addenda(numbers 1 to_1_,inclusive). 11. Exhibits to this Agreement(enumerated as follows): UM*C-520(Ree l),AQwrent demean Owner and Contractor kwD atnxWn Contract lsapolatedirlai.. Coppt&O 5013 NN6nat Satiety of Professing Engines,Wean=Cann ofEngkaadngCompanies, and Mrrkon Society of Ont netnews.Ni tights rawvad. Page 4 of 7 a. Contractor's Bid IC-410 pages 1 to 4 inclusive). 12. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed(C-550). b. Work Change Directives. c. Change Orders. d. Field Orders. B. The documents listed in Paragraph 9.01.A are attached to this Agreement(except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended,modified,or supplemented as provided in the General Conditions. ARTICLE 10—MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 10.02 Assignment of Contract A. Unless expressly agreed to elsewhere in the Contract,no assignment by a party hereto of any rights under or Interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound;and,specifically but without limitation,money that may become due and money that is due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. Owner and Contractor each binds itself,its successors,assigns,and legal representatives to the other party hereto,its successors,assigns,and legal representatives in respect to all covenants,agreements,and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken,and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 10.05 Contractor's Certifications A. Contractor certifies that it has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05: E3cpc c-5a0(Rev.1),Agreement Between Owner and Contractor for Contraction Contract(Stlpinted Rice). Condign O 5013 National Society aRoissbnat Engineers.American Condi of Engineering Companies, end AmwiwnSonny nf Ova Engineers.AB rights reserved. Hae Sot? 1. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner,(b)to establish Bid or Contract prices at artificial non-competitive levels,or(c) to deprive Owner of the benefits of free and open competition; 3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial,non-competitive levels;and 4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. IN WITNESS WHEREOF,Owner and Contractor have signed this Agreement. This Agreement will be effective on August 1,2023 (which is the Effective Date of the Contract). NOTE(S)TO USER: 1. See Article 21 of the Instructions to Bidders and correlate procedures for format and signing of the documents. 2. The Effective Date of the Contract stated above and the dates of any construction performance bond (E1CDC°C-610 or other) and construction payment bond(EJCDC•C-615 or other)should be the same,if possible. In no case should the date of any bonds be earlier then the Effective Date of the Contract. OWNER: CONTRACTOR: Adams County Nebraska Werner Construction,Inc. By: Lee Hogan By: / /� i(l �- lv¢,'n er_� LTi __.._ Authorized Signature Authorized� Signature Title: Chairman of the Board Title: 9/e-,s,d.e,J—_ (If Contractor is a corporation,a partnership,or a joint venture,attach evidence of authority to sign.) Attest: Attest: 9,/,..64.}1,L61.1.1,3:bkTitle: County Clerk Title: j d;e�t- `121-0—?. (17-1' Address for giving notices: Address for giving notices: Adams County Clerk Werner Construction,Inc. 500 W 4"'Street,Ste 109 P.O.Box 1087 Hastings,NE 68901 Hastings,NE 68902-1087 License No.: (where applicable) (If Owner is a corporation,attach evidence of authority NOTE TO USER: Use in those states or other to sign.If Owner is a public body,attach evidence of Jurisdictions where applicable or required. authority to sign and resolution or other documents authorizing execution of this Agreement) Schmidt presented the board with Resolution 2023-08-05.01 concurrent with an agreement with the State of Nebraska for the upgrading of existing stop signs in rural locations.Schmidt has reviewed the agreement and is requesting approval. Motion by Neumann, seconded by Reams to approve Resolution 2023-08-05.01 allowing the chairman to sign the agreement with the State of Nebraska. Roll Call,Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None RESOLUTION SIGNING OF THE PROJECT PROGRAM AGREEMENT Adams County Resolution No Whereas: Adams County is proposing a transportation project for which it would like to obtain Federal funds,and Whereas:Adams County understands that it must strictly follow all Federal,State.and Iota: laws,rules,regulations,policies,and guidelines applicable to the funding of the Federal-aid project.and Whereas: Adams County and Nebraska Department of Transportaton(NDOT)wish to enter into a new Project Program Agreement setting out the various duties and funding responsibilities for the Federal-aid project. Be It Resolved: by the Board of Supervisors of Adams County that: The Chair of the Adams County Board of Supervisors is hereby authorized to sign the attached Project Program Agreement between Adams County and NDOT. Adams County is committed to providing local funds for the project as required by the Project Program Agreement_ NDOT Project Number. HSIP-STWD(203) NDO1 Control Number 01063 NDOT Project Name. Statewide Stop Sign Program Adopted this day of .20 at Nebraska (Month) (Year) The Board of Supervisors of Adams County Board/Council Member_ Moved the adoption of said resolution Member Seconded the Motion Roll Call: Yes No Abstained Absent Resolution adopted-signed and billed as adopted Attest: Signature County Clerk LPA PROGRAM AGREEMENT Statewide Upgrading Existing STOP Sign Location of Rural Roads ADAMS COUNTY_NEBRASKA STATE OF NEBRASKA.DEPARTMENT OF TRANSPORTATION PROJECT NO HSIP-STWD(203) STATE CONTROL NO.01063 STATEWIDE STOP SIGN PROGRAM THIS AGREEMENT is between Adams County,Nebraska_a local public agency ("LPA").and the State of Nebraska.Department of Transportation.("State"),and collectively referred to as the'Parties`. WITNESSETH WHEREAS.the Statewide Upgrade hosting STOP Sign Location of Rural Roads Team selected this statewide or local,safety project for funding with Federai-aid fundsthis project is identified as Project No HSIP-STWD(203),and WHEREAS,the project is for the purchase and mstailation of the STOP sign devices specified below.and WHEREAS.LPA wishes to participate in the selected Federal-aid project as evidenced Py the attached Resolution of the LPA identified as Exhibit"A-arc made a part of this agreement and WHEREAS,Federal-aid funds will be used in this project,therefore.all Federal-aid fund program requirements will apply,and WHEREAS.this agreement sets out the duties and responsibilities of the-Parties',and WHEREAS,the Federa share payable on this project will be a maximum of 100 percent of the eligible and participating costs:.the LPA's share will be the remaining 0 percent of the eligible and participating costs,and LPA will also be responsible for al other nonparticipating or ineligible costs, NOW THEREFORE.in consideration of these facts,the parties hereto agree as follows: SECTION 1. DESCRIPTION OF PROJECT This project is for the purchase of the following described STOP Sign devices, Sion ooeon El OP sign 1R1'1.30;Wand reflertwe ship nuemated Square Steel Tune(P551-1 dual supust stub STOP AHEAD sign IV23-1 30 symbol)wi yellow refietl;ve sine PSST Post wipOsi stub Sion Oaeon 2 STOP sign(R1-i-30)cited reflective saw 12'Pertorated Squa-r.Siam Tube(PSSn post wlpost stub Sian Oeson STOP AHEAD sign t423.1-30 symbol)w'yellow renown sine 12'?SST Post wipost stub Project Number HSIP-STWD(203) Agreement No.BL2393 Control Number 01063 Sign Option Number of Packages I Option 1. 104 Option 2 252 Option 3 55 The STOP signing devices shall be installed at the locations identified or the location prov'iee on County intersection list,attached hereto as Exhibit"8'and hereby made a part of this agreement 5FCTION 2. LPA RESPONS181UTIO A. Receipt and Installation Requirements LPA shall ensure that at STOP signing devices 1) have been received and are in good condition 21 conform to the requirements of the Manual on Uniform Traffic Control Devices (MUTCD)that is current at the time the horizontal curve signing devices are received oy LPA 3) colli be installed at the locations set out on Exhibit 18'by June 30,2025 41 were installed 1n accordance with MUTCD.see Exhibit"C" B. Service Providing (This section is intentionally left blank). C. Contract Letting (This section is intentionally left bank) 0. Contractor Oversight (This section is intentionally left blank) E. Certificate of Completion LPA shall submit a Certificate of Completion within 45 days of protect completion to the State venymg that LPA has met the Receipt and Installation requirements of Section 2A. F. Maintenance Upon project completion the LPA snail,at its own cost protect and maintain the STOP signing devices in proper condition and it working order.In the event the STOP signs are loststolen.damaged or destroyed.LPA shall be responsible for replacing or repairing the horizontal curve signing devices at LPA's own cost G. Finan 1 The total project cost is currently estimated to be$77.470.12(100%federal funding). costs may increase cr decrease due to vanatioos between the estimated and actual Program costs Protect Number HSIP-STWD(203) Agreement No.BL2393 Control Number 01063 H. Documentation The LPA shall maintain all correspondence,documents.accounting records and other evidence pertaining to costs incurred and shall make such matenal available at its office at all reasonable times during the contract period and for three(31 veatg from the date of project close out,such records shall be available for inspection by the State and the FHWA or any authorized representatives of the Federal government and copies thereof shall be furnished by the LPA 4 requested. I. Federal-aid Reautrements The LPA agrees to comply with Federal-aid project requirements applicable to projects of this type including,but not limited to.23 C.F.R.,49 OF R.,and the LPA Guidelines Manual for Federal-aid Projects.in order for this transportation project to be eligible for Federal funding. i. Indemnity The LPA agrees to hold harmless.indemnify,and defend the State and FHWA against all liability.loss,damage.or expense.including reasonable attorney's fees and expert fees,that the State and/or FHWA may suffer as a result of claims,demands,costs.or judgments ansing out of LPA's project and the terms of this agreement. J. Federal-aid Requirements The LPA agrees to comply with Federal-aid project requirements applicable to projects of this type including but not limited to.23 C.F R.,49 OF R.,and the LPA Guidelines Manual for Federal-aid Projects.in order for this transportation project to be eligible for Federal funding. SECTION 3.STATE RESPONSIBILITIES The State.when necessary,shall be responsible for 1) Developing plans and technical requirements for the purchase,fabrication. construction and installation of the STOP signing devices) 2) Ordering the STOP signing devices. 3) Providing for delivery of STOP devices to the location(s)designated by the LPA. 4) Assisting LPA in resolving issues of funding eligibility. SECTION 4. SUSPENSION OR TERMINATION A Suspension The State.in its sole discretion,reserves the night to suspend both(1)State's work on this project and(2)LPA's right to incur any additional reimbursable costs on the project Project Number.HSIP-STWD(203) Agreement No,812393 Control Number 01063 when the State determines that there are issues related to project performance responsiveness,quality or eligibility that must be corrected by LPA. The State shall provide LPA with notice of the suspension including a description of the reason(s)for the suspension a timet-amo for LPA to correct the deficiencies.and when applicable,a description of the actions that must be taken for the State to revoke the suspension. A suspension may also be imposed by the State for arty of the reasons listed in the Termination suosection below,or for any significant change in the scope of the project that has not been previously approved by the State or FHWA. Failure to correct the deficiencies identified m a suspension will be grounds for the loss of eligibility for federal funding for the project and for termination of this agreement e Terminator This agreement may be terminated for the following reasons. The State and the LPA,by mutual written agreement,may terminate the agreement at any time 2 The State may terminate this agreement for the following reasons a A decrease or shift in available federal-aid funding that will in the sole discretion of the State,make it unlikely or not feasible for the project to be prioritized to receive federal-aid funding. b. LPA's violation of or failure to meet the requirements for Federal-aid local projects found in federal,state,or local raw or policyor the LPA Guidelines Manua! c. A notice or declaration of FHWA or the State that any part of the project is or has become ineligible for federal funding. d. LPA's failure to sign any State drafted or approved project agreement including supplemental agreements or certilicabon. e LPA's failure to pay in full the local snare specified in any agreement within 30 days atter receipt of an invoice from the State. f. LPA's breach of a provision of this agreement g LPA's failure to cause the protect to oe constructed according to the approved project plans and specifications. 3. The LPA may terminate the agreement upon thirty(30)days written notice of termination to the State,subject to the IPA meeting the conditions of paragraphs 5 and 6 below Project Number HSIP-STWD(203r Agreement No.6L2393 Control Number.01063 4 Prior to the State terminating this agreement.the State shall provide written notice to the LPA of the basis for termination and,when applicable,provide the LPA thirty(30) days to properly resolve all issues identified by the State 5. Whenever the project is terminated for any reason.LPA shall(a)repay the State all Federal-aid funds that have been expended for the project and(b)pay State for all of State's costs associated with the project Further,the LPA will thereafter be solely responsible for all costs associated with LPA's project 6 LPA may not terminate this agreement after the State has placed an order to procure honzontai curve signing devices notwithstanding paragraphs 3 and 4 above. SECTION 5 LAWFUL PRESENCE IN USA AN EQRK ELIGIBILITY STATUS_PROVISIONS The LPA agrees to comply with the requirements of Neb.Rev.Stat.§4-108 to 4-114 with its Federal-ad project,including.Out not limited to,the requirements of§4-114(1)(b))to place in any contract ft enters into with a public contractor a provision requiring the public contractor to use a federal immigration venficaton system to detennme the work eligibility status of new employees physically performing services within the State of Nebraska. SECTION 8 FAIR EMPLOYMEN?_PRACTIQES_ACJ The LPA agrees to abide by the provisions of the Nebraska Fair Employment Practice Act as provided by Nebraska Revised Statute,Section 48-1101 through 48-1126(Reissue 1988),and all regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation.Title 49 CFR,Parts 21 and 27 are hereby made a part of and included in this agreement by reference. SECTION 7 GENERAL COMPLIANCE WITH LAWS The LPA hereby agrees to compiy with all feoeral,state and local laws and ordinances applicable to the work in effect at the time of the work. SECTION 8 DRUG-FREE WORKPLACE POLICY The LPA shall have an acceptable and current drug-free workplace policy on file with the State SECTION 9 OISA(31LITIES ACT The LPA agrees to comply with the Americans with Disabilities Act of 1990(P.L.101- 366),as implemented by 28 CFR 35,which is hereby made a part of and included in this agreement by reference Project Number HSIP-STWD(203) Agreement No.812393 Control Number,01063 SECTION 10.NON-DISCRIMINATIQN A. Compliance with Regulations: During the performance of this agreement,the IPA,for itself and its assignees and successors in interest.,agrees to comply with the regulations of the DOT relative to nondiscrimination in federally-assisted programs of the DOT(49 CFR 21 and 27,hereinafter referred to as the Regulations),which are hereby made a part of and included in this agreement by reference. B Nondiscrimination: The LPA,with regard to the work performed by it after award and prior to completion of this agreement,shall not discriminate on the oasis of race,color,sex.or national origin in the selection and retention of Subcontractors,including procurements of materials and leases of equipment. The LPA shall not participate either directly or indirectly in the discrimination prohibited by 49 CFR 21.5,including employment practices when the agreement covers a program set forth in Appendixes A.B,and C of 49 CFR 21. C. Solicitations for Subcontracts.Including Procurements of Materials and Equipment. In all solicitations either by competitive bidding or negotiation made by the LPA for work to be performed under a subcontract including procurements of materials or equipment.each potential Subcontractors or supplier shall be notified by the LPA of the LPA's obligations under this agreement and the Regulations relative to nondiscrimination on the basis of race, color.sex.or national origin. D. Information and Reports: The LPA shall provide all information and reports required by the Regulations,or orders and instructions issued pursuant thereto,and shall permit access to its books.records,accounts.other sources of information,and its facilities as may be determined py the LPA.State or FHWA to be pertinent to ascertain compliance with such Regulations.orders,and instructions. Where any information required of an LPA is in the exclusive possession of another who fails or refuses to furnish this information,the LPA shall certify to the LPA.State or FHWA,as appropriate,and set forth what efforts it has made to obtain the information. E. Sanctions for Noncompliance: In the event of the LPA's noncompliance with the nondiscrimination provisions of this agreement,the LPA will impose such agreement sanctions as it or the State and FHWA may determine to be appropriate.including but not Lmited to withholding of payments to the LPA under this agreement until the LPA complies, and/or cancellation.termination,or suspension of this agreement,in whole or in part F. Incorporation of Provisions: The LPA shall induce the provisions of paragraphs A through E of this section in every subcontract,including procurements of materials and leases of Project Number.HSIP-STWD(203) Agreement No.BL2393 Control Number'01063 equipment,unless exempt by the Regulations,orders,or instructions issued pursuant thereto.The LPA shall take such action with respect to any subcontract or procurement as the LPA,State or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance,provided however,that in the event a LPA becomes involved in or is threatened with litigation with a Subcontractor as a result of such direction,the LPA may request tnat the LPA enter into such litigation to protect the interests of the LPA and,in addition,the LPA may request that the State and United States enter into such litigation to protect the interests of the State and United States. SECTION 11. ENTIRE AGREEMENT This instrument embodies the entire agreement of the Parties. There are no promises. terms,conditions,or obligations other than contained herein,and this contract supersedes all previous communicationsrepresentations,or other contracts or contracts,either oral or written hereto. IN WITNESS WHEREOF.the Parties hereby execute this agreement pursuant to lawful authority as of the dates below indicated EXECUTED by the LPA this day of ,2023. WITNESS: ADAMS COUNTY,NEBRASKA LPA Clerk Chairperson,County Board EXECUTED by the STATE this day of 2023. STATE OF NEBRASKA DEPARTMENT OF TRANSPORTATION Jodi Gibson Local Assistance Division Schmidt presented bids received for a tractor mower.Schmidt has reviewed the bids and recommends purchasing the 2023 Case IH from Titan Machinery totaling$56,700.00. Motion by Reams, seconded by Stromer to approve the purchase of a 2023 Case IH tractor/mower from Titan Machinery totaling$56,700.00. Roll Call,Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None TRACTOR/MOWER PURCHASE Possible Award an 9-5-23 TITAN MACHINERY LANDMARK BUTLER AG EQUIPMENT GRAND KUBOTA YEAR 2023 2023 2022 2023 MAKE CASE III John Deere MASSEY-FERGUSON KUBOTA MODEL IFARM 95A . 5100E Cab MI74710 MF-09IIIx12-1 _ LIST BID rrncir $62,500.00 $70,531.02 $76,458.85 S90,862.00 MOWER_ CASE MD 93 DISC John Deere 8280 Disc NO AID NO BID MOWER(7 DISC) Mower(7 Discs) LINT BID PRICE $16,500.00 $15,359.76 NO BID NO BID TRADE-IN VALUE OP 129 (13,500.00) ` 2005 CASEmJX951JF0269a (21,000.00) (14,200,00) (34,762.00) TRADE-IN VALUE OF 21120 MD93 (8,800.00) (8,500.00) NO BID NO BID Total Cost $56,700.00 $56,390.78 $62,258.85 $56,100.00 ESTIMATED DELIVERY DATE In Stack Tractor In Stock,Mower on Undetermined t}ndctermintxi Order 2-year Warranty Tractor 2-year/2000hr Tractor 24 month I 2000hrs Std Warranty Warranty I-year Warranty Mower 1-year Warranty Mower 36 month 1200 hour Major SPECIALS Drive Train Components Did not provide 3-year Warranty Cutting Bar 5-Year Emission Coverage 12 month loader attachments 5-Year Emission Coverage AFFP NOTICE The Adams County Hig Affidavit of Publication STATE OF NEBRASKA} SS NO'ITCE COUNTY OF ADAMS} The Marne County Highway Department le consldedng purchase of a 2023 Case lH Fennel 95A tractor and a Case IN MD93 Rotary mower though Sourcewee Contract#7964g.In consideration of purchasers),Adams County wt receive Bide until 10:00 am.on September 4,2023.Specification may be obtained Jessica Etheridge,being duly sworn,says: from the°face or the County Highway Superintendent or by ceiling 402-461-7112. That she Is Public Notices Clerk of the Hastings Tribune,a Bids shay be submitted to the Mame County Highway Superintendent®416 N daily newspaper of general circulation,printed and Mans central Me,Juniata NE 65955 until 10:00 a.m.on September 4,2023 at ,the Mame published in Hastings,Adams County,Nebraska:that the �County Sc of Commissioners they we be mblicly swelreevieew mei nd co�rwdder weird pterrterat'their reader publication,a copy of which is attached hereto,was meeting at the Mama County courtrioune,Com Isstonors Room published In the said newspaper on the following dates: Dated this 29th day of August,2023. August 29,2023 Greg Anderson Greg Schmidt County Highway Co-Superintendents Adams County,NE August 26,2023 ZNEZ That said newspaper was regularly issued and circulated on those dates. IGNED: PNotices Su.bed to a R •rn to me this 29th day of August 2023. I_, Tami Humphreys,Notary P etc,Adams County, Nebraska My commission expires:April 06,2025 g:ERAL+orArn r___________________ PigEp+ � !yoaae aw.A.946(9919,09.9 waa2ms 00000187 00093356 ADAMS COUNTY HIGHWAY DEPT. 415 N ADAMS CENTRAL AVE JUNIATA,NE 68955 Adams County Victim/Witness Advocate,Jacki Norris, presented the board with a letter to the Nebraska Commission on Law Enforcement&Criminal Justice,giving notice that Adams County's request to de-obligate funds due to a resignation in the county attorney's office. Norris has reviewed the document and is requesting approval. ADAMS COUNTY ATTORNEY DEPUTIES DONNA FEGLER DAISS David Bergin Adams County Courthouse Cassie Baldwin P.O.Box 71 Dale Callahan Hastings,NE 68901 VICTIM SERVICE: JACKI NORRIS t ;`, jnorris®adamscountyne.go August 15,2023 Nebraska Commission on Law Enforcement&Criminal Justice 301 Centennial Mall South,5th Floor PO Box 94946 Lincoln,NE 68509-4946 RE:NCC Grant#106-2022-VA1038 YR 2 Dear Grant Administrator: Adams County Attorney Victim Services deobligates VOCA funding in the amount of $10,997.93 due to the funding deadline of June 30,2023. Funding was not spent for the following reasons: 1. Bilungual Advocate left her position. 2. Illness Thank you, Jacki Norris,Director Lee Hogan Adams County Attorney Adams County Board Chairman Victim Services Motion by Johnson, seconded by Reams to approve the chairman signing the de-obligation of funds letter presented by Norris. Roll Call,Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None Motion by Patterson, seconded by Stromer to meet in closed session [for the protection of the public interest] to discuss contract negotiations. Roll Call,Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None Entered closed session at 9:52 am Motion by Patterson, seconded by Reams to exit closed session and resume regular session. Roll Call, Ayes:Stromer, Larsen, Hogan,Johnson, Reams, Neumann, Patterson Nays: None Absent: None Regular session resumed at 10:07 am Meetings adjourned by unanimous consent. COUNTY GENERAL ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 263.25 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 624.00 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 955.50 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 469. 96 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 750.75 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 283.73 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 703.96 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 97 .50 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 331.50 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 429.00 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 2, 335.15 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 1,268.48 ADAMS COUNTY TREASURER,VICTIMS ASSISTANCE PROGRA 195.00 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 2,784. 63 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 97 .50 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 165.75 ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 186.23 HOMETOWN LEASING,COPY MACH RENT 196.27 MICROFILM IMAGING SYSTEM, EQUIPMENT RENTAL - OFFICE 35.00 EAKES OFFICE SOLUTIONS, SUPPLIES - OFFICE 342. 16 HOMETOWN LEASING,EQUIPMENT RENTAL - OFFICE 368.07 MIPS,DATA PROCESSING COSTS 1, 489.31 HOMETOWN LEASING,COPY MACH RENT 153.24 COMFORT INN, TRAVEL EXPENSES 689.70 CULLIGAN OF HASTINGS, SUPPLIES - OFFICE 21.45 MICROFILM IMAGING SYSTEM,OFFICE EQUIPMENT 25.00 NACO,DUES, SUBS,REGIST,TRAINING 55.00 NEBRASKA DEPT OF PROPERTY, DUES, SUBS,REGIST,TRAINING 290.00 VANGUARD APPRAISALS INC, DATA PROCESSING COSTS 4, 100.00 WEST CENTRAL DISTRICT,DUES, SUBS,REGIST,TRAINING 200.00 MENARDS, DATA PROCESSING COSTS 14. 99 ADAMS COUNTY CLERK OF DIST CRT, DISTRICT COURT COSTS 1, 636.00 EAKES OFFICE SOLUTIONS, SUPPLIES - OFFICE 150. 63 EAKES OFFICE SOLUTIONS,EQUIPMENT RENTAL - OFFICE 63.79 DEREK TERWEY,MENTAL HEALTH BOARD COSTS 299.00 JENIFER KNUTH,MENTAL HEALTH BOARD COSTS 356.50 JERI L HINRICHS,MENTAL HEALTH BOARD COSTS 299.00 BOCKSTADTER & GLEN LAW LLC,MENTAL HEALTH BOARD COSTS 384 .10 BEV PATITZ,MENTAL HEALTH BOARD COSTS 384 .10 RUANN ROOT,MENTAL HEALTH BOARD COSTS 326. 60 MICROFILM IMAGING SYSTEM,EQUIPMENT RENTAL - OFFICE 175.00 RUSS'S MARKET, JUROR FEES 228.35 ABETECH, SUPPLIES - OFFICE 550.36 ADAMS COUNTY COURT,COUNTY COURT COSTS 5, 670.54 WALMART - CAPITAL ONE,COUNTY COURT COSTS 117 .88 CITY OF HASTINGS,MISCELLANEOUS 120.00 CULLIGAN OF HASTINGS,EQUIPMENT RENTAL - OFFICE 102. 60 DAS STATE ACCOUNTING,EQUIPMENT RENTAL - OFFICE 36.00 EAKES OFFICE SOLUTIONS, SUPPLIES - OFFICE 806.80 HOMETOWN LEASING,EQUIPMENT RENTAL - OFFICE 1, 138 . 94 MICROFILM IMAGING SYSTEM,EQUIPMENT RENTAL - OFFICE 582. 14 OWENS EDUCATIONAL SERVICES INC, JUVENILE COURT COSTS 325.00 BOCKSTADTER & GLEN LAW LLC,ATTRNY FEES-COURT APPOINT 1, 008.70 BRADLEY LAW OFFICE PC,ATTRNY FEES-COURT APPOINT 677 .75 DIER OSBORN & COX PC LLO,ATTRNY FEES-COURT APPOINT 1, 682 . 98 FYE LAW OFFICE,ATTRNY FEES-COURT APPOINT 10,735. 63 LANGVARDT VALLE & JAMES PC,ATTRNY FEES-COURT APPOINT 152.00 LIESKE LIESKE & ENSZ,ATTRNY FEES-COURT APPOINT 11, 113. 15 MURRAY LAW PC LLO,ATTRNY FEES-COURT APPOINT 9, 188.42 SKALKA & BAACK LAW FIRM,ATTRNY FEES-COURT APPOINT 7, 061.50 SULLIVAN SHOEMAKER PC LLO,ATTRNY FEES-COURT APPOINT 377 .50 THEOBALD LAW OFFICE,ATTRNY FEES-COURT APPOINT 5,264 .50 ALLEN TREE SERVICE, SEED TREES PLANTINGS (EROS 875.00 BIG G COMMERCIAL HARDWARE INC , SHOP TOOLS 104.26 EAKES OFFICE SOLUTIONS, JANITORIAL SUPPLIES 524. 96 HASTINGS UTILITIES,UTILITIES 11, 212.84 MENARDS,CHEMICALS UN RES 49.99 MENARDS, SUPPLIES - SHOP 89.78 MENARDS,BUIDING & GROUNDS SUPPLIE 5. 99 MIPS,MISCELLANEOUS LABOR 538.06 MIPS,EQUIPMENT RENTAL - OFFICE 190.00 BRITE UPSTATE WHOLESALE SUPPLY,ENGINEERING & TECHNICAL E 5, 273.00 CITY OF HASTINGS,CONTRACT SERV 9, 780.86 CIVIC RESEARCH INSTITUTE INC, DUES, SUBS,REGIST,TRAINING 199. 95 COMPUTER HARDWARE INC, SHERIFF COSTS 39. 90 CONNER PSYCHOLOGICAL SERVICES ,MERIT COMMISSION EXPENSES 850.00 COOPERATIVE PRODUCERS INC,EQUIPMENT - FUEL 182. 45 EAKES OFFICE SOLUTIONS, SUPPLIES - OFFICE 209. 96 EAKES OFFICE SOLUTIONS, DATA PROCESSING COSTS 432. 64 ARNOLD MOTOR SUPPLY LLP,EQUIPMENT - FUEL 59. 99 HASTINGS FORD-LINCOLN,EQUIPMENT - FUEL 234. 95 HOMETOWN LEASING, PRINTING/PUBLISHING 60.87 JERRY SPADY CADILLAC GMC INC,EQUIPMENT - FUEL 1, 429.59 KELLY' S ALIGNMENT & BRAKES,EQUIPMENT - FUEL 85.00 KENESAW MOTOR CO INC,EQUIPMENT - FUEL 1,204.84 LTA TOWING LLC,EQUIPMENT - FUEL 187 .50 LYNN PEAVEY COMPANY, SHERIFF COSTS 124. 65 MIPS, DATA PROCESSING COSTS 68. 90 NAPA AUTO PARTS,EQUIPMENT - FUEL 89. 99 NIRMA, SHERIFF COSTS 182.00 PLATTE VALLEY OF HASTINGS INC ,EQUIPMENT - FUEL 83.40 PLATTE VALLEY OF HASTINGS INC ,ENGINEERING & TECHNICAL E 1, 312 .05 PLATTE VALLEY OF HASTINGS INC ,RADIO REPAIR 82 .50 SAYLER SCREENPRINTING,SHERIFF COSTS 378.00 ADAMS COUNTY ATTORNEY,COURT RELATED COSTS 10.00 ADAMS COUNTY ATTORNEY,COURT RELATED COSTS 20.00 EAKES OFFICE SOLUTIONS, SUPPLIES - OFFICE 332 .58 ELITE COURT REPORTING SERV INC,COURT RELATED COSTS 570. 90 HALL COUNTY SHERIFF,COURT RELATED COSTS 32.22 HALL COUNTY SHERIFF, JUVENILE COURT COSTS 22. 11 MICROFILM IMAGING SYSTEM,EQUIPMENT RENTAL - OFFICE 510.00 PEOPLE SUBSCRIBER SERVICES, SUPPLIES - OFFICE 80.00 PHYSICIANS LABORATORY PC,AUTOPSY COSTS 2, 350.00 SHERMAN COUNTY SHERIFF,COURT RELATED COSTS 18.50 ALLO COMMUNICATIONS, INTERNET SERVICE 238 .74 ALLO COMMUNICATIONS,TELEPHONE SERVICES 1, 652 .78 ALLO COMMUNICATIONS, INTERNET SERVICE 641.49 DAS STATE ACCOUNTING,EQUIPMENT RENTAL - OFFICE 704.00 VERIZON WIRELESS,CELL PHONES 133.54 ADAMS COUNTY JAIL/SHERIFF,BOARD OF PRISONERS - FOOD 2, 043.11 AUCA CHICAGO LOCKBOX, JANITORIAL SUPPLIES 124.24 BERTS PHARMACY,MED-HOSP PRISONERS 24.54 BIG G COMMERCIAL HARDWARE INC , JAIL SUPPLIES 210.35 CALEB SCHROEDER MD LLC,MED-HOSP PRISONERS 570.57 CASH WA DISTRIBUTING,BOARD OF PRISONERS - FOOD 1, 722 .22 CENTRAL DENTAL GROUP,MED-HOSP PRISONERS 1,266.00 CHRIS' S CAR WASH,TRAVEL EXPENSES 120.00 CRAWFORD SUPPLY CO,COMMISSARY 106.08 CROSIER PARK PHARMACY,MED-HOSP PRISONERS 87.72 STATE OF NEBRASKA,MED-HOSP PRISONERS 1,778 .23 STATE OF NEBRASKA,BOARD OF PRISONERS - FOOD 11, 022 .70 EAKES OFFICE SOLUTIONS, JANITORIAL SUPPLIES 132 .56 EAKES OFFICE SOLUTIONS, JAIL SUPPLIES 41. 98 EAKES OFFICE SOLUTIONS, DATA PROCESSING COSTS 244.28 ENCARTELE INC,COMMISSARY-PHONE CARDS 1, 500.00 HALL COUNTY DEPT OF CORRECTION,MED-HOSP PRISONERS 6.21 HALL COUNTY DEPT OF CORRECTION,BOARD OF PRISONERS - FOOD 3, 694 .00 HAMILTON COUNTY SHERIFF DEPT,BOARD OF PRISONERS - FOOD 3, 600.00 HOMETOWN LEASING,OFFICE EQUIPMENT 214. 96 ISLAND VIEW DENTAL PC,MED-HOSP PRISONERS 445.00 JERRY SPADY CADILLAC GMC INC,TRAVEL EXPENSES 544.53 JIM' S U-SAVE PHARMACY,MED-HOSP PRISONERS 61. 68 KEEFE SUPPLY COMPANY,COMMISSARY 653.42 KEITH'S DRIVE IN DRUG,MED-HOSP PRISONERS 411.85 MARY LANNING HEALTHCARE,MED-HOSP PRISONERS 594.03 MENARDS, JAIL SUPPLIES 59.76 MIPS,MISCELLANEOUS 68 .90 NIRMA,MISCELLANEOUS 260.00 NESBITT AND ASSOCIATES INC,BOARD OF PRISONERS - FOOD 5, 425.50 NORTH PLATTE FIRE DEPT,MED-HOSP PRISONERS 100.00 PHELPS COUNTY SHERIFF,MED-HOSP PRISONERS 732.49 PLATTE VALLEY OF HASTINGS INC , TRAVEL EXPENSES 14.75 PLATTE VALLEY OF HASTINGS INC , SAFETY EQUIPMENT 1, 670.00 PROTEX CENTRAL INC,OTHER EQUIPMENT REPAIR 495.89 US FOODS INC,BOARD OF PRISONERS - FOOD 884 .41 CENTURY LINK,TELEPHONE SERVICES 156.72 MIDWEST CONNECT, POSTAL SERVICES 124 .90 CITY OF HASTINGS,AMBULANCE COSTS 8, 428 .03 BIG G COMMERCIAL HARDWARE INC , SUPPLIES - SHOP 70.32 GRACES LOCKSMITH SERVICES, SUPPLIES - SHOP 50.00 HASTINGS UTILITIES,UTILITIES 429.32 ALLIED UNIVERSAL, SECURITY CONTRACTS BY OTH 4, 308 .00 KELLY SUPPLY CO,BUILDING REPAIR 826.09 FIRST CONCORD BENEFITS GROUP,CAFETERIA PLAN ADMIN FEES 370.00 MIDWEST CONNECT, POSTAL SERVICES 3, 000.00 MIPS,BUDGET PREPARATION COSTS 48. 92 MIPS, DATA PROCESSING COSTS 357.50 REGION 3 BEHAVIORAL HLTH SRVCS,MENTAL HEALTH SERVICES AC 6, 812 .63 STANARD APPRAISAL SERVICES INC,CONSULTING FEES 27, 550.00 ROAD - BRIDGE ADAMS COUNTY TREASURER,HEALTH REIMBURESMENT ACCO 3,201. 92 ACE/EATON METALS, INC,MATERIALS - CULVERTS 2, 067 . 60 AUTO GLASS EXPERTS LLC,RD EQ REP LABOR 125.00 ARNOLD MOTOR SUPPLY LLP, SMALL TOOLS, ETC. 278.49 ARNOLD MOTOR SUPPLY LLP,RD EQ REP PARTS 111.05 ARNOLD MOTOR SUPPLY LLP, SUPPLIES - SHOP 119.46 ARNOLD MOTOR SUPPLY LLP,RD EQ REP PARTS 21. 98 ARNOLD MOTOR SUPPLY LLP, SUPPLIES - SHOP 68 .07 ARNOLD MOTOR SUPPLY LLP, SMALL TOOLS, ETC. 155. 99 ARNOLD MOTOR SUPPLY LLP, SUPPLIES - SHOP 336. 19 BOSSELMAN ENERGY INC,EQUIPMENT - FUEL 14, 123.87 BGNE,EQUIPMENT - FUEL 741.48 BUFFALO COUNTY HWY DEPARTMENT ,EXPRESS/FREIGHT 6.82 BUFFALO COUNTY HWY DEPARTMENT ,RD EQ REP PARTS 268.02 CENTRAL NEBRASKA EQUIPMENT,RD EQ REP PARTS 49.20 CINTAS CORPORATION #449,TOWEL/CLEANING AGREEMENTS 51.70 CINTAS CORPORATION #449, JANITORIAL SUPPLIES 40.47 CINTAS CORPORATION #449,TOWEL/CLEANING AGREEMENTS 103.40 CITY OF HASTINGS,WASTE DISPOSAL 362 .88 COOPERATIVE PRODUCERS INC,MACH EQ TIRES & REP 522 .20 COOPERATIVE PRODUCERS INC,MISCELLANEOUS 28.88 COOPERATIVE PRODUCERS INC,MACH EQ TIRES & REP 10.80 FILTER CARE, SUPPLIES - SHOP 338 .60 FLEET PRIDE INC,RD EQ REP PARTS 189. 99 GERHOLD CONCRETE COMPANY INC,MATERIALS - CONCRETE, ETC 1, 926.88 HOMETOWN LEASING,EQUIPMENT RENTAL - OFFICE 158. 96 ISLAND SUPPLY WELDING CO,EXPRESS/FREIGHT 15.00 ISLAND SUPPLY WELDING CO,WELDING SUPP/CHAINS 147 .27 KENESAW MOTOR CO INC,RD EQ REP LABOR 135.00 MID-NEBRASKA AGGREGATE INC,MATERIALS - GRAVEL & BORR 11, 615. 16 VILLAGE OF JUNIATA,OTHR RD/BRDG MAT-H20 FOR 29.00 NACO, DUES, SUBS,REGIST,TRAINING 260.00 NAPA AUTO PARTS, SUPPLIES - SHOP 192.21 NEBRASKA TRUCK CENTER,EXPRESS/FREIGHT 25.00 NEBRASKA TRUCK CENTER, FLARES FLAGS BARRICADES 498 . 96 NEWMAN TRAFFIC SIGNS, SIGNS 4, 379.21 POWER PLAN,RD EQ REP PARTS 1, 487.74 SANITARY OUTDOOR SERVICE INC, JANITORIAL SUPPLIES 86.75 VAN DIEST SUPPLY CO,CHEMICALS UN RES 1, 400.00 PRESERVATION & MODERNIZATION MICROFILM IMAGING SYSTEM, EQUIPMENT RENTAL - OFFICE 184.00 MIPS,MISCELLANEOUS LABOR 386.57 MIPS,DATA PROCESSING COSTS 473.58 ESCROW HOLDING FUND STATE OF NEBRASKA,MISCELLANEOUS 17, 500.00 LAW ENFORCEMENT CENTER BECKENHAUER CONSTRUCTION INC,BUILDING CONSTRUCTION/REP 826, 047 .52 HASTINGS UTILITIES,UTILITIES 4, 832.49 PROCHASKA & ASSOCIATES INC,ARCHITECTURAL FEES 16, 000.00 JUVENILE SERVICES CENTRAL MEDIATION CENTER, JUV GRANT COMMUNITY, 19-CB 280.00 CASA, JUV GRANT COMMUNITY, 19-CB 83, 104 . 64 Lee Hogan Ramona R.Thomas Board Chairman Adams County Clerk